Prototype Update #3 Team Meathead April 13, 2005.

Slides:



Advertisements
Similar presentations
STEM AGENDA Week 30 3/25 – 3/29. Agenda 3/25 O Learning Target: Continue learning about general safety. O Agenda: O Review General Safety O Prepare to.
Advertisements

Gears 2 nd Period TED. What is a gear? A toothed mechanical part, e.g. a wheel or cylinder, that engages with a similar toothed part to transmit motion.
Mrs. Hernandez 8 th Grade Science April 22 nd -26th 2013.
STEM Agenda Week 31 4/8 – 4/12. Agenda 4/8 Learning Target: Brainstorm and research wind turbine ideas. Agenda: Turn in Safety Pledge!!! Review Wind Turbines.
Week 14 11/26 – 11/30. Define problem, brainstorm ideas, and research playground design.
Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter 2006 P. 1 Today and the Week Ahead Week 3 Day 1.
Engineering H193 - Team Project Spring Quarter 2003 P. 1 Performance Test 2 Week 4 Day 3.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
1 As Class Convenes u Pick up your team’s folder; and sign attendance form u Get ready for the Trade Show (i.e., set up your Poster and display your prototype)
Engineering H193 - Team Project Gateway Engineering Education Coalition Performance Review Week 3 Day 3.
Low Cost Fundus Camera P15590 December 11th, 2014
BAJA STATUS UPDATE September 27, 2011 FRAME & SUSPENSION Research Phase 100% completed Design Phase 75% completed – Frame Design (CAD) – Suspension Design.
Administrative Stuff ECE 297. Administration Milestone 0: –Submit by Friday at 5 pm –Demo in lab this week –Write your name on the board when ready to.
Robot Physics: Part 1 By: Danica Chang and Pavan Datta Team 115.
History Warm-Ups Week # 34 Dates : May Monday: (Count down 6 lines and draw a line) _______________________________________________________________________________.
FMSP Year 10 Team Mathematics Competition Round 2 NAME THAT RULE!
Year 10 Work Experience Monday 30 th June – Friday 4 th July 2014.
Weekly Meeting 4 September 30 th,  Look into revolving door company ◦ Check into their patent ◦ See what they power ◦ Estimate the energy generated.
The top of the list… More… Still more… More…
Date: © 2014 Indecomm Global Services Confidential Web Timesheet Supervisors’ Tutorial August 2014.
5546 NW Beaver Dr #400 Johnston, IA Phone: Monday - Friday “For your equipments health and maintenance … The.
1 Managing the development and purchase of information systems (Part 3) BUS Abdou Illia, Fall 2005 (Week 12, Wednesday 11/16/2005)
Weekly Meeting 6 October 23rd,  PDR  Amherst bike shop visit  Cap self discharge test ◦ 2.6V to 1.8V (800mV) in 60 hours ◦ No longer a concern.
Sentence Structure Jeopardy!
 The Arrinera Automotive is a Polish car brand known for creating the first Polish supercar called the Hussarya. The name of the car refers to seventeenth-century.
Week 7 Status Updates. Statement of Work: To design and prototype an attitude control system (ACS) for a Cube-Sat. This ACS will align the Cube-Sat with.
The Supreme Court At Work Chapter 12 Section 1. The Court’s Procedures Since 1979, the Supreme Court has been in continuous session, taking only periodic.
Fischertechnik Mechanisms
WEEK 8 English 9 B February. Wednesday, February 19  Collect FINAL papers / time for printing and stapling  Organize with final paper and rubric on.
Jefferson Eagles Spirit Week April 27-May 1. What is Spirit Week? Show your JEFFERSON PRIDE! Week of April 27-May 1 all 6-8 grade students dress up! Each.
Shadow Photography Photography 2.
Electricity How much electricity do we use? Have you ever thought about how much electricity we use? Could we use a measuring stick? How could we find.
BRENSCOMBE Welcome to our 2011 Brenscombe Meeting 6pm on 15/11/2010 The Brenscombe trip this year is from Monday 27 th June to Friday 1 st July.
Level 1 and 2 Mathematics Studying at East Norfolk Sixth Form College.
WEEK 1 You have 10 seconds to name…
Innovation Challenge How can the back to school shopping experience be made better?
