Feedback Pillar-1: Technology. Feedback from parallel session Pillar-1: Technology POF-II remaining time all pillars expect to reach milestones and produce.

Slides:



Advertisements
Similar presentations
LCFI Collaboration Status Report LCWS 2004 Paris Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, RAL.
Advertisements

Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
Simulation executable (simv)
Portable and Predictable Performance on Heterogeneous Embedded Manycores (ARTEMIS ) ARTEMIS Project Review October 2014 WP1 “Management and IPR”
AFFECTS Advanced Forecast For Ensuring Communications Through Space WP Lead: Dr. Aleksei Parnowski Space Research Institute, Kyiv, Ukraine WP Co-Lead:
1 Meeting: 20 th January, Rome P. Zakynthinos WP#2: Applications of Silicon-Organic Hybrid (SOH) and Device Specification.
04/02/02EECS 3121 Lecture 23: DRAM + Driving large capacitances EECS 312 Reading: , 8.2.3, 8.5 (text)
A.Kashchuk Muon meeting, CERN Presented by A.Kashchuk.
WP6 interconnect technology part
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Live Group Activity GoVenture Point of Sale Simulation We will collectively operate a business cash register and inventory system.
Network of Excellence in Internet Science Network of Excellence in Internet Science (EINS) 2 nd REVIEW Brussels, 4-5 February 2014 FP7-ICT
Work Package 6: Performance Specification Ian McCrea.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
London February, 28 European Commission Information Society and Media Annual Meeting Annual Meeting GaLA Game and Learning Alliance The European Network.
Workshops Tech Com: Progress Reports Terminology from the first class period Goal: What it is you are trying to accomplish; the bottom line. Milestone:
How to write a good proposal? Bucharest, 3-4 March 2010 Koos de Korte.
Jeroen van Hunen The LHCb Tracking System. May 22, 2006 Frontier Detectors for Frontier Physics, Elba, Jeroen van Huenen 2 The LHCb Experiment LHCb.
FMTV COOLING SYSTEMS 4/23/2017.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Automated Industrial Wind Tunnel Controller By Daniel Monahan and Nick DeTrempe Advised by Dr. Aleksander Malinowski.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,
WP5 Cognitive control of wearable haptic systems Domenico Prattichizzo UNISI and IIT (units contributing to the talk)
This project has received funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under.
Dream Team Corporation Library Management System National Innovation Foundation library Configuration and Testing Alexander Kanavin
3 rd Work Meeting of CBS-MPD STS, Karelia, 2009 Towards CBM STS Volker Kleipa, GSI Darmstadt.
1 An introduction to radiation hard Monolithic Active Pixel Sensors Or: A tool to measure Secondary Vertices Dennis Doering*, Goethe University Frankfurt.
Revision WP2 description ViSiCAST consortium meeting 5 & 6 July.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
My Python Programmes NAME:.
Jorgen Christiansen, CERN PH-ESE 1.  Spokes persons and Institute chair elected ◦ SP’s: ATLAS: Maurice Garcia-Sciveres, LBNL CMS: Jorgen Christiansen,
Letting contracts for successful delivery by the voluntary and community sector Voluntary Sector Excellence Project, Estonia Richard Gutch, Chief Executive,
Report on WP13 Sub Task and “Tools to facilitate detector development” 1.Interfacing FE-chips specific to gas detectors to the Scalable Read-out.
Electric Circuit –Current provided by battery flows through wire, into the light bulb, through another wire, and back to the battery. Current: flow of.
1 FPCCD VTX Work Plan Y. Sugimoto 2010/1/22. 2 FPCCD: Features and R&D issues (1/2) Small pixel size (~5  m) –Sensor development Small size chip; ~6mm.
On a eRHIC silicon detector: studies/ideas BNL EIC Task Force Meeting May 16 th 2013 Benedetto Di Ruzza.
Innovative Approaches to Teaching Groups Making Theories Practical Presented by: Paul Cousins Teachers’ Workshop.
NTC 2014 : NLP/ML Track Danish Contractor. Suggestions This presentation provides links to data sets as well as tools and resources for working on Natural.
GFOI Component Coordination and Country Engagement SDCG-8, Session 10 Stephen Ward (Australia) 24 Sep 2015, Bonn.
© Services GmbH Project work plan 2/20/ St. Petersburg, May 18, 2011 Dr. Andrey Girenko
Time Remaining 20:00.
AIDA WP8.4 Qualification of components and common database Simon Canfer Rutherford Appleton Lab, STFC AIDA Annual meeting, DESY,
LCTPC “Advanced Endplate” (Discussion) LC TPC Meeting at ALCGP07 T. Matsuda.
Status report Pillar-1: Technology. The “Helmholtz-Cube” Vertically Integrated Detector Technology Replace standard sensor with: 3D and edgeless sensors,
Technical English Unit 45: Circuits and components Dr. Basil Hamed Technical English Islamic University of Gaza April, 2016.
Ideas on MAPS design for ATLAS ITk. HV-MAPS challenges Fast signal Good signal over noise ratio (S/N). Radiation tolerance (various fluences) Resolution.
@RCAShowcase Category Title Racecourse. 2 Objectives Provide clear objectives as to what you hope to achieve: Demonstrate why the initiative is necessary.
Kick-off January Eric Kluijfhout Summary When: January 9-13 Where: Heerlen, OUNL Who: All WPs Organisers: WP1 + WP2.
Text optional: Institutsname Prof. Dr. Hans Mustermann Mitglied der Leibniz-Gemeinschaft `Cross disciplinary applications` Annual Meeting and.
14.4. Readout systems for innovative calorimeters
Fastest Data Processing in Image Reconstruction for Compton Camera Imaging
Control Schemes - Agenda
Progress with System Integration of the CBM Silicon Tracking Detector
New Materials for Extreme Thermal Management – PowerMat: Task 17.2
Unit 45: Circuits and components Dr
Unit 45: Circuits and components Dr
Hybrid Pixel R&D and Interconnect Technologies
Overview of the project
WP microelectronics and interconnections
Materials for extreme thermal management (PowerMat)
Granular calorimeters Infrastructure
JRA1 Innovative gas detectors
Reduced Costs Service & Support Innovative Technology Performance Quality.
Reduced Costs Service & Support Innovative Technology Performance Quality.
Autonomous temperature sensor for bake plate calibration
Unit 45: Circuits and components Dr
BETONLINEBETONLINE A·+A·+
DTS Status Report Marc Weber.
Complete Vehicle Systems.
Presentation transcript:

Feedback Pillar-1: Technology

Feedback from parallel session Pillar-1: Technology POF-II remaining time all pillars expect to reach milestones and produce deliverables: > WP-1: ASICs:  running repository  Submission of first test chip > WP-2: Sensors:  Edgeless/edge-sensitive silicon  Slim-edge high-Z  Test setup for radiation damage

Feedback from parallel session Pillar-1: Technology POF-II remaining time all pillars expect to reach milestones and produce deliverables: > WP-3: Packaging  Demonstrate high-precision flip-chip  Stud-bumps  Ball-jet  Fine line printing on ceramics  First TSV on dummies > WP-4: innovative materials  Finish sandwich laminated graphite  First micro-channel cooling

Structure of pillar The general structure of the pillar was considered as appropriate and should be kept. But: > Need for more interaction with Pillar-2 (example WP6: front-end fast signal transmission) > Need input from Pillar-3 (for instance advanced signal processing) > Added “front-end cooling” to task list WP4 (innovative materials) > Pillar-3; WP10: diamond sensors: shouldn’t this be in Pillar-1?

Self-evaluation FTEScien. D.Comp.StandingUseStrateg. WP-1AAAAAA WP-2CB/AAAAA WP-3AA/BABAA WP-4C/BA/BB/C AA WP-2 (Sensors) is understaffed  action needed. Q: what can we do? WP-4 (Innov. Mat) is subcritical  action needed. Q: what can we do? Clear ideas and plans exist for all WP’s for POF-3 period. Helmholtz cube remains an excellent vehicle for developments A second vehicle could be good for other developments (WP-3; WP-4)