Naval Network & Space Operations Command (NNSOC) Christopher Ankeny Lighting/Electrical Option Senior Thesis 2007 Advisor: Dr. Richard Mistrick Electrical.

Slides:



Advertisements
Similar presentations
THE AUGUST WILSON CENTER FOR AFRICAN AMERICAN CULTURE PITTSBURGH, PENNSYLVANIA MICHAEL P. ROYER PERKINS + WILL Schematic Design Presentation.
Advertisements

The Franklin Care Center Addition and Renovation Franklin Lakes, New Jersey Jennifer Curley Lighting/Electrical Option Faculty Advisor: Dr. Moeck.
Hall Corporate Headquarters Dan Rusnack Tuesday April 13 th, 2004 Lighting/Electrical Emphasis Thesis Presentation Thesis Presentation.
Stephanie Deckard | Final Thesis Presentation | Lighting/Electrical Princeton Theological Seminary Library Princeton, NJ EwingCole.
Lighting Techniques and Technology Practical Applications Britnei Godusky LC, LEED AP BD+C June 4, 2014AOBA / Current Trends in Sustainability.
CNBC Global Headquarters Lighting Design by: Christine Cajilig Lighting/Electrical Advisor: Dr. Mistrick.
Pennsylvania State Employees Credit Union Corporate Headquarters Senior Thesis Presentation | lighting / electrical | Sarah Wujcik | | Dr Houser.
Landon Roberts Lighting/Electrical Option 11/01/07 Medical Education Building Johns Hopkins University School of Medicine Electrical Systems Existing Conditions.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
Cathedral Place Milwaukee, Wisconsin Steven Puchek Final Thesis Presentation Lighting / Electrical Emphasis 10 April 2006.
Newseum and Freedom Forum Headquarters Washington, D.C. Ryan Wise Lighting/Electrical Option Consultants: Dr. Mistrick ; Prof. Dannerth April 15, 2009.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Ballenger East Building Final Presentation Design Development Architectural Engineering Senior Thesis Presentation 2009 Lighting / Electrical Option Student.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
Thesis Presentation April 13, 2004
Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA
Schematic Design Proposal Dan Rusnack 11/14/03 Lighting/Electrical option Thesis project The Hall Corporate Headquarters.
William H. Gates Hall University of Washington School of Law Katie Jenkins The Pennsylvania State University Architectural Engineering Lighting/Electrical.
Boston University ∙ Arena and Recreation Center 2007 Senior Thesis Alexis M. Kreft Advisor: Dr. Mistrick Architectural Engineering Lighting and Electrical.
UNIVERSITY OF MARYLAND – BALTIMORE HEALTH SCIENCES FACILITY III SENIOR THESIS PRESENTATION KENNETH M. MOORE LIGHTING / ELECTRICAL THESIS ADVISOR │ SHAWN.
The New RLPS Architects Office Building Lancaster, PA Brice Ohl – Mechanical Option Presented on 4/10/13.
JOHN PAUL JONES ARENA CHARLOTTESVILLE, VIRGINIA JOHN PAUL JONES ARENA CHARLOTTESVILLE, VIRGINIA FINAL DESIGN PRESENTATION LOGAN BROWN LIGHTING/ELECTRICAL.
Background Design Concept Gallery Lecture Hall (acoustics) Meeting Room Conclusions The Bahen Centre for Information Technology Spring 2003 Senior Thesis.
Leah Matern Lighting/Electrical Option Faculty Advisors: Dr. Richard Mistrick and Ted Dannerth April 13, 2011 Crystal Lake Elementary School Lake Mary,
Lutron Thesis ProposalCorron Cultural CenterSara Lappano Sara Lappano, EIT, LC-Intern Lighting/Electrical Option.
The Dubois Educational Foundation Workforce Development & Technology Building Josh Lutton Lighting/Electrical Option.
Army National Guard Readiness Center Arlington, VA Arne Kvinnesland Construction Management AE Senior Thesis Final Presentation, Spring 2010 The Pennsylvania.
CNBC GLOBAL HEADQUARTERS
Howard County General Hospital
Arlington National Cemetery Renovation Show Building Overview Picture My name Date.
Dansko Phase III West Grove, PA David Rosenberger Lighting/Electrical Lighting Advisor: Dr. Mistrick Electrical Advisor: Ted Dannerth.
Newseum and Freedom Forum Headquarters Washington, D.C. Ryan Wise Lighting/Electrical Option Consultant: Dr. Mistrick Dec. 14, 2007.
Building Overview Lighting Depth & Electrical Depth – Redesign -Streetscape -Gallery -Flex Use Space -Laboratory Architectural Breadth– Southern façade.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
University of Maryland’s Gossett Field House College Park, MD Jason Borowski Architectural Engineering Mechanical Option Pennsylvania State University.
The Sunshine Elementary School Redesign Proposal Pennsylvania State University AE Senior Thesis Nicholas Scheib Mechanical Option- IP.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
CSE Renovation Project Boston, MA Xiaoyin Wu (Laura) Lighting/Electrical | Architectural Engineering | Penn State University.
Dorrance H. Hamilton Building
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
The School Of Forest Resources Building University Park, Pennsylvania Chris Hoyman The Pennsylvania State University Architectural Engineering Lighting/Electrical.
The National Research and Training Institute for the Blind Allison Brown Lighting/ Electrical Option April 17 th, 2003.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Alternative Energy Evaluation May06-16 Team Members: Steve ChebuharEE Anhtuan DinhEE Ryan FerneauCprE Justin JorgensenEE Client : Professor Ralph Patterson.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
BUILDING: LOCATION: SIZE: OCCUPANT: ARCHITECT: ENGINEERS: St. Francis Friary Hanceville, Alabama 59,900 square feet, 2 floors above grade Archdiocese.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
HALF MOONE CRUISE & CELEBRATION CENTER Jonathan Walker Lighting / Electrical Option 4/15/09 Introduction | Lighting | Mechanical | Structural| Electrical.
North Hills Junior High School Pittsburgh, PA Senior Thesis Final Presentation 2005 Chris Rush Lighting / Electrical Faculty Consultant: Dr. Mistrick.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
Newseum and Freedom Forum Headquarters Washington, D.C. Ryan Wise Lighting/Electrical Option Consultant: Dr. Mistrick Dec. 14, 2007.
J. david maino the pennsylvania state university architectural engineering lighting/electrical.
Building Lighting Controls
New Castle Center for Delaware Hospice, Inc Zachary Klixbull Penn State University – Architectural Engineering Mechanical Option Advisor: Professor Bahnfleth.
Smart Room Control- The Smart Addition of Lighting and Shade Control
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
Philip Mackey The Pennsylvania State University Architectural Engineering L/E Option HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Holy.
Harris Theater for Music and Dance Chicago, IL Lindsey K. Beane Lighting/Electrical AE Senior Thesis 2006.
Villanova University: School of Law Jason Greer The Pennsylvania State University Architectural Engineering Lighting/Electrical Option Senior Thesis –
North Hall | American University| Washington D.C.
DuBois Regional Medical Center West Wing Addition
ENVIROCENTER PHASE II JESSUP, MD
Advisor: Professor M. Kevin Parfitt
SHEPHERD UNIVERSITY WELLNESS CENTER
Senior Thesis Presentation
Architectural Engineering, The Pennsylvania State University
Presentation transcript:

