Gabcikovo/Nagymaros conflict

Slides:



Advertisements
Similar presentations
Even Day 2: January 6, 2014: Bell Ringer Describe the location of the Danube river and how has it been used over time?
Advertisements

A RIVER – A GIFT AND AN ELEMENT. Polish river network Almost whole Poland is in the Baltic Sea catchment area, in river basins of two major rivers: the.
A RIVER – A GIFT AND AN ELEMENT. Polish river network • Almost whole Poland is in the Baltic Sea catchment area, in river basins of two major rivers:
UNW-DPC International Workshop Institutional Capacity Development in Transboundary Basins Lessons learned from practical experiences 10 – 12 November 2008.
PAPER PREPARATION GET OUT YOUR ANALYSIS CHART FROM YESTERDAY AS WELL AS A SHEET OF PAPER. TODAY WE ARE USING THE RARELY USED SIX PACK FOLD. 1. FOLD THE.
Directorate for Inland WaterwaysRepublic of Serbia - How the Danube within Serbia is being integrated into a major sustainable waterway and to deal with.
1 An EU Strategy for the Danube Region : Transport Working Group meeting Transport priorities Brussels, 16 September 2010 Johann Sollgruber, DG REGIO,
Danube River Basin Study Sili Liu Example of international basin-wide watershed management.
The Berlin Blockade and airlift- what happened?
EUROPEAN UNION (integration of European countries)
The Danube Basin ICPDR Philip Weller Danube Leaders Conference, Novi Sad, July 9, 2010 The Ecological Foundations for Development.
Study the images. 1. What is going on? 2. What does this suggest about the control of the Soviet Union? 3. Why might this have happened?
REGIONAL WORKSHOP "AGRICULTURAL NUTRIENT POLLUTION CONTROL IN BLACK SEA DANUBE PARTNERSHIP COUNTRIES" Ministry of the Agriculture and Water Management.
JRC information day, 11 May 2006, Romania European Early Warning Systems for Floods and Droughts - How could Romania benefit? Dr. Ad De Roo European Commission,
Ch. 23, Section 5: Searching for Peace
International Cooperation in Water Management and Pollution Control in the Danube River Basin Joachim Bendow, ICPDR Executive Secretary 1.
Timeline of the European Union
Okavango Basin Abigail Tomasek. Okavango Basin Approximately 1600 km long Majority of basin undeveloped and one of.
The Black Sea Region: New Challenges and Opportunities for Regional Cooperation ( ANALYSES from Ukraine) prof. Grygorii Perepelytsia.
Regional Trading Agreements European Union 1. RTA 1945 – 1959 A peaceful Europe – the beginnings of cooperation Aim of ending the frequent and bloody.
The sharing of the water between the Netherlands and Belgium Poland, Miedzyzdroje, april 2002 Ministry of Transport, Public Works and Watermanagement.
Institutional Capacity in Transboundary Basins: The Danube The Experience of the ICPDR UN Water Decade Workshop 11 November, 2008, Bonn Philip Weller.
VI International Symposium on Trasboundary Waters Management, Thessaloniki, October 2008 The European Union’s Marine Strategy Directive Dr. Angeliki.
ZACH, MADDIE AND AUDREY The Nile River. Demographics The river touches 11 countries: Ethiopia, Sudan, Egypt, Uganda, Demographic Republic of the Congo,
UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes A unique framework for improved management of shared waters.
River basin management The Rhine experience Henk Sterk Head of the Secretariat of the International Commission for the Protection of the Rhine.
THE RHONE RIVER BASIN Alex Houston February 23, 2012.
Connecting rivers and seas – the Danube/Black Sea experiment Laurence Mee.
BLACK SEA: FROM “CLOSED SEA” TO A SEA OF REGIONAL COOPERATION by Nilufer Oral, JD Bilgi University.
Gabčíkovo is the waterworks on the Danube river. it was common project of Hungary and Czechoslovakia. Later Hungary abandoned this project and Czechoslovakia.
From January to June 1918, U.S. President Woodrow Wilson and The representatives of the European powers met at the Palace of Versailles, outside Paris,
EU Enlargement. The EU Quick History  1950s – The European coal community begins to unite European countries politically and economically, the founders.
Natura EU ambitions for a coherent ecological network State of Play and Challenges Saskia Richartz Institute for European Environmental Policy.
Philip Weller, ICPDR Progress and current status of the Joint Statement The ICPDR point of view Joint Statement Meeting Jan. 2009, Budapest.
COLLEGE - LIMASSOL BUSINESS STUDIES European History Lecture 12.
Kosice The ancient Hungarian city.  The city was made of two independent settlements: Lower Košice and Upper Košice  The two parts merged in the 13th.
The Danube ICPDR Philip Weller Brussels, Feb 24, 2011 Corporate Partnerships in River Basin Management.
1 Public participation in the Danube Basin: approaches, activities, challenges Jasmine Bachmann ICPDR Secretariat UN Conference on Info Management and.
“Lake Peipsi/River Narva basin – working together on the new Eastern border of the EU” Harry Liiv Deputy Secretary General on Environmental Management.
Bucharest, 20 January Position of the Slovak Republic The EU Danube Strategy A new instrument of Cohesion Policy after 2014 Implementation of projects:
European Union European Union EU built on treaties.
Management of the Great Lakes by the U.S. and Canada Presented by Johnny Sullivan March 6, 2012.
INTERNATIONAL ENVIRONMENTAL LAW Inland waters protection Movements of hazardous waste.
INTERNATIONAL ENVIRONMENTAL LAW Inland waters protection.
The Mekong River Commission: Challenges, Mission, and Strategies.
Bellringer Get ready for your quiz! After your quiz, complete the “Treaty of Versailles” Worksheet individually BJOTD: What happens when two oxen bump.
Status of the Intergovernmental agreement on the Dniester River Basin Round table “Towards Integrated Management of the Transboundary Dniester River Basin:
The Rhine – Danube Corridor
Joint bodies according to the UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes Francesca Bernardini United.
INTERNATIONAL SAVA RIVER BASIN COMMISSION Almaty (KZ) October 2007 SAVA RIVER BASIN COMMISSION Dragan Zeljko The Sava Commission Secretariat Deputy.
The Adriatic Sea Partnership: A pilot program for the Mediterranean “Extraordinary Meeting of MAP Focal Points” Side Event Catania, Italy 7 November 2006.
Détente between East and West
Mapping the Danube River and Impacts of the Gabcikovo Water Project by Kristi Shaw.
Brussels, 15 November DANUBE: where we are? E. Sovjáková chairperson of the GIS/ESG ICPDR.
Presented by Michel DIMBELE-KOMBE Director of Water Resources and Environment Lake Chad Basin Commission (LCBC) THE OPERATIONAL TOOLS THAT ALLOW ACHIEVING.
The Mekong River Commission: Challenges, Mission, and Strategies.
The Azerbaijani Republic The Ministry of Ecology and Natural Resources WATER RESOURCES OF AZERBAIJAN, THEIR MANAGEMENT AND BILATERAL AGREEMENTS Matanat.
Study the images. 1. What is going on? 2. What does this suggest about the control of the Soviet Union? 3. Why might this have happened?
Transcarpathian Regional Council Zahony Development Company Beregovo District Administration Municipal government of village Diyda ENPI Cross-border Cooperation.
UNIT 4 revision The UK and the wider world EUROPE.
Important Global Organizations/Agreements
Pan-European transport corridor No. 7
Reducing impacts of the Danube River Basin on the Black Sea
History of the region CEE
Europe Day 2018.
The EUROPEAN UNION EUROPEAN UNION.
The EUROPEAN UNION © Brain Wrinkles.
FLOODS IN ROMANIA IN 2006.
Central Powers Collapse
Transboundary cooperation in the Dniester River basin
Presentation transcript:

Gabcikovo/Nagymaros conflict The Danube basin Gabcikovo/Nagymaros conflict

Some characteristics of the basin Length : 1 770 mi (2 850 km) Basin area : more than 312 000 sq mi (800 000 sq km) Flow at the mouth : 6 500 m3/s Main tributaries : Inn, Drave, Tisza, Save, Morava, Prout Main human constructions : Gabcikovo dam. It had very serious ecological consequences in Hungary. The Danube is linked to the Rhine by the "Europa-Kanal" and to the Oder by the" Danube-Oder Canal". The "Main-Danube" enables the communication between the Black Sea and the North Sea. 69 hydroelectric dams

Main problems in the danube basin Heigh level of pollution especially in the delta => the ecosystem is in danger. Heigh freqency of floods: the last one was last year and was the 100 year flood (march 2002:damage estimated at tens of billions of euros). To many dams built due to the communist ideology which was to control mother nature.

Main problems relative to the danube basin Heigh level of pollution especially in the delta => the ecosystem is in danger. Heigh freqency of floods: the last one was last year and was the 500 year flood (march 2002:damage estimated at tens of billions of euros). To many dams built due to the communist ideology which was to control mother nature.

Weight of history Crimean war (treaty of Paris in 1856): creation of a european commission to control the Danube delta. World war one (treaty of Versailles 1919):the european commission is confirmed. World war two:Nazi germany, communist bloc (created their own commission). River of coorperation: - Establishment of the Environmental Program for the Danube River Basin in 1992.

Weight of history - Convention on Cooperation for the Protection and Sustainable Use of the Danube River Basin (DRPC), which was signed in June 1994 by the 11 countries bordering the river and the European Union. - Strategic Action Plan (SAP) developed and signed in 1994.

Gabcikovo/Nagymaros conflict 1976, the two countries signed the Joint Agreed Plan. Enormous political pressure from environmentalists, they stopped working on the Nagymoros dam on July 20, 1989. Czechoslovak Party gave notice to a new provisional solution on August 31, 1993 -- to divert the Danube on Czechoslovak territory to correct the environmental damage that would occur.

Gabcikovo/Nagymaros conflict The diversion of the Danube River onto Slovak territory will change the international   boundary between the two countries. Affect Hungarian trade flows because duties may be charged by Slovakia to cross their territory on the New Danube River. Environmental impact of diverting the river is immense. Water supplies to some ethnic Hungarian Danube villages will be cut off, while others would be flooded. In 1992 a European Commission is set up. Publication by the World Wide Fund for Nature (WWF) of a study warning about the environmental damages caused by the dam. On October 29, 1992 both sides agreed to allow the International Court of Justice to rule on this matter (The court has concluded that both parties committed internationally wrongful acts)

Questions When we look at the Gabcikovo/Nagymaros case, what factors affect the reaching of an agreement during the building of a dam? How would you explain the failure of the agreement between Hungary and Czechoslovakia? Do you think that the era of big dams is over because it is not environmentally compatible? The number of members of the European Union has increased recently with the admission of Hungary and Czech Republic. Do you think it will improve the situation or make it more complicated? The G.N.O (WWF, UNECO etc…) seem to have the power to decide whether a project will succeed or not: they can paralyze a project in the name of the environment… what role should they play? Does the international community have the right to protect the natural treasures of the planet against irresponsible national governments?