Sprint 170 Review / Sprint 171 Planning Nov 2 nd – Nov 16 th 2015 – s170.

Slides:



Advertisements
Similar presentations
Upgrading the Oracle Applications: Going Beyond the Technical Upgrade Atlanta OAUG March 19, 1999 Robert Cooney.
Advertisements

Efforts to Strengthen Healthcare Communities Dr. Lauren Thompson, Director December 13, 2012 The Federal Health Architecture.
Electronic Submission of Medical Documentation (esMD) for Medicare FFS Presentation to HITSC Provenance Workgroup January 16, 2015.
CONNECT 4.0 July 26, Webinar Technical Details 2 Type questions in advance; click sendQuestions + answers appear in chat window During discussion.
Copyright © 2009 Rolta International, Inc., All Rights Reserved a c c e l R12™ Upgrade Approach.
CONNECT 4.0 Enhancing Health Information Exchange for Interoperability Success February 12, 2013.
Glenn Research Center at Lewis Field Software Assurance of Web-based Applications SAWbA Tim Kurtz SAIC/GRC Software Assurance Symposium 2004.
© 2009 GroundWork Open Source, Inc. PROPRIETARY INFORMATION: Information contained herein is not for use or disclosure outside of GroundWork Open Source,
CONNECT Deep Dive July 16 th Goals and Focus Areas Goals –Provide a detailed view of CONNECT and its benefits –Explain how CONNECT capabilities.
Jason Morrill NCOAUG Training Day February, 2008
Exchange Network Node Help Desk NOLA Conference Feb 9-10, 2004.
CONNECT 4.0 Technical Deep Dive February 19, 2013.
Sprint 114 Review / Sprint 115 Planning August 26th, 2013.
©2013 Lavastorm Analytics. All rights reserved.1 Lavastorm Analytics Engine 5.0 New Feature Overview.
Sprint 99 Review / Sprint 100 Planning January 28, 2013.
Cross Vendor Exchange Testing and Certification Plans April 18, 2013 Meaningful Use Stage 2 Exchange Summit Avinash Shanbhag, ONC.
What’s new in Stack 3.2 Michael Youngstrom. Disclaimer This IS a presentation – So sit back and relax Please ask questions.
CONNECT Roadmap Updated version after June 27 th, 2013 Requirements and Prioritization Meeting 1.
CONNECT: Install Webinar for Code-A-Thon April 20th, 2010.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
CONNECT: Install Webinar for Code-A-Thon September 7 th, 2010.
Sprint 104 Review / Sprint 105 Planning April 8, 2013.
Instant Messaging for the Workplace A pure collaborative communication tool that does not distract users from their normal activities.
© Copyright 2011, Alembic Foundation. All Rights Reserved. Aurion: Health Information Exchange Technology Today Alembic Foundation OSCON 2011 July 27,
Sprint 112 Review / Sprint 113 Planning July 29 th, 2013.
Access Training Linux/Unix Power Broker Access Custom Schema Database Access Customer Training Date: 25-JAN-2005.
CONNECT Roadmap Draft version as of February 4 th,
Sprint 103 Review / Sprint 104 Planning March 25, 2013.
CONNECT: Install Webinar for Code-A-Thon April 22nd, 2010.
Sprint 115 Review / Sprint 116 Planning September 9th, 2013.
Sprint 158 Review / Sprint 159 Planning May 18 th – June 1 st 2015.
MONDAY, 4:00 – 4:20PM and TUESDAY, 5:00 – 5:30PM Brian Behlendorf CONNECT Collaboration Advisor (Contractor) Federal Health Architecture, Office of the.
Developers Integration Lab (DIL) Nationwide Health Information Network Interoperability Presented By Mario Hyland, AEGIS.net, Inc. Federal Health Architect.
Title – NwHIN CAQH/CORE X12 support Discussion Date June
Getting Started with REACH Delivery. Free to Receive messages and files Easy and completely free to install Comprehensive online help Free Support Forum.
Sprint 101 Review / Sprint 102 Planning February 25, 2013.
Sprint 110 Review / Sprint 111 Planning July 1 st, 2013.
Sprint 102 Review / Sprint 103 Planning March 11, 2013.
Sprint 106 Review / Sprint 107 Planning May 06, 2013.
Sprint 108 Review / Sprint 109 Planning June 3 rd, 2013.
MDPHnet & ESP Data Partner Participation Overview The following slides describe the necessary steps for a data partner to participate in the MDPHnet Network.
Ensuring Conformance & Interoperability NHIN Testing Leslie Power, NHIN Testing Lead (Contractor) Office of the National Coordinator for Health IT WEDNESDAY,
Mariann Yeager, NHIN Policy and Governance Lead (Contractor) Office of the National Coordinator for Health IT David Riley, CONNECT Lead (Contractor) Federal.
Sprint 169 Review / Sprint 170 Planning Oct 19 th – Nov 2 nd 2015 – s169.
Sprint 116 Review / Sprint 117 Planning September 23th, 2013.
APNIC update AfriNIC-7 26 September 2007 Paul Wilson.
Sprint 105 Review / Sprint 106 Planning April 22, 2013.
Sprint 107 Review / Sprint 108 Planning May 20, 2013.
TUESDAY, 3:30 – 3:50PM David Riley, CONNECT Lead (Contractor) Federal Health Architecture Office of the National Coordinator for Health IT CONNECT 3.0.
Creating an Interoperable Learning Health System for a Healthy Nation Jon White, M.D. Acting Deputy National Coordinator Office of the National Coordinator.
HIE Certified Network Pilot Testing w CONNECT May 02, 2013.
CONNECT CCB Meeting May 16, Balancing current + future needs CONNECT needs to support the current 2012 production and operational needs of the Federal.
Sprint 174 Review / Sprint 175 Planning Dec 28 th – Jan 11 th 2016 – s174.
NJIT 1 Apache Tomcat (Version 6.0) THETOPPERSWAY.COM.
ESSRT Status Report as of July 31, 2013
Sprint 113 Review / Sprint 114 Planning August 12th, 2013.
Sprint 175 Review / Sprint 176 Planning Jan 11 th – Jan 25 th 2016 – s175.
Sprint 173 Review / Sprint 174 Planning Dec 14 th – Dec 28 th 2015 – s173.
Title – NwHIN CAQH/CORE X12 support Discussion Date June
A leap ahead... Darren Kearney Don Miller Ilya Pinchuk.
Quarterly Geo/SIG Coordinator Webinar June 25, 2014.
CONNECT Architecture (Versions 2.3 and 2.4) Cross Community Patient Discovery (XCPD) and XDR Overview MONDAY, 2:00 – 2:00PM Greg Fairnak, CONNECT Chief.
Sprint 177 Review / Sprint 178 Planning Feb 8 th – Feb 22 nd 2016 – s177.
Release 4.7 Review Sep 8th Sprint Resource Pages For past sprint, visit: NHINProgress/Sprint+191+Progress+Summary.
Sprint 189 Review / Sprint 190 Planning Jul 25 th –Aug 8 th 2016 – s189.
Get the Most Out of GoAnywhere: Agents
CIIMS Proposal for TOP-003 Approach
Introduction of Week 3 Assignment Discussion
ONC P2 FHIR Ecosystem Task Force
AlwaysOn Availability Groups
Presentation transcript:

Sprint 170 Review / Sprint 171 Planning Nov 2 nd – Nov 16 th 2015 – s170

Sprint Resource Pages For past sprint, visit: NHINProgress/Sprint+170+Progress+Summary NHINProgress/Sprint+170+Progress+Summary For next sprint, visit: NHINProgress/Sprint+171+Progress+Summary NHINProgress/Sprint+171+Progress+Summary For complete information on the CONNECT 4.5 release visit: CONNECT4/CONNECT CONNECT4/CONNECT+4.5 2

Sprint 170 Summary 3 Points completed in sprint (velocity) = 16

Sprint Development Audit logging for specification compliance –Fixed audit response timeout issue Synchronized CXF client Audit proxy call. EJB transactions are application managed. Need to execute a performance test next sprint to understand potential performance impacts if any. –Updated audit logging configurability by service Turn on and off by service. New audit.properties file –Audit viewer design updated – design wikidesign wiki –Updated auditrepo.auditrepository database schema 4

Sprint Development Audit logging for spec compliance feature summary –Scope - PD, QD, RD, DS and X12 auditing at gateway –Auditing requirements, Audit viewer requirementsAuditing requirementsAudit viewer requirements –Audit design including ATNA message, Audit viewer designAudit design including ATNA messageAudit viewer design –Updated regression scripts - Pass-through, StandardPass-throughStandard Tasks for feature wrap-up –Audit logging configurability – log to database/log file –System Administration Module - Audit viewer –Complete testing on all application servers 5

Sprint Partner/Community Support SSA –Setting up CONNECT 4.5 in test WAS environment Access denied error, proxy issue (CONN-1625 Open) Held follow-up meeting with SSA to further troubleshoot issue DoD –Setting up CONNECT 4.5 in test JBoss environment Setting up internal connection information files - (CONN-1623 Closed) Review server logs to troubleshoot issues – Patient Discovery configuration, policy engine – (CONN-1624 Closed) VA –Follow-up WebLogic version, partner testing issues. 6

Sprint Partner/Community Support Forums CMS/esMD documentation questions Internal connection info/FIPS support Follow-up sent to esMD support team –Other forum discussion topics/questions MPI Plugin Client GUIs Installation 7

Sprint Partner/Community Support eHealth Exchange –Test team questions related to audit logging and checklists for PD, QD and RD – Testing team wikiTesting team wiki eHealth Exchange Product Certification –6 smoke tests + 35 security tests – Initial run passed –52 provisional (optional) – Not required for Product certification – WIKI/eHealth+Exchange+Product+Testing+Informationhttps://connectopensource.atlassian.net/wiki/display/CONNECT WIKI/eHealth+Exchange+Product+Testing+Information CONNECT Way Ahead survey –FHA survey in progress 8

