1 Consideration Of Approval Of The Report To The Legislature Regarding The Waste Tire Recycling Management Program Agenda Item 7 Committee Item C May 13,

Slides:



Advertisements
Similar presentations
OUTLINE  Background  Vision  Strategy  Resources  AV Events  Performance Measures OUTLINE  Background  Vision  Strategy  Resources  AV Events.
Advertisements

Zero Waste Operational Plan Policy & Services Committee 3/13/2007.
California Integrated Waste Management Board 1 May 9, 2007 Committee Item N Board Item 23 Consideration Of Grant Awards And Scopes Of Work And Contractors.
California Integrated Waste Management Board 1 Consideration Of Approval Of Allocations For Contract Concepts From The RMDZ Revolving Loan Account For.
FISCAL NOTES 2013 LEGISLATIVE SESSION. OCTOBER 4, What is a Fiscal Note?  Statement of fiscal impact of a legislative proposal. A fiscal note.
 Materials – Highest & Best Use  Public Health  Safety  The Environment  Safety  Reliability  Performance  Flexibility  Productivity Improve Mobility.
Organics Policy Roadmap  Sub-directive 6.1: 50% reduction of organics in waste stream by 2020  Need additional capacity to process 15 million tons per.
Consideration of Contractors for the Engineering Services Contracts for Landfill and Disposal Site Remediation (Solid Waste Disposal Site Cleanup Trust.
California Integrated Waste Management Board 1 Agenda Item 14 Consideration of Streamlining Grant Processes to Enhance Program Efficiency January 17, 2006.
Environmental Quality Restricted Account (EQRA) Path Forward Discussion Bill Sinclair Deputy Director Utah Department of Environmental Quality July 30,
City Council October 21, 2013 Strategic Planning Retreat Next Steps.
Initiating a Zone Designation Cycle in 2006 Committee Item H (Board Agenda Item 17) March 7, 2006.
California Integrated Waste Management Board 1 Waste Tire Manifest System.
California Integrated Waste Management Board 1 Strategic Policy Development Committee Workshop Development of Revised Five- Year Plan For the Waste Tire.
Policy Drivers AB % diversion requirement for jurisdictions AB % reduction, recycling, composting statewide goal by 2020 Not transformation.
Consideration Of The Aggregate Recycling Systems Illegal Disposal Site For The Solid Waste Disposal and Codisposal Site Cleanup Program and Augmentation.
Plastic Trash Bag Program  Report to the Legislature –Originally due October 2001 –Delayed pending results of Plastics White Paper –Report updated to.
RECYCLING IN THE SOUTHEAST: WHAT’S UP WITH OUR NEIGHBORS? Presented by Abby Goldsmith A. Goldsmith Resources, LLC Georgia Recycling Coalition Annual Meeting.
1 E-911 Services Board Meeting General Business Meeting September 8,
Used Oil Competitive Grants’ Cycle Frequency and Funding Levels (Used Oil Recycling Fund, FY 2006/07 and FY 2007/08)
July 2002 Board Meeting: Agenda Item 55 Discussion and Request for Direction on the Board Approved SB 2202 Work Plan Recommendation on Jurisdiction Diversion.
Proposal to Establish the Transportation/Land Use Connection Program Ronald F. Kirby Director of Transportation Planning October 18, 2006 Item 14.
TBAP Business Assistance Industry Trends TBAP Industry-Wide Projects CIWMB Tire-Derived Business Assistance Program ANNUAL REPORT.
Communication Strategy Implementation Outreach and Education Committee November 2003.
2008 California Scrap Tires Market Report August 2009 Copyright © 2009 by R. W. Beck, Inc. All Rights Reserved. California Integrated Waste Management.
1 Status of the Used Oil Recycling Program (Allocation for FY 04/05)
California Integrated Waste Management Board 1 Strategic Policy Development Committee Workshop Discussion of Draft Biennial Update of the Five-Year Plan.
Tire Management Forum & Interested Parties Meeting March 9, 2006 Mitch Delmage, Manager Tire Management Branch California’s Approach to.
Discussion Regarding Changes to the Household Hazardous Waste Grant Program.
COUNCIL FOR COMMUNITY &TECHNICAL COLLEGE EDUCATION POWERS, DUTIES, AND RESPONSIBILITIES.
California Integrated Waste Management Board Tire Flow Study Along the California-Mexico Border Region Special Waste Committee Meeting California Integrated.
Invest in Children Child Care Quality Fund ’FY 14 1.
California Integrated Waste Management Board 1 Consideration Of Applicant Eligibility, Project Eligibility & Evaluation Process for the Tire-Derived Product.
July 18, 2006 Agenda Item 15 Michelle Martin Consideration Of Applicant Eligibility, Project Eligibility & Evaluation Process for the.
