1 PFDPU Mechanical Packaging PEER REVIEW MAVEN PFDPU Particle and Fields Data Processing Unit Mechanical Packaging and Design Overview May 09, 2011 Bill.

Slides:



Advertisements
Similar presentations
Fischer Manufacturing is an electrical fabrication company based in New Brighton, MN. We specialize in building to engineering specified requirements.
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Installation. Indoor Unit Installation Typical Installation.
Mech Systems Proposed EMI Modifications Marc Campell 9/2/03.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Knowledge to Shape Your Future Electric / Gas / Water Information collection, analysis and application MekElekItroniks Design Review Battery Charger Project.
Installation. Indoor Unit Installation Typical Installation.
B. Donakowski UCB/SSLFIELDS iCDR – MEP Mechanical 1 SPP FIELDS MEP Main Electronics Package Mechanical Packaging Bill Donakowski
MEP configuration pros/cons
Observatory - Overview July 13 & 14, 2010MMS I&T Pre-CDR Peer Review 1 Single Observatory Stowed.
SPP FIELDS V5 Antenna Mechanical Peer Review David Glaser, Paul Turin, Jeremy McCauley, John Bonnell, Dennis Seitz SSL UCB 7/17/13.
SPP FIELDS V5 Antenna Mechanical Peer Review Draft 2 David Glaser, Paul Turin, Jeremy McCauley, John Bonnell, Dennis Seitz SSL UCB 7/17/13.
LUMI 1 LUMI Mechanical Design Details Bill Ghiorso.
Installation. Indoor Unit Installation Typical Installation.
C osmic R Ay T elescope for the E ffects of R adiation Telescope Mechanical Design Albert Lin The Aerospace Corporation Mechanical Engineer (310)
Current ILC work at Fermilab Electrical Engineering Dept.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
1 PFP Peer iCDR /9-11 Particles and Fields Package (PFP) Peer Instrument Critical Design Review SWIA Mechanical Gregory Dalton Gregory Johnson UCB-SSL.
Design Progress Allen Ellis 18-September
1 Structure (STR) Subsystem Overview Jonah White – STR Co-Lead.
10c-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , c - Board Analysis Update Christopher Smith Mars.
Spalding Gymnastics Scoreboard Advisor: Zhao Zhang Team Members: Chris Chambers Christopher Reis Alex Dean Luke Breuer Ali Khan.
1 SPP FIELDS MEP Main Electronics Package Preliminary Design Review Bill Donakowski UCB/SSL 13/14 NOVEMBER 2013 MAVEN PFDPU Flight.
Sept. 2008EFW INST+SOC PDR IDPU Chassis Mechanical Design and Development Bill Donakowski Mechanical Engineer UCB/SSL
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
AA21301-DWG01Detail View of Isogrid AA21301-DWG02Top View of End Panel AA21301-DWG03Multiple Views of Side Panels AA21301-DWG04Front View of Side Panel.
Main Electronics Package
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator Assy1 GLAST Large Area Telescope: Mechanical.
AMS-02 tracker mechanics status of construction, assembly, integration Ladder assembly Ladder installation on planes Integration details, cooling loop,
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
AEP Mechanical and Power System H. Heetderks. CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 2 AEP Mechanical Design System.
THEMIS Instrument PDR 1 UCB, April 19-20, 2004 Spin Plane and Axial Boom Preamps & Sensor Cable Fabrication Critical Design Review Daniel Schickele University.
1 SPP FIELDS MEP Main Electronics Package Peer Review Bill Donakowski UCB/SSL 18 NOV 2014 MAVEN PFDPU Flight Unit SPP MEP Baseline.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
1 FPA Stage 2 Peer Review May 12, 2006 T. Brown. 2 FPA Stage 2 Status Summary of Stage 2 activities Review current design status Review schedule details.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Dizon Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
109-IDPU-Chassis-Donakowski 1 30 Sep – 01 Oct 2009DRAFT RBSP EFW ICDR 109-IDPU-Chassis-Donakowski IDPU Chassis Mechanical Design and Development Bill Donakowski.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 535 IDPU Chassis Bill Donakowski Mechanical Engineer UCB/SSL.
17-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , PFDPU D. Gordon / W. Donakowski PFDPU Team.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 1 GLAST Large Area Telescope:
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
20-1 MAVEN iPSR Oct 30-31, 2012 Particles and Fields Package Pre-Ship Review October 30-31, PFDPU D. Gordon, W. Donakowski & PFDPU Team Mars.
Cloudland Instruments Hawkeye Mechanical Design Snapshot Compiled April 8th, 2016.
SuitSat2 Mechanical Safety Notes Purpose Temporarily capture safety suggestions for the mechanical team of SuitSat2. Contents 1.Solar Panel Covers 2.Control.
C osmic R Ay T elescope for the E ffects of R adiation CDR v1 Telescope Mechanical Design Albert Lin The Aerospace Corporation Mechanical Engineer (310)
Status of EPS Battery configuration finalized Solar panel layout –finalized Solar panel Substrate is ready for bonding EM – fabricated and Completed the.
Applied Metallurgy EBB440 MECHANICAL ASSEMBLY Prepared by : AAS.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
FIELDS MEP Thermal Vacuum Cycling iPER
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Bill Donakowski Mechanical Engineer UCB/SSL
New field cage LP2 Ole Bach, Bernd Beyer, Volker Prahl
Hawkeye Mechanical Design Snapshot
GLAST Large Area Telescope:
PCB Connector Options Glenair® offers a variety of options when terminating Printed Circuit Boards, Flex Tape or Rigid Flex to Connectors using solder.
NPS mechanical design 11/13/2018 Jlab meeting
NPS mechanical design 01/31/2019 Jlab meeting
GLAST Large Area Telescope:
Bunker Wall Design Wall
Bunker Wall Design Wall ESS
Manufacturing Processes
After service guide for changing PCB
Presentation transcript:

1 PFDPU Mechanical Packaging PEER REVIEW MAVEN PFDPU Particle and Fields Data Processing Unit Mechanical Packaging and Design Overview May 09, 2011 Bill Donakowski UCB/SSL Mechanical Engineer

2 PFDPU Mechanical Packaging PEER REVIEW PFDPU Overview/Design Drivers Box to contain consist of 11 separate cards with frames bolted together Each Card contains PCB, connectors, metal frame, EMI shield, and attach fasteners Each card can be removed from Assembly with minimum dis-assembly of box Electrical interconnects as well as external connectors to S/C and individual Instruments Bolted to S/C Panel on one face Frame surface treatment: gold alodined interior, black anodized exterior Box is thermally isolated from S/C Panel High vibe levels: 20.4/14.4 GRMS (Protoflight/Flight)

3 PFDPU Mechanical Packaging PEER REVIEW PFDPU Design Changes from Baseline MDM connectors replace PC104 interboard connectors –Interboard connections removed All electrical connections via external connectors and harnesses External harnesses between MDMs on top of box Loss of interboard connectors simplifies assy, alignment, & tooling No need for jigs to align connectors to boards and boards to frames No need for demate or mate tools for connectors Removal of cards does not involve connector demate –New EMI shield required outside of MDM Cable harnesses Custom inserts replace nuts holding PCB/frame Custom 4-40 flanged inserts, silver plated Soldered to face of PCB 2 Additional Skewers installed at Sides Box stiffness features incorporated into two Cards –MAG and DFB Individual PCBs to be bonded to Frames

4 PFDPU Overview Ascent Vent Assemblies EMI Shield 4 x Threaded Skewers D-Connectors To S/C Interface Bracket to S/C 11 x Individual Cards in Frames

5 PFDPU Mechanical Packaging PEER REVIEW Cards Stacking

6 PFDPU Mechanical Packaging PEER REVIEW Assembly Details End Shields (6061 T6) 4 X Threaded Rod Skewers Individual Box Frames (6061 T6 Al) 6 X Attach Feet to S/C Attach Bolts to Box Frames MDM & SMA Connectors (harnesses not shown) EMI Shield Assy

7 PFDPU Mechanical Packaging PEER REVIEW Typical Card Layer PCB Attach Screws Connectors Aluminum Box Frame EMI Shield (PCB FR4/Cu) Inserts PC104 Interconnect Traces

8 PFDPU Mechanical Packaging PEER REVIEW Interlocking Frame Overview Frame (.100” thick) PCB (.0625” thick) EMI Shield (.031” thick) Interlocking Frame Features Custom threaded inserts

9 Structural Analysis and Design Ongoing effort with FEM and design to stiffen Boards, Frames, and entire Box Skewers added at center of sides PCBs to be glued to Frames Side shear panels being considered D. Pankow to provide ongoing analysis overview

10 PFDPU Mechanical Packaging PEER REVIEW Status, Ongoing Effort and Challenges EM Frames fabricated and given to EEs Fit check OK Frames and inserts work well Late change to MDM connectors requires additional work New connector locations and coordination w/ board layout personnel New EMI Shield design and Venting Details New stiffening effort of individual cards by LASP and GSFC Closer coordination with outside design groups Verification that Frame interlock scheme and overall fit is adequate (no longer fabricated by same group) New custom inserts design completed Addition of two skewers simple Any new changes a/r by ongoing structural analysis

11 Back-up: LASP DFB Box Stiffening Concept

12 Back-up: Actions from last PEER Review (May 2010) 1.Hypertronics PC104 issues go away with change to MDMs 2.Four skewers implemented 3.Heat sinking/thermal design ongoing