Naval Network & Space Operations Command (NNSOC) Christopher Ankeny Lighting/Electrical Option Senior Thesis 2007 Advisor: Dr. Richard Mistrick Electrical Consultant: Mr. Ted Dannerth Dahlgren, VA

Background Picture and drawings courtesy of Kling in Washington D.C. Location:Size:Cost:Occupant:Function: Naval Surface Warfare Center Dahlgren Division, Dahlgren, VA 75,000 s.f., 2 Stories $17,000,000Navy Mixed Use, Office, with some assembly (training theater) Building Overview NNSOC Architecture and Engineering: Construction Management: Deliverable: Kling, D.C. Skanska Corp., MD Design-Build Architecture: “The primary mission of the NNSOC is to provide a secure, flexible, high quality work environment for researchers and administrative personnel in a building that is an efficient, economical asset for the base.”

Outline Outdoor/Entrance: Lobby: Training Theater: Office: 1 st Floor Plan 2 st Floor Plan NNSOC N N

Lighting Depth: Outdoor/Entrance Design Goals  Provide enough light for egress  Have good contrast between highlighted areas and background Building sign Anchor Flagpole Introduction Design Concept  Highlight the anchor, flag, and building sign  Provide design that acknowledges our Navy and Nation NNSOC

NNSOC Lighting Depth: Outdoor/Entrance Layout

NNSOC Elevation

NNSOC Renderings

NNSOC Renderings Summary  Highlighted the flag, anchor and sign  Provided transition into lobby area  Power Density in (W/s.f.) is:  0.17 for walkway (ASHRAE 90.1 < 0.20)  0.56 for Entrance (ASHRAE 90.1 < 1.25) OK

NNSOC Lighting Depth: Outdoor/Entrance Performance

Outline Outdoor/Entrance: Lobby: Training Theater: Office: 1 st Floor Plan 2 st Floor Plan NNSOC N N

NNSOC Lighting Depth: Open Office Introduction Design Goals  Provide about 30 fc of light from the ambient system and 50 fc from the task lighting  Use 4100K CCT to try and match daylight Design Concept  Add in skylights for better daylight integration  Provide ambient and task lighting  Use a photosensor to control dimmable ambient fixtures  Have manual shades on west and south windows to limit direct sunlight penetration Skylight Detail

