ENGR-25_HW-01_Solution.ppt 1 Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods Bruce Mayer, PE Licensed Electrical & Mechanical Engineer Engineering 25 Chp4 Tutorial: Prob 4.28 Solution
ENGR-25_HW-01_Solution.ppt 2 Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods The Situation Optimize Distribution Center Location for Customers:
ENGR-25_HW-01_Solution.ppt 3 Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods WhareHouse Location Optimization
ENGR-25_HW-01_Solution.ppt 4 Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods
ENGR-25_HW-01_Solution.ppt 5 Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods
ENGR-25_HW-01_Solution.ppt 6 Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods
ENGR-25_HW-01_Solution.ppt 7 Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods The Final Hand Notes
ENGR-25_HW-01_Solution.ppt 8 Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods GamePlan Illustrated Set x-value (m-index) Test 31 y-values (n-index) Increment x-value (m = m+1) Test 31 new y-values Repeat
ENGR-25_HW-01_Solution.ppt 9 Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods The MATLAB Program
ENGR-25_HW-01_Solution.ppt 10 Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods The Number Results The LOWEST-Cost Option in [$-cost, X-miles, Y-miles] The 1st "RunnerUp" Low-Cost Option in [$-cost, X-miles, Y-miles] The 2nd "RunnerUp" Low-Cost Option in [$-cost, X-miles, Y-miles]
ENGR-25_HW-01_Solution.ppt 11 Bruce Mayer, PE Engineering/Math/Physics 25: Computational Methods The Graph Results Note the Fairly Large Optimum 10mi-E & 16mi-N