New Jersey Institute of Technology Concrete Industry Management Program Prof. David Washington, Ph.D., P.E. Instructor Concrete Industry Management Program.

Slides:



Advertisements
Similar presentations
Overview of the EPRI Groundwater Assessment Program
Advertisements

Tour of Five Small Flood Control Dams in Iowa and Nebraska Rehabilitation Needs of Aging Small Flood Control Dams.
TVI Resource Development (Phils), Inc. September Canatuan Tailings Management Completion of Stage 1 Tailings Management Facilties Gossan Dam and.
Sandbagging Techniques
BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® Portland & Walla Walla Districts Columbia-Snake River System Extended Navigation Lock Outage.
What Do You Know About Michigan’s Hidden Resource? All photos by Joan Schumaker Chadde, Western Upper Peninsula Center for Science, Mathematics and Environmental.
1 PRESENTATION FLOWABLE FILL Presented By: Mac McArthur, P.E. Construction Engineering Services Bureau Mike Lynch Materials Bureau Highways and Engineering.
DUBLIN PORT TUNNEL CONSTRUCTION CHRIS PAGE & THOMAS SMITH 19/03/2009 H24GGY GEOLOGY FOR CIVIL ENGINEERS Dublin Port Tunnel Project.
Earth and Rockfill Dams
Kentucky River Lock and Dam No. 8 A Major Qualifying Project for Stantec Consulting Services Inc. Michael Kendall Karyn Sutter.
East Branch Dam Safety Modification Project
Levee Seepage: Concerns, Evaluations, and Solutions Pete Nix, P. E
Department for Building Structures and Materials: Design, Analysis and Testing 2nd meeting of the European Forum for Disaster Risk Reduction (EFDRR), 10.
May 14, 2014 RAMSHORN POND DAM REHABILITATION PUBLIC INFORMATION SESSION PARE CORPORATION, FOXBORO, MA Allen R. Orsi, P.E., Managing Engineer.
The North Carolina Dam Safety Program. Our Responsibilities Administration and enforcement of the Dam Safety Law of 1967 and the supplementary Administrative.
Reconstruction of the Eads Bridge Highway Deck
SESSION: RESILIENT INFRASTRUCTURE Stronger and More Resilient Infrastructure to Accommodate the Effects of Sea Level Rise Michael V. Tumulty, P.E., Vice.
Controlled Low Strength Material (CLSM) aka ‘Flowable Fill’ Presented by: Daniel Garza.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering WFP Slideshow Photos from Water For People Projects Courtesy of Jody Camp Photos from.
ENVIRONMENTAL C ONST R U C TION INDUSTRY & ISSUES: Alternatives Universiti Teknologi Malaysia Construction Research Centre (UTM CRC) UTM Razak School of.
What Do You Know About Michigan’s Hidden Resource?
SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING FOUNDATION ENGINEERING BY KARTHIVELU.
Education & Salary Education: No specific education needed except a High School diploma or G.E.D. Salary:$30,000 to $70,000 a year.
Route CC bridge replacement over Caulk’s Creek. What is the problem? Large debris consistently collects on the upstream end of the bridge. This causes.
ASFPM – May 24, 2012 CASE STUDY – 408 PERMITTING AND LEVEE ACCREDITATION FOR WATERLOO, NEBRASKA ASFPM MAY 24, 2012 Presented by Randy Behm, PE, CFM Lalit.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Broadway Street Viaduct Improvement, Pre-Load Testing and Geotech Report Workshop Consultant Presentation Iowa DOT 2 nd April 2007.
{ Construction Management B.S. August Presented by: Prof Albert Bleakley, Ph.D., P.E.
TVI Resource Development (Phils), Inc. September Gossan Dam Embankment Construction Late July 2005 Placement of Core Zone Material. Placement of.
Controlled Low Strength Material (CLSM) ‘Flowable Fill’
The Office Building Washington, D.C. Penn State Architectural Engineering Senior Capstone Project Brett Miller | Construction Option Advisor: Dr. Ed Gannon.
Student Objectives: * You should know what the instructor expects from you to final grade You should be able to assess your level of knowledge for this.
ENCE 667 Project Performance Measurement Patuxent Water Treatment Plant Upgrade schedule analysis Presented by: Luis Rubio Isobo Tariah.
Committed to providing safe, high quality water and related business services earning customer trust and confidence. Louisville Water Company Capital Program.
Of An Evaluation of Performance Measures for Prefabricated Submerged Concrete Breakwaters: Section 227 Cape May Point, New Jersey Demonstration Project.
Power Plant Construction and QA/QC Section General Features of Hydro Electric Project Engineering Technology Division.
Welcome to Webinar on Accelerated Bridge Construction Featured Presentation: A Technical Overview of FHWA’s Upcoming ABC Manual Sponsored by Center for.
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Mining Management Act Security
1. 2 Civil Engineering Practice Introduction Instructor: Dr. Attaullah Shah Lecture # 1 Department of Civil Engineering Swedish College of Engineering.
Soil and Earth Works Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lecture 3 - Week 2 2 nd Semester 2008/2009 UP Copyrights.
New Jersey Institute of Technology Concrete Industry Management Program Prof. David Washington, Ph.D., P.E. Instructor Concrete Industry Management Program.
200+ Years of Global Dam Development Each point on the globe represents one of 6,000+ dams built from Dams impact the hydrological cycle and.
Student Objectives: Who are the key players in the Concrete Industry? Describe the interactions among industry players INTRODUCTION TO THE CONCRETE INDUSTRY.
DAMS Dept. Of Civil Engineering
Project Update August 2008 Richard Rife Deputy Project Manager.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7C.
Power Plant Construction and QA/QC Section 9.5 – Power Plant Noise and its Control Engineering Technology Division.
Dam Safety Program March 2011 Dam Safety Program March 2011.
ROLL NO.ENROLLMENT NO.NAME MAKVANA DISHA R. GUIDED BY : PROF. R. JADAV.
DIAPHRAGM WALLS.
01/2012 The Shikwamkwa Replacement Dam Five Years Later C. Richard Donnelly, Hatch ● Bryan Tatone, University of Toronto ● Warren Hoyle, Noel Boucher,
Are They Really Teachers? Virginia Baldwin Dr. Michael Anderson University of Nebraska - Lincoln.
1 HPMS Training Course Introduction to Highway Performance Monitoring System (HPMS) FHWA Highway Information Seminar National Highway Institute (NHI) Arlington,
Energy Huntsville Opportunity Report and Government Collaboration June 2016.
* What is the CIM program and who are the Patrons?
Copyright February 10, Introduction to Geotechnical Engineering Prof. Basuony El-Garhy Geotechnical Engineering and Foundations Civil Engineering.
Dry mix Concrete Solutions in Dubai
What Do You Know About Michigan’s Hidden Resource?
Detailed planning for fish farm construction Once the site has been selected, then initiation of planning begins. There are two main related components.
“Marketing Industry Innovation”
NORTH TRUNK SEWER REPLACEMENT PROJECT
Georgetown Public Schools Creativity, Inspiration, and Innovation
Marcellus Well Pad Constructability
Construction Engineering Change Order - 2 Prof. Ralph V. Locurcio, PE
Construction Engineering Change Order - 2 Prof. Ralph V. Locurcio, PE
Reedy River Basin Sewer Tunnel Project Update
Estler Lake Dam Rehabilitation
Earth and Rock fill Dams
Sacramento Environmental Commission January 2019.
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Fuel Cell Market size worth $25.5bn by 2024 Low Power Wide Area Network.
Presentation transcript:

New Jersey Institute of Technology Concrete Industry Management Program Prof. David Washington, Ph.D., P.E. Instructor Concrete Industry Management Program Department of Engineering Technology

Overview of Presentation Academic Year –Course Activities –Socials –Research

Sahara Sand of Eagleswood Tour (Silvi Group, Inc) Concrete Application I –CIM 210)

Sahara Sand of Eagleswood Tour (Silvi Group, Inc) Concrete Application I –CIM 210)

Cement Storage Tanks (Silvi Group, Inc) Concrete Application I –CIM 210)

Readymix Plant (Silvi Group, Inc) Concrete Application I –CIM 210)

Working Safely The Placement of Fast Track Concrete Sika Class Visit – Dr. Ketan Sompura (Advanced Concrete Testing – CIM 405)

Working Safely The Placement of Fast Track Concrete Forsgate Industrial Park (Concrete Application II) Ken Justice, PE. (NESCA) CIM 305

Working Safely The Placement of Fast Track Concrete Students observing placement of pervious concrete Ken Justice, PE. (NESCA)

Working Safely The Placement of Fast Track Concrete Students make their own sample of pervious concrete Ken Justice, PE. (NESCA)

Working Safely The Placement of Fast Track Concrete Rolling Pervious Concrete (Concrete Application II) Ken Justice, PE. (NESCA)

Overview of Presentation Academic Year –Course Activities –Socials –Research

Working Safely The Placement of Fast Track Concrete Socials with Sika Corp. ( Michael Campion, Vice President and director of the concrete construction product)

Working Safely The Placement of Fast Track Concrete Socials with Silvi Group, Inc. ( Bill Ryan from the Human Resource Department)

Working Safely The Placement of Fast Track Concrete Socials with Poster Presentation ( Bill Ryan listens to students as they make their Poster Presentation)

Overview of Presentation Academic Year –Course Activities –Socials –Research

The Placement of Fast Track Concrete Research with Student (Concrete Application II and Concrete Properties and Testing ) Allyn Luke’s Research Project Testing of Emergency Admixtures Forta and CIM Learning Together Gyasi Bryan-Smith Michael Ciallella Eric Miller Allyn Luke Bob Grace Marty Doody

Working Safely The Placement of Fast Track Concrete Mobile Barrier Trailer (NJDOT Research) Protecting Concrete Contractors on the Highway

NJDOT Research Project (Mobile Barriers – Protects Workers) Damaged Concrete

Unprotected Worker “One eye on the road”

Working Safely

The Placement of Fast Track Concrete

Working Safely The Placement of Fast Track Concrete The Rehabilitation Of Vermont’s Waterbury Dam’s Seepage Control Components By Innovative Schemes U.S. Army Corp. Of Engineers

Working Safely The Placement of Fast Track Concrete Supertop Drilling INNOVATIVE SCHEMES OF REHABILITATION

Working Safely The Placement of Fast Track Concrete EVALUATION AND ALTERNATIVES OF DAM PERFORMANCE E-1Cutoff Wall – Cement-Bentonite cutoff wall from crest of dam to foundation bedrock along entire length of dam. $24.9 million E-2Gorge Section Replacement - Remove gorge section (25% of dam volume), stockpile upstream, treat foundation, rebuild section $50.8 million E-3Filter Shaft – Soldier-beam & Lagging shaft excavation with filters and concrete monitoring chamber $23.2 million

Working Safely The Placement of Fast Track Concrete QUESTIONS ???