M. Gilchriese Stave Prototype Status Summary July 5, 2006.

Slides:



Advertisements
Similar presentations
M. Gilchriese US ATLAS Pixel Meeting July 18-19, 2002 UC Santa Cruz.
Advertisements

Magnetic fields R&D update B. PlasternEDM November 2007 Collaboration Meeting Results from prototype studies of a 1/6-scale B 0 coil with Results from.
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
Mechanics/Cooling U.S. Silicon Strip Upgrade Meeting M. Gilchriese August 12, 2008.
25/06/2015Robert King, Oxford University - Graduate Seminar Series 1 Electronic speckle pattern interferometry at the SLHC.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
ATLAS Pixel Detector October 2001 Pixel Week N. Hartman LBNL 1 PST Design Update PST CDR october 2001.
M. Gilchriese Mechanics Labor and Disk Sectors US Pixel Meeting November 2001.
Pixel Upgrade Local Supports Based on Thermally Conducting Carbon Foam E. Anderssen, M. Cepeda, S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman,
MEBT & RT CH Section Thomas Page Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006.
Mechanics: Status and Plans Bill Cooper (Fermilab) (Layer 1) VXD.
M. Gilchriese Status Report Sectors, Rings, Frame December 2002.
WBS Stave Mechanics, Cooling and Support - LBNL ATLAS Upgrade R&D Meeting UC Santa Cruz May 3, 2007 E. Anderssen, M. Cepeda, S. Dardin, M. Gilchriese,
U.S. ATLAS Executive Meeting Upgrade R&D August 3, 2005Toronto, Canada A. Seiden UC Santa Cruz.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
M. Gilchriese Upgrade Stave Assembly and Robotics August 3, 2007 LBNL.
SLHC Pixel Layout Studies S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman LBNL November 4, 2008.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
US Stave Core Production D. Lynn (BNL), LBNL Mechanical Meeting, Sep
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
M. Gilchriese SLHC Pixel Local Supports Based on Thermally Conducting Carbon Foam E. Anderssen, M. Cepeda, S. Dardin, M. Garcia-Sciveres, M. Gilchriese,
M. Gilchriese - November 12, 1998 Status Report on Outer Support Frame W. Miller Hytec, Inc E. Anderssen, D. Bintinger, M. Gilchriese LBNL.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Upgrade Stave Study Topics Current Analysis Tasks –Stave Stiffness, ability to resist.
ACFA-7; Taipei, Nov 2004 H.Weerts status Si licon D etector Status H.Weerts Fermilab/Michigan State Univ. (Progress on Si-tracker layout)
Mechanical and Thermal Management for ATLAS Upgrade Silicon Tracking System W. O. Miller (iTi) Carl Haber (LBNL), Gil Gilchriese (LBNL) Carl Haber (LBNL),
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
M. Gilchriese Sectors, Rings, Frame Assembly and Installation July 18.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
M. Gilchriese Integrated Stave Mechanics and Cooling ATLAS Upgrade Workshop December 2007 M. Cepeda, S. Dardin, M. Gilchriese, C. Haber and R. Post LBNL.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
LHC CMS Detector Upgrade Project FPIX Cooling Update Stefan Grünendahl, Fermilab For the FPIX Mechanical Group, 29 January 2015 Stefan Grünendahl,
DOE/NSF Review of U.S. ATLAS /March 2001 WBS Pixel Overview and WBS Pixel Mechanics M. G. D. Gilchriese Lawrence Berkeley Laboratory.
M. Gilchriese Pixel Update October 3, M. Gilchriese 2 Outline Barrel status and repair strategy Revised ATLAS installation schedule Finishing pixel.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
Walter Sondheim 6/2/20091 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL Mechanical Project Engineer.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
ATLAS Pixel Detector July 2003 SC Pixel Meeting N. Hartman LBNL 1 Pixel Support Tube WBS Santa Cruz Cost Workshop July 9, 2003.
Pixel Upgrade Carbon Foam and Outer Stave Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, T. Johnson, J. Silber Lawrence Berkelely National.
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
M. Gilchriese - December 2000 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Wirth and D. Uken Lawrence.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
Task 4.2 Stave Core Assembly (Tim). Task 4.2 Outline Year 1: Design and construction of staves and stavelets suitable for 130nm ASICs which will be used.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
M. Gilchriese Work Plan W. Miller iTi M. Cepeda, S. Dardin, M. Gilchriese, C. Haber, R. Post LBNL February 6, 2007.
A hollow stave Ian Wilmut – August LBL stave At the March UG week LBL showed a prototype asymmetric stave. This prompted consideration of the strip.
M. Gilchriese Towards Fabrication of a Mechanical Prototype Stave.
C. Haber / M. Gilchriese Integrated Stave Electrical/Mechanics/Cooling Update February 6, 2008.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
1 Disk Sectors Integrated support and cooling for disk modules. Each sector has 6 modules Number of sectors is 2x9+4x8=50. Fabrication of all sectors in.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
Magnetics Program Highlights VLT Conference Call September 13, 2000 presented by J.V. Minervini MIT Plasma Science and Fusion Center.
M. Gilchriese - February 2001 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Taylor, T. Weber, J.
Mickael Frotin– 05/07/2010 EUDET MECHANICAL R&D EUDET news - 1.
M. Gilchriese Upgrade Stave Mechanics(Only) Status September 16, 2006.
LDR 531 Week 3 Summary R-531/LDR-531-Week-3-Summary For more details
Work progress in Turin x the MVD
Mechanics: (Tim).
This is my sheet And this is my sheet.
Presentation transcript:

M. Gilchriese Stave Prototype Status Summary July 5, 2006

M. Gilchriese 2 Very Brief Status Summary(1) See Approximately 1m long prototype, appropriate for inner layers of upgraded silicon tracker Conceptual design complete Now working on tooling design –Iterating on conceptual outline, expect to complete in about one week –Detailed design of tooling to be done by iTi with input and review by LBL. Complete by about end FY06 such that fabrication could start in FY07(requires new money) In parallel working on procurement of honeycomb and fiber material. Expect to place order in late August, early September(such that actually costed in FY07). Current plan is to use existing aluminum tube(left over from pixels), flattened

M. Gilchriese 3 Very Brief Status Summary(2) Internal “review” around time of September meeting associated with Carmel would be good idea. Fabrication of subcomponents(CF sheets, bent and flattened tube, etc) would be done at LBL using automated cutter and autoclave. Fabrication starting towards end of calendar ’06 Followed by stave “core” assembly in early ’07. My guess is that then would follow parallel paths with different “cores”: (1) mechanical and thermal measurements(eg. deflection, thermal distortions) and (2) mounting of silicon. Both of these will take considerable time, but can decide later