11 Cap-and-Trade Auction Proceeds Funding Guidelines for Agencies that Administer California Climate Investments September
Report to the Legislature Required by Senate Bill 2202 (due January 1, 2002) Board Briefing June 13, 2001 Agenda Item 5 Attachment 1.
Recycling – A History & Organics Collection Programs; AB 1826 and AB 1594 presenter: - Kathleen Strickley.
Staff Draft Proposal for Expanding the Statewide Zero Emission Vehicle (ZEV) Incentive Program CALIFORNIA AIR RESOURCES BOARD Public Workshop, December.
Consideration Of Updates And Additional Revisions To Procedures For Conducting Board and Committee Activities Board Item # 2.
1 Comparison of Direct vs. Loan Guarantee RMDZ Direct Loan No leverage factor Prime Rate fixed beginning 11/12/03 Terms of 10 – 15 years Loan Guarantee.
Town of Genoa October 6, Agenda Why are we here? Background Capacity Analysis & Facilities Plan Preferred Alternative Board Direction Implementation.
Santa Barbara Regional RMDZ Renewal Application Agenda Item 1 March 14, 2006.
Department of Public Works Recommended Residential Impact Fee Distribution Methodology Change October 26, 2015.
Proposed Amendments to the AB 32 Cost of Implementation Fee Regulation October 20, 2011.
California Integrated Waste Management Board 1 Consideration of Model Programs and Procedures for the Collection and Proper Disposal of Pharmaceutical.
California Integrated Waste Management Board 1 Grant Awards for the Rubberized Asphalt Concrete Grant Programs (FY 08/09) Pamela Kelley Committee Item.
By: Linda Dickinson Agenda Item 7 May 11, 2004 Tire Product Commercialization and Applied Technologies Grant Awards.
Discussion of Priority Activities for Next Eighteen Months Action Plans.
Energy Efficiency Update Before the Senate Energy, Utilities & Communications Committee Part 2 May 17, 2011 – State Capitol Robin Smutny-Jones Assistant.
Work Related to Senate Bill 2202 (effective January 1, 2001)
California Integrated Waste Management Board Green Material ADC Strategic Policy Development Committee June 10, 2008.
California Integrated Waste Management Board 1 Agenda Item 5 (Committee Item F) June 9, 2008 Agenda Item 5 (Committee Item F) June 9, 2008 Consideration.
Consideration Of Reallocation Of Fiscal Year 2006/07 Funds And Scope Of Work For The Tire Retread Targeted Outreach Materials And Promotional Training.
California Integrated Waste Management Board 1 Consideration Of Reallocation And Of Grant Awards For the Joint Solicitation Of The Used Oil Nonprofit Grant.
Amendments to the Enhanced Fleet Modernization Program Guidelines June 26, 2014Air Resources Board.
ACQUISITION OF REAL PROPERTY LOCATED AT 2110, 2222 AND 2244 SOUTH AIRPORT WAY Stockton Redevelopment Agency October 7, 2008 City Council Agenda Item 6.13.
2025 Plan Implementation Update 15 th Annual Tennessee Environmental Conference Paula Mitchell, Recovered Materials Manager| 3/16/2016.
How To Best Grow the RMDZ Program Committee Item L (Board Agenda Item 17) February 7, 2006.
California Integrated Waste Management Board May 12, 2009 Committee Item D Consideration Of The Adoption Of The Biennial Update Of The Five-Year Plan For.
Planning & Community Development Department General Plan Implementation Strategy City Council February 29, 2016.
Discussion of the 2003 School District Waste Reduction Survey and Findings April 13-14, 2004.
CONTRACT AWARD TO ALTA PLANNING AND DESIGN FOR CONSULTANT SERVICES TO CONDUCT SAFETY OUTREACH AND UPDATE THE SUGGESTED ROUTES TO SCHOOL MAPS FOR THE SAFER.
Fiscal Year 2018/19 Budget.
Proposed Budget Summary
WATER RELATED INFRASTRUCTURE Programs & FUNDING IN KANSAS
Delta Water Supply Project
Finance & Administrative Sub-Committee & Treasurer’s Report
DEVELOPMENT IMPACT FEES AB 1600 UPDATE
Proposed Budget Summary
Presentation transcript:

1 Consideration Of Approval Of The Report To The Legislature Regarding The Waste Tire Recycling Management Program Agenda Item 7 Committee Item C May 13, 2008

2 Background Currently, 26% (11.4 million in 2006) of waste tires generated annually are not diverted into productive end uses. Currently, 26% (11.4 million in 2006) of waste tires generated annually are not diverted into productive end uses. Tire Fund has a large reserve. Tire Fund has a large reserve. The proposed report Options to Increase Waste Tire Diversion Rates: Report to the Legislature addresses these issues. The proposed report Options to Increase Waste Tire Diversion Rates: Report to the Legislature addresses these issues.

