Planning and Organising Two Plant and Equipment Excavation calculation ConstructioConstrucc 2 : 2012 Construction Practice 2 : 2012 Presenter Tony Bosnich/Glenn.

Slides:



Advertisements
Similar presentations
Lec 25: Ch2.(T&LD): Site planning
Advertisements

eQuest Quick Energy Simulation Tool
Lokotrack ST352 Presentation
ALO Planning & Assurance Requirements
E STIMATION 1 Excavation 2 lesson 5. E XCAVATION 2 Recap from excavation 1 Looking at site plans Desk top study Site Visit Unit pricing of excavation.
Front shovel, back hoe and loader. Group member: Lam Wai Kei Hui Tan La
Excavating and Lifting Hmwk Ch 2 # 1,2,5,8 Ch 3 #2,4,6,10.
Planning & Organising two Introduction to WBS Work Breakdown Structure Presenter Tony Bosnich Adapted from Taija Puolitaival Oct 2014 © Unitec New Zealand.
Humans Impacts on Land Objective 2.07
EM15 – Contractors COST MANAGEMENT
EXCAVATION, BARRIERS AND TIMBERING
Topic 7: Timber Subfloor Systems – Basic
PN UNC AMR Topic Workgroup Meeting 19 – Meter Reading.
Mechanisms of Weed Spread
Product Mix & Master Production Scheduling
Estimation 1 Lesson 4 - Excavation.
Lecture 2 Introduction to Earthmoving
Technical Analysis. Technical analysis of a project idea includes an in depth study of all technical aspects related to Technical analysis of a project.
1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary.
1. 2 Civil Engineering Practice Introduction Instructor: Dr. Attaullah Shah Lecture # 1 Department of Civil Engineering Swedish College of Engineering.
Construction Management Two 2014 Setting up Site Presenter Tony Bosnich Feb 2014.
The National Centre for Animal Care- Taking real world learning experiences into the 21 st century.
2010 Staff Development - Tony Judice. Highlight the area to be graphed. Highlight labels, in this case days of the week, and the values that apply to.
Scenario on airport works Session 5 Presentation 1.
Infrastructure that Supports the Construction Industry In order for the construction industry to function effectively there is a large amount of infrastructure.
Lab design Assignment 3 Unit 2.
Planning and Organising Two Plant and Equipment - Cranes- ConstructioConstru cc 2 : 2012 Construction Practice 2 : 2012 Presenter Tony Bosnich Glenn Edmonds.
Introduction to Microsoft Project 2013 Presenter Tony Bosnich 2016 © Unitec New Zealand.
P1 Assignment 3 Daniel Russell. Why is information stored? Organisations can use Information for a variety of reasons, many of these reasons can both.
PRODUCTION MANAGEMENT SOFTWARE. WHICH DO YOU PREFER? 2.
International Levee Handbook Overview of the handbook Chapter 10 Construction.
VIA / TCU 4th semester workshop S2016 Soil work and machines VIA University CollegeTCU-VIA Workshop – S20161 Factors to remember in the working process.
OPERATIONS MANAGEMENT STRATEGY 1. PRODUCT CHOICE 2. PROCESS CHOICE 3. FACILITIES CHOICE 4. QUALITY CHOICE.
Deep Residential Basement, Chelsea. Toureen Plant Toureen Plant Toureen Contractors City Basements Groundworks RC Frames Groundworks RC Frames Petrol.
Economies of Scale.
Substructure Groundworks - Hazards
Roles and responsibilities PM
Ryan Thurston | Duncan McLennan
Economies of Scale.
Economies of Scale.
Planning and Organising Two Introduction to Construction Methodology
Title of the Change Project
How does storage work in your company
{Graduation Project} An-Najah National University
Scenario on airport works
Innovation - Unlocking Potential
Heat gain and heat loss in buildings
Economies of Scale.
NORTH TRUNK SEWER REPLACEMENT PROJECT
NORTH TRUNK SEWER REPLACEMENT PROJECT
Architectural Drafting
What is Facility Layout?  The layout facility is the physical location of the various departments/units of the facility within the premises of the facility.
SEAPA Board of Directors Meeting Wrangell, Alaska
Gasunie is one of the biggest gas infrastructure companies in Europe
Building Construction I Sofia Sebastian 1
Presenter Tony Bosnich 2015
Strip Foundations The foundation runs under all the loadbearing walls.
Presenter Tony Bosnich Oct 2015
Work Order System Infor 10 (EAM) JCIM
Space Manager Search and Filter View
Planning and Organising Two Development of the P&O process
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Economies of Scale.
Planning and Organising Two Introduction to Construction Methodology
Presenter Tony Bosnich 2014
Economies of Scale Asst. Prof. Dr. Serdar AYAN
Review Group 177 Rolling AQ.
The Paterson Redevelopment
Stoke Medical Centre RIBA Plan.
How Excavation Companies Help You In Construction Projects In Ooltewah, TN.
Presentation transcript:

Planning and Organising Two Plant and Equipment Excavation calculation ConstructioConstrucc 2 : 2012 Construction Practice 2 : 2012 Presenter Tony Bosnich/Glenn Edmonds Oct 2014 © Unitec New Zealand >>DEPARTMENT OF CONSTRUCTION

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT 1.Analysis excavation plant requirements for large commercial sites 2.Consider options and confirm selection. 3.Carry out Excavation Quantity calculations to confirm validity of selection and highlight any problem areas. Confirm haulage requirements and number of machines >>DEPARTMENT OF CONSTRUCTION Learning outcomes

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT 1.Analysis Excavation plant requirements Analysis site constraints Constraints and the way we deal with them are the single biggest factor affecting the overall success of the project Run through check list which is similar to the crane exercise 3 DEPARTMENT OF CONSTRUCTION

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT List constraints of excavation >>DEPARTMENT TITLE EDIT IN HEADER & FOOTER

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT Large quantities of dirt to remove from siteRestrictions of time in programme but also project specific daily requirementsConsider bulk verses detailed excavationAdjoining properties, access one way, flow throughServices - danger of contact with existing.CommunicationsMovement on site of material, gates, wash down provision, traffic control, rampsPublic protection, across and through public areas requires special care Excavation Specific Constraints 5 DEPARTMENT OF CONSTRUCTION

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT Our assignment Consider plan provided sheet a 1. Identify constraints from list on previous slide. 2. What type of excavator would be suitable? 3. How do we get it into place 4. How do we remove it when complete 5. Do we need to attack from more than one work face at a time. 6. Consider operation, dig only stock pile on site, dig and remove off site, bring back suitable fill. 7. Haulage requirements. 8. Other machinery required? Formulate Excavation Proposal 6 DEPARTMENT OF CONSTRUCTION

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT Example >>DEPARTMENT OF CONSTRUCTION

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT Types of machinery >>DEPARTMENT OF CONSTRUCTION

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT Fill in spread sheet in excel as provided in hand out 1.Work out total quantity 1 st Allow for 1.5m from grid line to face of piled retaining wall for working space outside building. Excavation is 7.2 meters from ground floor slab 2.Adjust for bulking of excavated materials 17.5 % 3.Adjust for operator 95% efficiency and machine 90% efficiency. Given machinery bucket size is 1.5 m3 Data sheet production rate is 100m3 per hour 4. What is the total machine hours required for this total excavation. Excavation plant selection Calculations 9 DEPARTMENT OF CONSTRUCTION

>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT Movement of traffic and haulage maybe greater problem than production capacity of diggers. Consider both aspects how much material will excavator produces per hour. Round trip - the meaning of??? Consider also >>DEPARTMENT OF CONSTRUCTION