CRYOGENICS Stephen Muchovej Caltech.

Slides:



Advertisements
Similar presentations
Water Conservation By a 9 th Grade IPC Student. Wasted Water Most of the water within normal households are consumed and used more than they should be.
Advertisements

Install L2 Switch Head End CATV
Chapter 6 Cranes Crane Operation • Industrial Cranes • Mobile Cranes • Crane Inspections.
Introduction to Closed Cycle Cooling Systems (for MICE) Tom Bradshaw Rutherford Appleton Laboratory MICE Video conference 24 th March 2004.
HYDRAULICS & PNEUMATICS
EMB PAR, 23 nov P. Perrodo, LAPP, Annecy1 ATLAS EMB SERIE MODULE CABLING Experience started with three successive prototype modules (module 0) in.
Supermicro © 2009Confidential MCP N installation guide Rech Weng.
Air Conditioning Compressors.
The Use of Small Coolers for Hydrogen and Helium Liquefaction
COLD FRONT END STATUS. OUTLINE RF Cryo System Mounting Apparatus 27-m cryo upgrades.
RHIC CRYOGENICS SYSTEM Time meeting /28/20141TIME MEETING RUN 14 –CRYOGENIC.
Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October.
March 4, 2005 All rights reserved Torque – Angle in Slip Ring - Non-Contact Rotary Torque Sensor Installation Tips Foot mount torque sensor Driver Load.
BAAS Senior Project Crane Gas Plant Sergio Helguera.
PLANTS.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Magnet and Absorber Heat Loads and Cooling with Various Small Coolers
Compressor status AWAKE Technical Board meeting 19 May 2015.
from the The Evolution of the Water Cooler 500W 0.050W/h 149W/h kgCO2/l kgCO2/
SOLAR CHILL SOUTHWEST SOLAR PUMP POWER IN FAN MOTOR PAD MEDIA PUMP BOARD.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
Horizon Implementation Timeline Keith McBride. Horizon Implimentation Day 1 Order recieved at Zest4 Day 1 Site Survey Ordered Day 4 Site Survey Report.
COLD FRONT END Stephen Muchovej Caltech. CONSIDERATIONS RF System Itself Physical Considerations Packaging Mounting.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs – Me Comp1 11K hrs, Comp2 11K, Comp3 20K, Comp4 18K Service cold.
Hit PAGE DOWN to go faster or to move to the next slide. Use PAGE DOWN or PAGE UP to move forwards or backwards in the presentation. Hit PAGE DOWN to continue.
Robin Lafever For Russell wilcox Fiber Synch System Basic Box Fit-up 25mm and 50mm deep boxes installed in 17” chassis 12/1/20151Robin Lafever LBNL.
Natura Water Machine B and D Series 3 – Dispense tower plumbing kit Kit number Kit includes components used for both Natura B and Natura D series.
Assembly Procedures of the cavities Ancillaries (RF power coupler, Tuning system, RF cables) 19/03/2014Mathieu Therasse BE/RF/SRF1 Special Linac WG meeting:
Water Conservation
Process Capability (Example) Food served at a restaurant should be between 38 o C and 49 o C when it is delivered to the customer. The process used to.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
HiSeasNet Case Studies 1SIO Aug '09. Case 1  Symptoms:  AGC fluctuates in port for a short periods of time (seconds or minutes) fairly often, but not.
Installation of Shades and Scintillation Cube C.Woody, M.Durham, J.Kamin B.Azmoun, A.Caccavano HBD Meeting April 29, 2007.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
Neutrino Cryogenics Requirements Meeting 25/09/2014 Day 1 review.
1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs - Me Service cold heads - Sumitomo Replace broken insulating vac.
NETWORKING COMPONENTS lLTEC 4550 JGuadalupe. HUB -THIS IS A HARDWARE DEVICE THAT IS USED TO NETWORK MULTIPLE COMPUTERS TOGETHER. IT IS A CENTRAL CONNECTION.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
Spectrometer Solenoid Prep Work at RAL and LBNL Steve Virostek Lawrence Berkeley National Lab Steve Virostek Lawrence Berkeley National Lab MICE VC May.
CMTF Infrastructure Jerry Leibfritz PIP-II Machine Advisory Committee 9-11 March 2015.
Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
LANL Cost and Schedule Review 02/11/05 1 Cryostat (lower half) WBS 3.1, 3.5, 3.6, 3.7, 3.8, 3.10 Paul Huffman, Chris O’Shaughnessy North Carolina State.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
BIMA Antenna Reconstruction. AntennaFarm.V3 antenna assembly lift pedestal onto base (CRANE) lift dish onto pedestal (CRANE) reinstall ladder (FORKLIFT)
Cryogenics Introduction for building requirements SHM-SLN-SHE S. Claudet, TE-CRG Kick-off meeting Civil Engineering Consultants 31st May 2016.
Cryogenic Plant Controls – Cost and Schedule
He Plant, LN2 Systems and Commissioing
Advantages & Disadvantages of Rotary Screw Air Compressors in Myanmar
EVLA Helium Circuit Cryogenic
Cryogenic behavior of the cryogenic system
Marco Statera NA62 - GTK working group meeting
HYDRAULICS & PNEUMATICS
Unit 40: Engines and motors Dr
Air Distribution Control
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
Capturing images with a tracking mount—advanced
Process Capability (Example)
Grinding Edges Square & Parallel
كار همراه با آسودگي و امنيت
A typical circular clarifier
Subhead text can go here
SNS PPU Cryomodule Instrumentation
STEP ONE. STEP ONE. STEP ONE. STEP ONE. STEP ONE. 02
CTI 8200 Compressor Compatibility Notes
Large Air Systems – Sales Training
SNS PPU Cryomodule Instrumentation
Presentation transcript:

CRYOGENICS Stephen Muchovej Caltech

CTI Cold Head CTI 350: 4W at 20K and 20 watts at 77K Could use Oxford cryogenic too

CTI Compressor CTI 350 (~$4K) uses either Model 8200 (~$5K) or 9600 (~$8K) CTI 1020 (~$5K) only works with Model 9600, which is water chilled Helium lines are typically ~$30/foot + couplings

Installation Compressor in pedestal. He lines in the equatorial mount need a 4-port rotary union ($~5K) Slack inside the el axis Cables need to come out here

Timeline Other people involved are Russ Keeney (design/concept) and Tomi Hovatta (machining/installation) April/May: Inspection of telescope and design of cable feedthroughs May 15: Order all helium cables/compressor/fridge head July-August: Machining of clamps/whatever else necessary for installing the lines September-October: Installation.