3 Diversion Rates Current Diversion Rate:  74% in 2006 Projected Diversion Rate:  83% in 2010

4 Fund Balance Current Fund Balance:  $42 Million Dollars in FY 2008/09* Projected Fund Balance:  $58 Million Dollars in FY 2009/10* *Before $4 Million Dollar transfer to ARB

5 Option 1: Expand Public Education and Outreach on Tire Sustainability/Inflation To reduce amount of tires generated annually, staff suggests three ideas: Expanding current community ed campaign; Expanding current community ed campaign; Partner with ARB on outreach program; and Partner with ARB on outreach program; and Expand outreach to California-based trucking firms regarding retreading. Expand outreach to California-based trucking firms regarding retreading. Staff suggests $1-3 million/year for three years. Staff suggests $1-3 million/year for three years.

6 Option 2: Establish New Equipment Loan Program New equipment loan program to provide appropriate low-interest loans, consistent with existing RMDZ Loan Program - Loans to businesses for new equipment with preference for TDA-related equipment. - Loans would be available anywhere in state. – Staff suggests $3-5 million/year for three years.

7 Option 3: Increase Tire-Derived Aggregate (TDA)/Civil Engineering (CE) Efforts Increase level of support to contracts and interagency agreements that provide technical assistance and construction management; Increase level of support to contracts and interagency agreements that provide technical assistance and construction management; Research new applications; and Research new applications; and Implement new CE/TDA Application Grant Program. Implement new CE/TDA Application Grant Program. Staff suggests $5-7 million for first two years and $3-5 million for following two years. Also suggest revising PRC Section to require Cal- Trans to include in its annual report the number of CA generated waste tires used in its projects each year.

8 Option 4: Refocus and Expand Rubberized Asphalt Concrete (RAC) Grant Programs Combine solicitation of RAC Grant Programs. Combine solicitation of RAC Grant Programs. Create several levels of funding within program. Create several levels of funding within program. RAC grant program would establish cooperative purchasing option for rural jurisdictions. RAC grant program would establish cooperative purchasing option for rural jurisdictions. Staff suggest $1-2 million/year for three years. Staff suggest $1-2 million/year for three years.

9 Option 5: Expand TDP Grant Program This is a very popular program that is oversubscribed each year. Staff suggests providing an additional $1-3 million/year for three years.

10 Other Considerations Continue to examine modifying the current tire storage requirements. Continue to examine modifying the current tire storage requirements. Suggest amending PRC Section to require ARB to conduct testing of emissions from facilities when tires are being incinerated and compare with emissions using other types of materials. Suggest amending PRC Section to require ARB to conduct testing of emissions from facilities when tires are being incinerated and compare with emissions using other types of materials.

11 Summary of Potential Options and Costs OPTIONS Year 1 FY 09/10 Year 2 FY 10/11 Year 3 FY 11/12 Year 4 FY 12/13 1. Expanding Public Education and Outreach on Tire Sustainability $1-3M $0 2. Establish New Equipment Loan Program $3-5M $0 3. Expanded Civil Engineering/TDA Efforts $5-7M $3-5M 4. Refocus and Expand RAC Grants$1-2M $0 5. Expand or Shift TDP Grants$1-3M $0 TOTAL DOLLARS$11-20M $3-5M

12 Implications for Fund and Fee Three scenarios using the midpoint funding of these ranges were created:  If all 5 options were implemented, then expending $48.5 million would have negative balance of $895,000 in FY 2014/15.  If fee was reduced by $0.25 beginning in 2011 and none of 5 options were implemented, Fund would have approximately $5.1 million remaining in FY 2014/15.  If all 5 options were implemented and fee reduced by $0.25 beginning in 2011, Fund would have negative balance of $38.4 million in FY 2014/15.

13 Adoption of Report Staff request the Board approve the proposed report Options to Increase Waste Tire Diversion Rates: Report to the Legislature, Attachment 1, and Adopt Resolution Number