Getting Underway – Engine room

Slides:



Advertisements
Similar presentations
Trystar Generator Docking Stations & Portable Power Cable
Advertisements

Inspected in port Shanghai from 26th to 28th Sept by NCL
B757 Review Questions.
Substation L1/ MCC L1 Update March 21 st, Current Location.
Lesson 38 Shipboard Power
Wheelchair Lift Training
© Blue Graphics Concept Sauer-Danfoss START-UP PROCEDURE PROPEL PUMP Instruction Sauer-Danfoss Belgium – T. Van Mossevelde.
Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.
KLINGE’S NMR 262 Two Independent Systems Integrated into one Unit This Requires Special Features:  Total Redundancy of Refrigeration Components  Total.
A cross-section of Rainier at stations 3 and 4 looks something like this - looking aft. Fuel for Station No. 3 is pumped from the tanks below; to ships.
B757 Review Questions.
Neutron Detector Shutdown Procedure 1.Turn Off Photomultiplier Tube High Voltages There are two HV channels per red module, each with it’s own black dial.
SHIP NOMENCLATURE. DO NOW  In the United States, we commonly use the English system of measuring length & distance (feet, inches, miles…).  In most.
Three Phase Power Three Phase Motors
General sea terms.
The Development of Specialized Skills Ship-Handling & Navigation Operation of Deck Equipment, ie. Anchors, Knot Tying, Line Handling Dealing with Emergencies,
2 Instructor Training MPTT Flow Loop System VLP-TRN-MPTT.
APPROVED TRAINING MANUAL’S LESSON PLANS AND COURSEWARE STAR MARIANAS AIR, INC. Recurrent – Flight Crew Part III – Aircraft Ground Training Section 2 –
Mercury G3 Service Tool Training Overview
exhaust regulator valve
Mercury G3 Service Tool Training Overview When opening G3 you will start at this screen first import thing to look for is communication.
Boat Seamanship B asic E ngineering C asualty C ontrol E xercises.
Hardware Training Product: ITMS2.
Diesel Generator AFT FWD View From Port Side
Continue FCU150 Trash Compactor. Normal ModeDelay Mode.
STBD. BOAT DECK MONITOR HEAVY CORROSION FOUND INSIDE ELECTRICAL MOTORS RENDERING THE MONITOR NON-OPERATIONAL.
Diesel Fuel - Fill Place all spill safety equipment where needed
DIESEL FUEL FILL 1.Secure Fireboat 2 to fueling dock, fueling vessel, or vessel to receive fuel (Fig ). 2.Develop communications as needed, including.
NOVEC Fire Suppression System
D/C Power Systems General Locations. There are two types of D/C Power sources on the new fireboat: 24 Volt 12 Volt These are further subdivided into three.
Fire Fighting Systems Fi Fi Mains ●White System: This system has a lower output as far as volume goes. This main supplies 3x Eductor/Hydrants (500 gpm).
Weekly Checks Monday – VSP Room Tuesday – Pilothouse System Controls Wednesday – Starboard / Engine Room Thursday – Foam Room Friday – Port / Engine Room.
Monday – VSP Room weekly checks Visually Check: Hvac system for leaks & valve settings Fresh water system for leaks & valve settings VSP linkage Autopilot.
Potable Water System General Locations and Operations.