Responsibility 8 th grade final countdown. STRIKE  It’s time to prepare for High School and for you to demonstrate to us what you have learned at Depoali.
WARM UP Solve and Graph 1) 2).
Course Instructor Professor Clark J. Radcliffe Office hours: MWF 11:30-12: EB ME 481.
Work Experience Week 2011 Monday 27 th June – Friday 1 st July Your user name & a secure PIN will be ed to your First Class account.
fischertechnik Mechanisms
C onsideration A mbition Resilience E nterprise E xcitement R esponsibility.
Week 15 Monday, 12/1/14 Entry Tasks: 1. Turn in your Book of the Month paper in the tray in the back. 2. Turn in your book to the circulation desk. 3.
Welcome. Click to Get Started.. Thanks for visiting the KYTC One Stop Shop… Help us help you. Let us know you’re here by signing in using our kiosks.
Green Belt Deliverables for Week Two Six Sigma Foundations Continuous Improvement Training Six Sigma Foundations Continuous Improvement Training.
EMIS COORDINATOR MEETING APRIL 17, 2013 ACCESS. TSDL Project TSDL Update Impact of EMIS and TSDL Staff Member Records Questions?
Fall Weather Unit Your Fall Weather Update! By: Reporter ____________.
30 March 2005Safety Lock Mailbox1 Safety Lock Mailbox ME 4182: A-Team Week 11: Prototype Production Carlos Alzate Brian Dorton Song Park Varun Sharma Jack.
Last minute reminders!!!!!!. Don’t forget to… Submit the final draft to turnitin.com!!!!!!! – MUST SUBMIT BY FRIDAYMORNING!!!! – I cannot grade your paper.
Lead from the front Texas Nodal 1 Registration Market Call Nov 14, 2008.
ELECTRONIC BID SUBMISSION An Excel sheet as pictured below will be sent to you via .
SATs Information Meeting Tuesday 12 April SATs Week: 9 – 12 May 2016.
POS 420 Week 5 Learning Team UNIX Linux, and Windows Server Critique Finalize and submit the UNIX ®, Linux ®, and Windows Server ® Critique. Finalize and.
UOP WEB 237 Complete Class Check this A+ tutorial guideline at For more classes visit.
WEB 237 Week 5 Learning Team Finalized Paper Only Submit the eCommerce analysis paper and prototype Check this A+ tutorial guideline at
HCS 449 Week 2 Learning Team Case Study Presentation Topic Proposal Submit a brief ( word) proposal on the topic you plan to use for your Case Study.
BSA 411 Week 5 Team Assignment Business System Analysis Methodology Plan Paper and Presentation Learning Team Business System Analysis Methodology Plan.
BSA 502 Week 6 Final Team Assignment Business Systems Paper and Presentation (Riordan Manufacturing) Learning Team Riordan Manufacturing Paper Finalize.
Discussion: What is this residual plot telling us about the relationship between speed and braking distance? Let’s now end by discussing how to interpret.
What you don’t know about Can Cost You---BIG TIME!
Two-Gear Gear Trains Using different size gear allows change in speed
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
PM 598 RANK Education Your Life / pm598rank.com
MKT 421 Week 4 Apply: Marketing Lemonade (Part 1) Download Your Course Here:
MKT 421 Week 4 Apply: Marketing Lemonade (Part 1) Download Your Course Here:
PM 598 RANK Education for Service-- pm598rank.com.
Mechanical Engineering: Gears
Engineering Design – Level 4
The difference between Equal Pay and Gender Pay
Increasing V Torque Speed Characteristic of Regenerative Braking T.
Presentation transcript:

Prototype Update #3 Team Meathead April 13, 2005

Past Received off-the-shelf parts Submitted parts to shop Submitted part to STL

Present Shop Update STL Update Still looking for viable motors Toroid success story... Received the gears...finally

Shop Update Next in line Parts should be complete within a week

STL Update STL parts should be ready by Friday or Monday

Motor Update Got responses from all the motor companies –Igarashi cannot take orders for less than 5000 –Three companies with reasonable quotes –Best Quote – $5.45/motor Needs different gearing due to lower torque, higher speed

A Toroid Success Story...

Future Build party Final report and presentation