Announcements Homework 8 is 11.19, 11.21, 11.26, 11.27, due now

Slides:



Advertisements
Similar presentations
Announcements Be reading Chapter 6.
Advertisements

Announcements Homework 6 is due on Thursday (Oct 18)
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems
The Competitive Effects of Ownership of Financial Transmission Rights in a Deregulated Electricity Industry Manho Joung and Ross Baldick Electrical and.
Ramping and CMSC (Congestion Management Settlement Credit) payments.
EE 369 POWER SYSTEM ANALYSIS
Announcements Be reading Chapter 6. HW 3 is due now.
EE 369 POWER SYSTEM ANALYSIS
Announcements Be reading Chapter 6, also Chapter 2.4 (Network Equations). HW 5 is 2.38, 6.9, 6.18, 6.30, 6.34, 6.38; do by October 6 but does not need.
ECE 333 Renewable Energy Systems Lecture 14: Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
ECE 333 Renewable Energy Systems Lecture 13: Per Unit, Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois.
I/O Curve The IO curve plots fuel input (in MBtu/hr) versus net MW output.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
Announcements Be reading Chapter 3
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
Lecture 16 Economic Dispatch Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Announcements Be reading Chapter 7
Lecture 5 Power System Operation, Transmission Lines Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Effects of the Transmission Network on Electricity Markets © 2011 D. Kirschen and the University of Washington 1.
EE 369 POWER SYSTEM ANALYSIS
EE 369 POWER SYSTEM ANALYSIS
EE369 POWER SYSTEM ANALYSIS
1 Least Cost System Operation: Economic Dispatch 2 Smith College, EGR 325 March 10, 2006.
IMO Market Evolution Program Drew Phillips Market Evolution Program
Optimization for Operation of Power Systems with Performance Guarantee
ECE 476 Power System Analysis Lecture 6: Power System Operations, Transmission Line Parameters Prof. Tom Overbye Dept. of Electrical and Computer Engineering.
Announcements For lectures 8 to 10 please be reading Chapter 3
Announcements Please read Chapter 4 HW 1 is due now
Market Evolution Program Day Ahead Market Project How the DSO Calculates Nodal Prices DAMWG October 20, 2003.
Announcements Homework 7 is 6.46, 6.49, 6.52, 11.19, 11.21, 11.27; due date is Thursday October 30 Potential spring courses: ECE 431 and ECE 398RES (Renewable.
Announcements Please read Chapter 3; start on Chapter 6
Announcements Homework #4 is due now Homework 5 is due on Oct 4
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
ECE 476 Power System Analysis Lecture 11: Ybus, Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
Lecture 13 Newton-Raphson Power Flow Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
ECE 476 Power System Analysis Lecture 17: OPF, Symmetrical Faults Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois.
Lecture 17 Optimal Power Flow, LMPs Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Lecture 11 Power Flow Professor Tom Overbye Special Guest Appearance by Professor Sauer! Department of Electrical and Computer Engineering ECE 476 POWER.
ECE 476 Power System Analysis Lecture 12: Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
ECE 476 Power System Analysis Lecture 14: Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
Lecture 16 Economic Dispatch Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
ECE 476 Power System Analysis Lecture 18: LMP Markets, Symmetrical Faults and Components Prof. Tom Overbye Dept. of Electrical and Computer Engineering.
ECE 476 Power System Analysis Lecture 13: Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
Lecture 19 Fault Analysis, Grounding, Symmetrical Components Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
Lecture 15 Economic Dispatch Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
0 Balanced 3 Phase (  ) Systems A balanced 3 phase (  ) system has three voltage sources with equal magnitude, but with an angle shift of 120  equal.
Lecture 10 Transformers, Load & Generator Models, YBus Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Announcements Please read Chapter 7 HW 6 is due today
Announcements Please read Chapters 7 and 8
Announcements Please read Chapter 6
Reading and Homework For lecture 3 please be reading Chapters 1 and 2
Announcements Homework 7 is due now.
ECE 476 POWER SYSTEM ANALYSIS
ECE 476 POWER SYSTEM ANALYSIS
ECEN 460 Power System Operation and Control
ECEN 460 Power System Operation and Control
ECE 476 POWER SYSTEM ANALYSIS
ECEN 460 Power System Operation and Control
ECE 476 POWER SYSTEM ANALYSIS
ECE 476 POWER SYSTEM ANALYSIS
ECEN 460 Power System Operation and Control
ECEN 460 Power System Operation and Control
ECEN 460 Power System Operation and Control
ECEN 460 Power System Operation and Control
ECEN 460 Power System Operation and Control
ECEN 460 Power System Operation and Control
ECEN 460 Power System Operation and Control
ECEN 460 Power System Operation and Control
ECE 476 POWER SYSTEM ANALYSIS
Presentation transcript:

ECE 476 POWER SYSTEM ANALYSIS Lecture 18 Optimal Power Flow, LMPs Professor Tom Overbye Department of Electrical and Computer Engineering

Announcements Homework 8 is 11.19, 11.21, 11.26, 11.27, due now you do not need to turn it in, but must do it before exam Second exam is Tuesday Nov 13 in class Design Project 2 from the book (page 345 to 348) was due on Nov 15, but I have given you an extension to Nov 29. The Nov 29 date is firm! Be reading Chapter 7

Awards, Scholarships, Articles Grainger Power EngineeringAward forms are due http://www.power.ece.uiuc.edu/Grainger.html Scholarship forms should be turned in ASAP, require a 3.0 minimum GPA Make sure you read the articles at the beginning of the Chapters 11.

