Developing a Purpose & Need Statement. Objectives  Understand when the P&N is developed in the PDP  Understand the importance of a well- written/well-justified.

Slides:



Advertisements
Similar presentations
U.S. Route 30 Environmental Impact Statement & Phase I Design Report Community Advisory Group Meeting Thursday May 8, 2008.
Advertisements

DEL-71 Project at the US 36/SR37 Interchange Round Table Meeting Ferzan M. Ahmed, P.E.- District 6 Deputy Director Steve Fellenger, P.E. – Project Manager.
ODOT’s Public Involvement Process PI and the Project Development Process Minimum PI Requirements.
Developing a Public Involvement Plan Why Develop a PI Plan? PI Plan Format Public Involvement Training Class – Presented by the Office of Environmental.
Purpose & Need Class How to Write a Better Statement
Section 4(f) Section 6(f). Section 4(f) Process Overview 2 Project Initiation Package Field Review 4(f) Property Present Use Coordination NEPA Document.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
What is a Feasibility Study (FS) and an Alternative Evaluation Report (AER)? ENVIRONMENTAL UPDATE MEETING NOVEMBER 20, 2014 HEATHER MCCOLEMAN OES MAJOR.
Meteorology Combined License NRC Review Process Meteorology Joseph Hoch Physical Scientist U.S. Nuclear Regulatory Commission June , 2008 Nuclear.
NEPA ASSUMPTION SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM.
New I-65 Interchange at Worthsville Road Welcome!.
Environmental Assessment Public Meeting
ODOT’s New PI Manual Kevin E. Davis Environmental Supervisor Office of Environmental Services.
Surface Transportation project delivery program
Lec 20, Ch.11: Transportation Planning Process (objectives)
NHPA, Section 106, and NEPA Highlights and Misconceptions.
Project Background STIP update - City requests cancellation of US101 at Logan Road EA and proposes new modernization project: US101 at 32nd Street.
I n t e g r a t I n g C S S Practitioner Module 2 1 Module 2: Building the Case for Change.
Purpose and Need 1. Importance of Purpose and Need 2  Understanding federal requirements for development of P&N statements  Know that a good P&N is.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Oversight Team Meeting December 11, INTRODUCTIONS (15 MINUTES) Name and affiliation Purpose of meeting/ review agenda Edits to September’s Oversight.
Meeting Agenda Stakeholder Participation Panel July 14, 2003 Welcome/Introductions Study Overview Tasks/Products/Schedule Traffic Patterns Break Key Project.
US 101 Corridor Plan Prepared by: Oregon Department of Transportation May 2013.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
FAO/WHO Codex Training Package Module 3.2 FAO/WHO CODEX TRAINING PACKAGE SECTION THREE – BASICS OF NATIONAL CODEX ACTIVITIES 3.2 How to develop national.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
ADOT Multimodal Planning Division Planning Assistance for Rural Areas (PARA) Program Overview December 4, 2013.
1 Context Sensitive Design CE 453 Highway Design Iowa State University Howard R. Green Company.
SAFETEA-LU Section 6002 “ Efficient Environmental Reviews for Project Decisionmaking”
Secondary & Cumulative Effects Analysis Training Program Maryland State Highway Administration’s Secondary and Cumulative Effects Analysis Guidelines For.
ITS Standards Program Strategic Plan Summary June 16, 2009 Blake Christie Principal Engineer, Noblis for Steve Sill Project Manager, ITS Standards Program.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
WRITING A BETTER PURPOSE AND NEED A COMMON SENSE APPROACH Kevin E. Davis Environmental Supervisor ODOT-OES.
Draft TIP for E-rate. What is E-rate? The E-rate provides discounts to assist schools and libraries in the United States to obtain affordable telecommunications.
Andrew Winga, P.E. – WisDOT Project Manager.  Background on numerous Transportation Studies  What is a Planning & Environment Linkage Study  Problem.
Linking Planning & NEPA Overview Mitch Batuzich FHWA Texas Division FHWA Texas Division April 17, 2007.
Community Context Audits And Public Involvement Plans Rickie Clark, INDOT Joyce Newland, FHWA Presenter Title, INDOT Event Date.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Oregon Passenger Rail Leadership Council Meeting June 6, 2012.
Phase I Engineering and Environmental Studies Project Development Flowchart US Route 45; IL Route 132 to IL Route 173 and Millburn Bypass CSS
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
USA Parkway Project Welcome Public Information Meeting to the
Project Development Process. ODOT’ PDP A project management and transportation decision-making tool. Developing the detail to the level necessary to make.
Public Involvement. Why? Who Cares? –What we do matters to the public –Effective PI enables proactive input and enhances the decision- making process.
CHAPTER 4 ALTERNATIVES. --- “The driving impetus for conducting environmental impact studies is to comparatively present the effects of proposed alternatives.
Purpose & Need Training How to Write a Better Statement November 12, 2015 FHWA-Ohio Division Presented by: Office of Environmental Services.
Public Involvement How to Plan and Conduct Effectively Presented by the Ohio Department of Transportation’s Office of Environmental Services.
Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.
Developing a Public Involvement Plan Why Develop a PI Plan? PI Plan Format Public Involvement Training Class – Presented by the Office of Environmental.
Traditional Project Development Process ConstructionPlanningNEPA Design ROW CE, EIS, EA Location and Design Concept approval.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
Change Orders on Federal-aid Highway Construction Projects Bren George-Nwabugwu (FHWA) ; (317)
PURPOSE & NEED Categorical Exclusion Training Class.
Airdrie Land Use Bylaw Presentation to City Council May 2, 2016.
Developing a Public Involvement Plan Why Develop a PI Plan? PI Plan Format Public Involvement Training Class – Presented by the Office of Environmental.
Public Involvement How to Plan and Conduct Effectively Presented by the Ohio Department of Transportation’s Office of Environmental Services.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Planning & Community Development Department General Plan Implementation Strategy City Council February 29, 2016.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
All information presented is preliminary and subject to revision I-515 Alternatives Development Study Public Information Meeting March 31, 2016 Welcome.
Purpose & Need Training May 10, 2017
Technical and Public Advisory Committee Meeting #3
Consultation (C) After approval of the EIS, FONSI, or CE designation, the applicant shall consult with the Administration prior to requesting any major.
Purpose & Need Categorical Exclusion Training Class – Presented by the Office of Environmental Services.
Environmental Requirements and planning grants
The National Environmental Policy Act (NEPA)
New Hanover Comprehensive Plan
Presentation transcript:

Developing a Purpose & Need Statement

Objectives  Understand when the P&N is developed in the PDP  Understand the importance of a well- written/well-justified P&N statement  Understand how a P&N is used  Understand the public’s role

What is a Purpose & Need Statement and why do I need it?

Regulations  Council on Environmental Quality 40 CFR – Purpose and Need  Federal Highway Administration 23 CFR (f)

Importance of Purpose & Need A well-written Purpose and Need can be used to justify:  The need for a project  Use of taxpayer’s money  Environmental impacts Used to evaluate alternatives

Importance of Purpose and Need Specific enough so range of alternatives developed offer solutions to the existing transportation problem Not so specific as to “reverse engineer” a solution May reflect other priorities and limitations in the area (i.e., environmental resources, growth, land use, and economic development)

Purpose & Need and ODOT’s PDP

ODOT’s PDP

P&N is developed in the Planning Phase –Scoping Task 1.3.G Refined as the project advances through the Preliminary and Environmental Engineering Phases Considered draft until the environmental document is approved

ODOT’s PDP Five Project Paths Path 1Path 5 Least Complex Most Complex

Purpose and Need  Online CE form has P&N format built in for D level projects (not required on C level projects)  Section in EA and EIS PDP PathEnv. Doc. Level— 2015 CE PA Env. Doc. Level— Previous CE PA Formal P&N Required? Paths 1 & 2 C1 and C2Exempt and CE 1No Path 3D1-D2CE 2 and CE 3Likely Paths 4 & 5 D3, EA, EISCE 4, EA, EISYes ≈ ≈ ≈ ≈ ≈ ≈

Roles ODOT District –Research and prepare P&N Include in consultant’s scope, if necessary –LPAs and consultants must send P&N to district for review and concurrence –Seek local stakeholder concurrence –Ensure consistent quality control

Roles ODOT OES –Advise and assist –Concurrence on D2 projects and above –Concurrence and submittal to FHWA for D3, EA, and EIS projects Will not require FHWA concurrence after NEPA Assignment—Only OES concurrence

Roles Public –Especially on more complex projects (Path 3, Path 4, and Path 5) Provide public an opportunity to comment Input can be used to refine the P&N

Developing a Purpose & Need

Project History Background on existing facility –How the project was initiated/developed Prior investigations/studies –Traffic –Safety –Planning

Purpose Statement States primary objectives to be attained Articulates the intended positive outcomes –An alternative that does not achieve primary purposes would be eliminated Do not include any reference to solutions

What Are Needs? Quantified data obtained through technical analysis that determines if well-defined and supported needs exist –Defines: Existing and future conditions Desired condition

Transportation Needs Mobility Congestion Facility Deficiencies Safety System Linkage Modal Inter-relationship Access

Non-Traditional Needs Emergency Evacuation Economic Development/Growth Environmental Protection National Defense Must have a transportation focus!

Goals & Objectives Optional and discretionary –Out of planning Community perspective, not transportation perspective Consistent with and follows local development plans Considers aesthetic design

Logical Termini Transportation problem begins and ends –State, city, or municipal boundaries are not end points

Independent Utility Establishes independent significance/independence from any other action Distinct from project construction phasing

Alternative Analysis The P&N is used to analyze alternatives –Do proposed alternatives meet the P&N? Do they fix the problem? Can Goals and Objectives be met? –May not be able to fix all of the problems. Things to consider: What needs can be met? Relative importance of meeting those needs? Cost-effectiveness of each alternative versus meeting all needs or addressing Goals and Objectives?

Points to Remember Define existing transportation problem(s) –Measurable, quantifiable data –Identify and quantify needs to the level that logical termini and independent utility can be established P&N is needed to adequately evaluate, eliminate, and advance alternatives Update P&N as appropriate

Project Development Process