BOAT Regulatory Gross Tonnage – 199 Registered Length – 96’7” Registered Breadth – 29’ Registered Depth - 13’3” Draft – 14’ 6” Air Draft – 46’
Power Distribution System General Location. Power Distribution The Main Switchboard is the hub of the electrical distribution system. Everything ties.
Red/Green Fire Fighting Systems Fi Fi Mains ●Red System: Port Side Fire Main supplies two Monitors. M7 (6000) gpm on centerline on the fwd Wheelhouse top.
PROSSER PUMP Long Beach Fire Department. BASIC SET- UP Components Main dewatering pump Junction box Attached power cord Additional extention cord.
A/C Power Systems General Locations. This module will cover the General Locations of the A/C Power Systems through out the vessel. The A/C Power Systems.
Internal Communications Systems
Breathing Air Scott-RevolveAir Charge station with X4 controller. Storage Auto-fill capable. Unit can fill 2 SCBA bottles at a time behind a burst shield.
Fwd. Anchor Windlass / Capstan
Jump to first page 1 Marine Guard Actual Marine Guard 2000 Security System Installation.
What is POWERGRID??? The Power Grid Corporation of India Limited (POWERGRID), is an Indian state-owned electric utilities company headquartered in Gurgaon,
Fire/General Service/Ballast Pumping Systems
Bilge Pumping Systems General Locations.
Machinery Cooling Water System Locations and Operations.
Forward & Aft Searchlight Operate Forward & Aft Searchlight.
1 FB 2 STARTING PROCEDURES RADIO MASTER SWITCH UP IS “ON” Assess readiness to get underway Energize the following: 1) Radio Master Switch, Panel DC-1 NOTE.
Shore Power System General Location. Shore Power Power comes on to the vessel in the form of 480 Volt, Three Phase, 60 Hz Alternating Current (A/C) electricity.
Fire Detection System General Locations and Operation.
Coolant Fill Coolant Check and Fill. Oil Fill & Dip Stick Main Engine Oil Fill Dip Stick Delo 400 – 40 wt. Engine Oil.
4) Design the logic to control the motor on a simple remote control car. There are two buttons on the remote control for the motor. If neither button is.
Kobukson. Toyotomi Hideyoshi Yi Sun-Sin Kobukson or Turtle Ship.
Shore Power Connection Check the connection on the boat Check the breaker on the dock ON OFF.
Wednesday – starboard side engine room weekly checks Cycle all valves on the starboard side of the engine room Check all systems, connections, valves,
Flammable Liquids Directorate of Training and Education
Initial Pilot Ground School
Last updated: 6/28/2016www.alto-shaam.com Rotisserie Training Rotisserie.
ARÇELİK TİCARİ KLİMA EĞİTİM DÖKÜMANI APPENDIX.
Louisiana State University Radiation Safety Office
General Alarm Used by the Pilot house to get an urgent message to the whole crew To sound the general alarm the lever is located at both Pilot consoles.
WATER DISPLAY Deck Operations.
Switch Blocks check a value and choose a path based on that value
February 2019.
Firefighting equipment
Understanding what happens when fuel burns off.
Removal of salon doors on 1968 Roamer Sedan.
AUTOMATIC AIR-CONDITIONING SYSTEM OPERATION
Presentation transcript:

Getting Underway – Engine room Engineer – below deck Entry – bulwark door Portside mid-ship bulwark door normally open in quarters

Getting Underway – Engine room Engineer – below deck Entry – bulwark door Located on the portside @ amidships Two doors Aft door is normally open when in quarters

Getting Underway – Engine room Equipment room door - portside Engineer – below deck Normally open in qtrs AM hrs.

Getting Underway – Engine room Equipment room door - portside Engineer – below deck Two-dog door with a keyed handle The door is normally unlocked Keys are kept: Key locker on the boat (2) Key locker in the captains office (2)

Getting Underway – Engine room Engineer – below deck Equipment room passageway Primary main engine Pre lube panel To engine room ladder (down) / (up)

Getting Underway – Engine room Equipment room passageway Engineer – below deck From the equipment room door the passageway runs forward to the multi-purpose room The main engine pre-lube panel is found aft on the portside. This is the primary location to initiate the main engine pre-lube cycle Engine room ventilation fans are controlled from the pre-lube panel, on /off & low / med / high

Getting Underway – Engine room Engine room door – normally closed Engineer – below deck Down

Getting Underway – Engine Room Engine room door Engineer – below deck ENGINE ROOM DOOR – MAIN ACCESS TO ENGINE ROOM LOCATED JUST FWD OF PRELUBE PANEL ON STARBOARD SIDE OF EQUIPMENT ROOM DOOR OPENS OUT & INTO EQUIPMENT ROOM, AND IS NORMALLY IN THE CLOSED POSITION DOOR IS 36” WIDE AND 64” TALL

Getting Underway – Engine Room Engine room ladder Engineer – below deck

GETTING UNDERWAY – ENGINE ROOM ENGINE ROOM LADDER ENGINEER – BELOW DECK MAIN ACCESS TO ENGINE ROOM , FOAM room AND VSP ROOM LADDER HANDRAILS ARE 30” APART

Getting Underway – Engine Room Generator start @ alarm panel Engineer – below deck Alarm Panel Primary Generator start p&s Pre lube panel – main engine engines - local control

GETTING UNDERWAY – ENGINE ROOM GENERATOR START AND ALARM PANEL ENGINEER – BELOW DECK Upper panel – generator start-up Lower panel – local main engine pre lube station Located port sided of engine room ladder, engine room

Getting Underway – Engine Room Slide bar – switch panel Engineer – below deck Directs power supply selection / generators p&s & shore power

GETTING UNDERWAY – ENGINE ROOM SLIDE BAR – SWITCH PANEL ENGINEER – BELOW DECK Slide bar located bottom of electrical panel Used to select shore power, port or starboard generator use Pick one and it blocks all other breakers from being activated

Getting Underway – Engine Room Engineer - below deck Generator meters port & starboard

GETTING UNDERWAY – ENGINE ROOM ENGINEER – BELOW DECK GENERATOR METERS PORT & STARBOARD Generator meters port and starboard Located above the slide bar switch on electrical panel Top row of gauges monitor port gen Lower set monitor starboard gen Used to monitor output of generator in use

Getting Underway – Engine Room Communications Engineer – below deck Intercom phone

GETTING UNDERWAY – ENGINE ROOM COMMUNICATIONS ENGINEER – BELOW DECK Phone communications Located top right corner of electrical panel Used to check with pilot to make sure voith units are in neutral pitch Before starting main engines

Getting Underway – Engine Room Engineer - below deck Local Main engine start panel starboard,#1 engine

GETTING UNDERWAY – ENGINE ROOM ENGINEER – BELOW DECK LOCAL MAIN ENGINE START PANEL - STARBOARD Local main engine start panel #1 engine Located bottom of engine room ladder, directly over #3 pump

Getting Underway – Engine Room Engineer – below deck local main engine start panel port,#2 engine

Getting Underway – Engine Room Local main engine start up, port engine #2 Local main engine start up panel ,#2 engine Located bottom of engine room ladder and right, (port side of boat) over #4 pump

Getting Underway – Engine Room Engineer – below deck Main ladder out of engine room

Getting Underway – Engine Room After getting generator on line, and starting both main engines proceed to pilothouse

Getting Underway – Engine Room Engineer – below deck Engine room door

Getting Underway – Engine Room Engine room door Come back up engine room ladder to asile between equipment room and ems room Go right (forward)

Getting Underway – Engine Room Engineer – below deck Ladder from ems room up to pilothouse

Getting Underway – Engine Room Engineer – below deck Ladder to pilothouse Ladder located port side forward of multi-purpose room

Getting Underway – Engine Room Engineer – below deck Ladder from boat deck to pilothouse

Getting Underway – Engine Room Engineer – below deck Ladder continuing from multi-purpose room to pilothouse

Getting Underway – Engine Room Engineer – below deck Engineer station, pilothouse forward

Getting Underway – Engine Room Engineer – below deck Forward engineer station in pilothouse, port side

Getting Underway – Engine Room Engineer – below deck Engineer station pilot house, aft

Getting Underway – Engine Room Engineer – below deck Aft engineer station in pilothouse, starboard side