CONNECT 4 - Partner and Community Support Current Partner Contacts ( Partners please validate) 9 AgencyAgency POCs DoD Lauren Thompson Monica Farah-Stapleton Crystal Baum John Keane (SCQC Team) Sean Miller (Dev Mgr, ManTech) Steven Phillips (Dev Mgr, ManTech) VA Elaine Hunolt Margaret Donohue Paul Cartland David Seitz Todd Turner Del Johnson Dick Rickard CMS Melanie Combs-Dyer Elaine Wigginton Walter Dill Walden D. Byers(CMS/OIS) Aaron Walters (CMS/OFM) Fatima Millar Michael Azar SSA Marty Prahl Kitt Winter Tom Davidson Dave Arvin

CONNECT 4 - Partner and Community Support Current Partner Supported Platforms in production 10 AgencyCONNECT VersionJVM Application Server Server Platform DoD WebSphere Red Hat Linux version bit VA WebLogic Red Hat Linux version bit CMS WebSphere 8.5Solaris Sparc 10 and x86 SSA WebSphere 8.5Sun Solaris Sparc 10

CONNECT 4 - Partner and Community Support Supported application servers WebLogic WebSphere 8.5 JBoss WildFly --- Open source application server Supported product versions

Sprint Proposed Themes Development / Community Support Sprint 171 themes –Auditing Complete audit viewer database update for all services Update auditlog xsd schema Execute performance test for one service to assess any performance impacts for concurrent thread invocation Update CONNECT to use SLF4J logging. –Partner/Community support Product certification – execution of test cases Partner support CONN-1625 (SSA) 12

CONNECT 4 Community Announcements CONNECT Awareness – Open sprint review and planning updates Look for Sprint Summaries ss/Progress+Summary+Page ss/Progress+Summary+Page Ask questions and participate in discussions on the CONNECT forums – CONNECT 4 Blogs and Forum posts – CONNECT CONNECT CONNECT

CONNECT 4 Custodial Agent and Community Support Ongoing Product Backlog work, CCB and CONNECT Roadmap Updates –Finalized as of March 31st Top focus to be on projects that facilitates implementation, exchange partner testing/onboarding and lower operational burden The Roadmap can be found on the CONNECT wiki: CONNECT 2015 RoadmapCONNECT 2015 Roadmap Product Backlog –JIRA Product BacklogJIRA Product Backlog 14

Questions or Discussions? 15

FHA Overview Established by the Office of Management and Budget as an E- Government Line of Business (LoB) Initiative Supports federal activities related to the development and adoption of health IT standards and policies Ensures that federal agencies seamlessly and securely exchange health data with other agencies, government entities, and with other public and private organizations 16

Stay Connected, Communicate and Collaborate Find out more about FHA on the ONC website: Schedule a meeting with me or send me your thoughts at: Subscribe, watch, Federal Health Architecture 17

Backup Slides 18

CONNECT 4 - WildFly Open source application server – WildFly –Product team to use WildFly as development app server – WIKI/Community+Application+Server+Migrationhttps://connectopensource.atlassian.net/wiki/display/CONNECT WIKI/Community+Application+Server+Migration –Oracle announced sun setting commercial support for future major releases of GlassFish Server –WildFly is an open source Application server ( JBoss Community version) One federal partner (DoD) already testing with JBoss for future upgrade FIPS configurable implementation Strong community and Red Hat support Clear support path from JBoss WildFly to EAP (Commercial version) Ease of installation, configuring, and upgrade 19

CONNECT 4 – WildFly Open source application server – WildFly –What this means? Development and new feature testing will be done on WebLogic, WebSphere, JBoss and WildFly only. Product team’s regression testing environment moving to WildFly Installation testing at release time will be done on GlassFish for one more release to provide time for the community to make any changes. Federal partners are encouraged to communicate with their trading partners about switching to WildFly to avail of new features in future and also to become aware of ‘Oracle/GlassFish sun-setting support’ announcements. 20

CONNECT 4 – Planned activities CONNECT – Planned activities until March 2016 –Release 4.6 Audit Trail and Node Authentication (ATNA) compliant audit logging across all Gateway services –Audit Log events for PD, QD, RD, DS and X12 services –Search/view audit events using System Administration Module Performance testing Release tasks - security and code quality testing, release testing, external compliance validation, documentation –eHealth Exchange/Product certification –Support Partner / community – installation, upgrades, questions Way Ahead Survey HIMSS support 21

CONNECT 4 – Latest Release 4.5 CONNECT 4.5 released on July 13 Release artifacts for CONNECT 4.5 –Interoperability Testing completed - passed Interoperability Testing results –Installation Testing completed - passed Installation Testing results –Regression Testing completed - passed Regression Testing results –Release notes are herehere –Installation instructions are herehere –Binaries are herehere –Source code is herehere 22