NNSOC Lighting Depth: Open Office North Layout

NNSOC Lighting Depth: Open Office South Layout

NNSOC Lighting Depth: Open Office Control System Controls  The photosensor controls all the suspended luminaires along the west side of the office, dimming them as appropriate  Override switches are available at the door entrances  Base SCADA system controls on/off with timers

NNSOC Lighting Depth: Open Office North Layout

NNSOC Lighting Depth: Open Office North Elevation

NNSOC Lighting Depth: Open Office Renderings

NNSOC Renderings Summary  Additional daylight provided in the space  Provided ambient lighting around 30 fc on the workplane  Provided greater than 50 fc on the workplane with the task luminaires  Power Density in (W/s.f.) is 0.81 (ASHRAE 90.1 = 1.1) OK

NNSOC Lighting Depth: Open Office Performance

Outline Outdoor/Entrance: Lobby: Training Theater: Office: 1 st Floor Plan 2 st Floor Plan NNSOC N N

NNSOC Electrical Depth: UPS Design Introduction Existing Static UPS system  Double-ended switchgear, each side can power entire building (1 utility comes in for each)  Two 625kVA UPS systems, each can power entire UPS load  Batteries are rated for 30 minutes of emergency power for each UPS module  Two standby generators, each can power entire UPS load Two static UPS modules Two 30 minute battery banks Two existing generators Double-Ended Switchgear

NNSOC Electrical Depth: UPS Design Redesign Proposed Solution  Use a rotary UPS system  Uses a flywheel to produce 13 seconds of emergency power  Generator at full power within 10 seconds Problem  Existing battery room for the static UPS system takes up a lot of space (1300s.f.)  Batteries need a lot of maintenance and completely changed out every 5 years  Room needs extra conditioning to operate batteries at correct temperature  Environmental concerns Replace static UPS modules with rotary UPS modules

NNSOC Electrical Depth: UPS Design Space Savings *Entire battery room (1300s.f.) becomes usable space if rotary system is used Existing Static System with Batteries Proposed Rotary System Usable Space Battery Room

NNSOC Electrical Depth: UPS Design General UPS System Comparison UPS Systems  600kVA rotary system  900kVA rotary system  750kVA static system with 7 minutes of battery backup

NNSOC Electrical Depth: UPS Design 10 Year Life Cycle Analysis Summary  Both rotary systems are slightly more expensive in first cost installations  Both rotary systems having a lower life cycle cost than the static system  I would recommend either rotary system for easier maintenance, less space for equipment, cheaper long term costs, and more environmentally friendly

Outline Outdoor/Entrance: Lobby: Training Theater: Office: 1 st Floor Plan 2 st Floor Plan NNSOC N N

NNSOC Mechanical Breadth: Skylight affects on HVAC Introduction HVAC system  The additional skylights in the office area change the load requirements of the HVAC system  The goal is to reduce the lighting needs enough to offset the cost of the additional HVAC loads  A comparison of the lighting energy saved vs. the HVAC energy used will be the basis of the comparison Clear day, June 21, 1pm Clear day, March 21, 1pm Clear day, Dec. 21, 1pm Daylight Study

NNSOC Mechanical Breadth: Skylight affects on HVAC Analysis Analysis  Made E-Quest model  Use SPOT program to find savings from dimming system Assumptions  Cost of electricity = $0.10/kwh  Cost of energy = $0.50/Therm  Analysis does not include cost of skylights or dimming equipment Summary  The addition of skylights and a dimming system to the office area save energy each year but probably not enough to pay for the extra equipment for dimming and skylights.  I would still recommend some type of skylight and dimming system for the 2 nd floor open office area.

Outline Lighting Overview  Lobby  Training theater Lighting Depth  Outdoor/Entrance  Open Office Electrical Depth  Uninterruptible Power System (UPS)  Photovoltaic Analysis* Mechanical Breadth Construction Management Breadth* Conclusion Outdoor/Entrance: Lobby: Training Theater: Office: 1 st Floor Plan 2 st Floor Plan *Topics not covered in presentation NNSOC N N

NNSOCConclusionsLighting  I believe my design met with the architectural design intent of a flexible, efficient, high quality work environment. Electrical Depth  The UPS rotary system I feel is a good choice instead of a static UPS system because it saves money in the long run, is easier to maintain, friendlier on the environment and takes up less floor space. Mechanical Breadth  The skylight addition in the office may cost more, but occupancy comfort and productivity are increased when quality daylight integration occurs. I would recommend some daylight integration within the open office areas.

NNSOCAcknowledgements THANKS TO: AE Faculty Dr. Mistrick Ted Dannerth Professionals John Turner, Diane Evans of Kling in Washington D.C. Brian Guthrie of the NAVFAC Washington Phil Hollern of Renmark Inc. Tom Baker of Cleveland Brothers Eq. Co., Inc. Personal Family AE class of 2007

NNSOC????Questions?