Area Supply Curve The area supply curve shows the cost to produce the next MW of electricity, assuming area is economically dispatched Supply curve for thirty bus system

Economic Dispatch - Summary Economic dispatch determines the best way to minimize the current generator operating costs The lambda-iteration method is a good approach for solving the economic dispatch problem generator limits are easily handled penalty factors are used to consider the impact of losses Economic dispatch is not concerned with determining which units to turn on/off (this is the unit commitment problem) Economic dispatch ignores the transmission system limitations

Optimal Power Flow The goal of an optimal power flow (OPF) is to determine the “best” way to instantaneously operate a power system. Usually “best” = minimizing operating cost. OPF considers the impact of the transmission system OPF is used as basis for real-time pricing in major US electricity markets such as MISO and PJM. ECE 476 introduces the OPF problem and provides some demonstrations.

Electricity Markets Over last ten years electricity markets have moved from bilateral contracts between utilities to spot markets (day ahead and real-time). Electricity (MWh) is now being treated as a commodity (like corn, coffee, natural gas) with the size of the market transmission system dependent. Tools of commodity trading are being widely adopted (options, forwards, hedges, swaps).

“Ideal” Power Market Ideal power market is analogous to a lake. Generators supply energy to lake and loads remove energy. Ideal power market has no transmission constraints Single marginal cost associated with enforcing constraint that supply = demand buy from the least cost unit that is not at a limit this price is the marginal cost This solution is identical to the economic dispatch problem solution

Two Bus ED Example

Market Marginal (Incremental) Cost Below are some graphs associated with this two bus system. The graph on left shows the marginal cost for each of the generators. The graph on the right shows the system supply curve, assuming the system is optimally dispatched. Current generator operating point

Real Power Markets Different operating regions impose constraints -- total demand in region must equal total supply Transmission system imposes constraints on the market Marginal costs become localized Requires solution by an optimal power flow

Optimal Power Flow (OPF) OPF functionally combines the power flow with economic dispatch Minimize cost function, such as operating cost, taking into account realistic equality and inequality constraints Equality constraints bus real and reactive power balance generator voltage setpoints area MW interchange

OPF, cont’d Inequality constraints Available Controls transmission line/transformer/interface flow limits generator MW limits generator reactive power capability curves bus voltage magnitudes (not yet implemented in Simulator OPF) Available Controls generator MW outputs transformer taps and phase angles

OPF Solution Methods Non-linear approach using Newton’s method handles marginal losses well, but is relatively slow and has problems determining binding constraints Linear Programming fast and efficient in determining binding constraints, but can have difficulty with marginal losses. used in PowerWorld Simulator

LP OPF Solution Method Solution iterates between solving a full ac power flow solution enforces real/reactive power balance at each bus enforces generator reactive limits system controls are assumed fixed takes into account non-linearities solving a primal LP changes system controls to enforce linearized constraints while minimizing cost

Two Bus with Unconstrained Line With no overloads the OPF matches the economic dispatch Transmission line is not overloaded Marginal cost of supplying power to each bus (locational marginal costs)

Two Bus with Constrained Line With the line loaded to its limit, additional load at Bus A must be supplied locally, causing the marginal costs to diverge.

Three Bus (B3) Example Consider a three bus case (bus 1 is system slack), with all buses connected through 0.1 pu reactance lines, each with a 100 MVA limit Let the generator marginal costs be Bus 1: 10 $ / MWhr; Range = 0 to 400 MW Bus 2: 12 $ / MWhr; Range = 0 to 400 MW Bus 3: 20 $ / MWhr; Range = 0 to 400 MW Assume a single 180 MW load at bus 2

B3 with Line Limits NOT Enforced Line from Bus 1 to Bus 3 is over- loaded; all buses have same marginal cost

B3 with Line Limits Enforced LP OPF redispatches to remove violation. Bus marginal costs are now different.

Verify Bus 3 Marginal Cost One additional MW of load at bus 3 raised total cost by 14 $/hr, as G2 went up by 2 MW and G1 went down by 1MW

Why is bus 3 LMP = $14 /MWh All lines have equal impedance. Power flow in a simple network distributes inversely to impedance of path. For bus 1 to supply 1 MW to bus 3, 2/3 MW would take direct path from 1 to 3, while 1/3 MW would “loop around” from 1 to 2 to 3. Likewise, for bus 2 to supply 1 MW to bus 3, 2/3MW would go from 2 to 3, while 1/3 MW would go from 2 to 1to 3.

Why is bus 3 LMP $ 14 / MWh, cont’d With the line from 1 to 3 limited, no additional power flows are allowed on it. To supply 1 more MW to bus 3 we need Pg1 + Pg2 = 1 MW 2/3 Pg1 + 1/3 Pg2 = 0; (no more flow on 1-3) Solving requires we up Pg2 by 2 MW and drop Pg1 by 1 MW -- a net increase of $14.

Both lines into Bus 3 Congested For bus 3 loads above 200 MW, the load must be supplied locally. Then what if the bus 3 generator opens?

Profit Maximization: 30 Bus Example

Typical Electricity Markets Electricity markets trade a number of different commodities, with MWh being the most important A typical market has two settlement periods: day ahead and real-time Day Ahead: Generators (and possibly loads) submit offers for the next day; OPF is used to determine who gets dispatched based upon forecasted conditions. Results are financially binding Real-time: Modifies the day ahead market based upon real-time conditions.

Payment Generators are not paid their offer, rather they are paid the LMP at their bus, the loads pay the LMP. At the residential/commercial level the LMP costs are usually not passed on directly to the end consumer. Rather, they these consumers typically pay a fixed rate. LMPs may differ across a system due to transmission system “congestion.”

MISO LMP Contours – 11/06/07 LMP at one location was actually negative ($-302/MWh)!

Why not pay as bid? Two options for paying market participants Pay last accepted offer What would be potential advantages/disadvantages of both? Talk about supply and demand curves, scarcity, withholding, market power

Market Experiments