22 October 2015 1 Summary: Updating of the activities carried out on-site (Done) in SEPTEMBER List activities on going (Next steps) and scheduled for OCTOBER.

Slides:



Advertisements
Similar presentations
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
Advertisements

CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
Project Planning. Learning Objectives: By the end of this topic you should be able to:
Alachua County BoCC Meeting November 8, Project Background and Location Study Purpose Study Activities Bridge Alternatives Evaluation Schedule.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
John Osborne GS/SE March 2013
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
Construction and Installation of the CLIC Experimental Area
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
National Energy Technology Laboratory U. S. Department of Energy Project Kickoff Presentation December 16, 2003 Ken H. Green Principal Investigator Development.
Takeyasu Ito University of Tennessee EDM Collaboration meeting December, 2004 Cost and Schedule Estimate WBS 2.5- Neutron beam polarizer/splitter for SNS.
Summary of the Executive Session TF#22. Status of Task 6 Papers and Reports All MG have delivered drafts. Waiting for the overall paper from the reviewer,
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
19 February Summary: Updating on the activities completed (Done) since the last meeting List activities on going (Next steps) and related Actions.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
TS, Length of YETS EYETS LIU & CONS Project
Project Management “Project Planning & Scheduling”
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
09 July EHN1 civil engineering project status (JUNE) Summary: Updating of the activities carried out on-site (Done) in JUNE List activities on going.
06 August EHN1 civil engineering project status (JULY) Summary: Updating of the activities carried out on-site (Done) in JULY List activities on.
CENF meeting 3-Oct What is going on? WA104 and WA105 still waiting for an official CERN communication, to be treated as any other approved experiment.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
East Area, M2, K12 Lau Gatignon / EN-MEF, EATM
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
R2E Mitigation Project P5 Relocation Options - Discussion R2E Mitigation Project CMS Relocation Options Towards An R2E Baseline 1 M. Brugger for the R2E.
Vancouver1 ProjectIEEE Working Group on Mobile Broadband Wireless Access TitleSchedule Considerations Date.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
15 January Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Work Organisation for Splice Consolidation Francesco Bertinelli 20 minutes presentation, 10 minutes discussion: 12 slides First LHC Splice Review, CERN,
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
EGEE is a project funded by the European Union under contract INFSO-RI NA5 M. Heikkurinen NA5 Activity Manager All Activity Meeting, 13 th September.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES - 3D VISUALS FOR SURFACE STRUCTURES.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
19 February Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
Town of East Greenbush Waste Water Treatment Plant Project Monthly Update – September 2014.
Health Quality Ontario The provincial advisor on the quality of health care in Ontario Health Links Q2 Report 09-Dec-2015 Prepared by:
WP 17.1 Civil Engineering Platform height / vs option Status on M. Manfredi on behalf of WP17.1 team.
Time to resolve Design Issues 1. Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3.
Infrastructure EHN1 extension Lau Gatignon, 7 March 2016.
21 January Summary: Updating of the activities carried out on-site (Done) in DEC + ½JAN List activities on going (Next steps) and scheduled till.
10 December Summary: Updating of the activities carried out on-site (Done) in NOVEMBER List activities on going (Next steps) and scheduled for DECEMBER.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
WP 17.1 Civil Engineering Point 1 - Networks LS2 COMMITTEE – CERN – Pieter Mattelaer (SMB-DI)
25 June EHN1 civil engineering project status (MAY) Summary: Updating of the activities carried out on-site (Done) in MAY List activities on going.
Expo Line Transit Project Exposition Light Rail Transit Project Expo Board Presentation Monthly Project Status Update October 2, 2008.
OTE Building PMG Report September 10, 2012 Rhonda Merchut 1.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Detailed planning for fish farm construction Once the site has been selected, then initiation of planning begins. There are two main related components.
SMR 21/09/2017 P. Fessia.
Francois and Lau EATM 17 July 2012
CE Status: Activities executed until 03/08 and ongoing
EHN1: CE Integration process updating
East Hall under construction
How to perform Time Impact Analysis / Window Analysis in Primavera P6
Minuteman Vocational Technical Regional High School Progress
NSS integrated installation plan workshop Introduction
FASER LS2 work coordination meeting
Presentation transcript:

22 October Summary: Updating of the activities carried out on-site (Done) in SEPTEMBER List activities on going (Next steps) and scheduled for OCTOBER Final consideration EHN1 civil engineering project status (SEPTEMBER) Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi

(1) DIAPHRAGM WALLS -73 panels- Execution EAST side: (100% completed) Execution SOUTH/WEST side: (100% completed) Done (1/4): Guide walls allowing DW excavation: (100% completed) Execution NORTH/WEST side: (100% completed) 100% TOTAL PANELS EAST N/W S/W Problem for execution of panels close to EHN1 has generated ~4 weeks of delay to complete the task and.. Construction defects discovered in other panels already casted came out during excavation to set up the crown beam lead to.. About 4 weeks of delay on the overall planning as connected activities have been blocked EHN1 civil engineering project status (SEPTEMBER) FTM MOECERN FTM under approval by MOE and CERN Defects repaired during AUG/SEP Impact on the current long term schedule under evaluation Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi 22 October

Done (2/4): (2) TECHNICAL GALLERY -70 meters- Earthworks: (100% completed). Execution TG: (90% completed). After T1 completion and EHN1 connection Backfilling: (25% completed). T1 and T3 portions are missing EHN1 civil engineering project status (SEPTEMBER) Side retaining wall and backfilling foreseen later as not in the critical path. Priority given to other activities Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi 22 October

Done (3/4): (3) PITS EXECUTION Crown beam execution: (100% completed). After defects’ reparation. Excavation first ties level: (50% completed). Only Pit B done. Excavation head DW level: (100% completed). Excavation second ties level: (0% completed). Only for certain DW panels Internal DW surface planing: (0% completed). First ties level execution: (50% completed). Not yet in tension -step by step- EHN1 civil engineering project status (SEPTEMBER) Second ties level execution: (0% completed). (...). Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi 22 October

Done (4/4): (4) SLAB SYSTEM -Planche 1 of 6- EHN1 civil engineering project status (SEPTEMBER) Earthworks allowing site preparation: (75% completed) Concreting process: (20% completed). Fixation towards EHN1 structure: (0% completed). Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi 22 October

Next Steps: Activities scheduled for October (2) TG: No activities scheduled. (3) PITS:  (B) Tensioning first ties level within mid-October. Excavation/Execution second ties order by end-October.  (A) Excavation/Execution ties within mid-October. Tensioning ties by end-October.  (A+B) Internal DW surface fixation in parallel. Pits excavation to start in November. (4) SLAB SYSTEM: P1 completion 1 st half October, P2 to start afterwards. EHN1 civil engineering project status (SEPTEMBER) Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi 22 October /09/201521/10/2015

Final Consideration: The completion of the DW complex and reparation of defects led to ~4 weeks of delay on the general planning. CE Contractor is re-organizing the worksite activities in order to minimize time lost (i.e. work during the weekend, add different workshop and internal resources, overlap several activities with metallic contractor). Planning has been reviewed given the priority to the execution of the pits (critical path). CE Handover unchanged for the moment (Jul-2016), but possibility to grant extra time, by delaying key-dates, is under discussion. Coordination of the CE integration issues (3D Catia model updating, ECR draft, other requirements) will be finalized. Next status of the works end-October. EHN1 civil engineering project status (SEPTEMBER) Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi 22 October