2 nd BERCEN exchange program – Veliko Tarnovo (Bulgaria) - April, 8 th to 12 th, 2003 – DPPR/SEI/BARPI -- 1 - SYNOPSIS  A few data on the Inspectorate.

Slides:



Advertisements
Similar presentations
WP4 – 4.1 and 4.2 Preparatory activities for the creation of the WATERMODE permanent network 1 Technical Committee Meeting Venice, June 24-25, 2010 VENETO.
Advertisements

Accident and Incident Investigation
Background Presenters Work done in preparation for WHS changes
Implementation of the Seveso II Directive 96/82/EC Institutional Strengthening of the Slovak Environmental Agency Emergency Response Principles and Practice.
Enforcement of the Seveso II Directive Enforcement of the Seveso II Directive.
11 th International Symposium Loss Prevention and Process Safety Promotion in the Process Industries 1 OECD Workshop on Sharing Experience in the Training.
1 A new training course for Engineers in Lyon : « Prevention and management of risk in the territory » A way forward ‘’excellence’’ ?
CURRENT STATUS OF TRANSPORT OF DANGEROUS GOODS IN LAS MEMBER STATES AND REGIONAL PROMOTION OF ADR AS A TRUE INTERNATIONAL AGREEMENT 3 rd IRU-LAS-AULT SEMINAR.
Republic of Serbia Road Traffic Safety Agency RTSA – Belgrade.
Japan’s Efforts to Ensure Safety of Railways October 12th, 2010 Railway Bureau MLIT.
“How Industry Learns” --- Proposed Project --- Karen Paulk, ConocoPhillips, Chair, Process Safety Group & Ron Chittim, API CRE Chairs & Sponsors Workshop.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
National Workshop on Labour Inspection and Undeclared Work Budapest, October 2009 Collaboration between the GLI EA and Other National Bodies to Address.
The evaluation of research units at HCERES
Ministère de l'Écologie, du Développement durable, et de l'Énergie Ageing plan in France Programme for the prevention.
Organisational `Safety Stressors` and their Relationship to Severe Accidents and Incidents Occurring within the UK Construction Industry. Organisational.
Report on the current legal structure and resources available to the environmental protection agencies and inspectorates in Croatia 1st BERCEN Exchange.
1 International Working Forum on Regulatory Supervision of Legacy Sites (RSLS) Technical Meeting Amel MELLOUK – ASN / DRC Jérémie VALLET – MEDDE/MSNR Regulatory.
TRP Chapter Chapter 3.3 Enforcement. TRP Chapter Enforcement ENFORCEMENT LEGISLATION SUPPORT SERVICES FACILITIES Enforcement is one of the.
2 nd BERCEN exchange program for the environmental enforcement agencies and inspectorates April , 2003 Veliko Tarnovo, Bulgaria Authors:Anita Pokrovac.
Johan Gort, Teamleader Safety TNO & Ministry of VROM Implementation of Seveso II in new EU member states.
Worker Focused Safety Program Violence in the Workplace Worker Training Module 5.
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
MINIMUM CRITERIA Project Manager Marianne Lindström, Bulgaria SYKE, Expert Services, Environmental Management Division.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Risk Management NDS Forum June 23 rd Example safety objective Objective 1: To protect the health, safety & welfare of employees and people at our.
MODU Safety Committee Objective The objective of this Procedure is to establish the terms of reference for the Safety Committee on board the MODU.
Romanian experience and lessons learnt implementing SEVESO Directive Francisc Senzaconi Magdalena Duta Ghergut.
Greek experience on the enforcement of Product Safety legislation Community safety legislation and current situation in Greece.
PERFORMANCE OF VETERINARY STATUTORY BODIES CURRENT SITUATION AND EVOLUTION IN BRAZIL.
Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic.
Bratislava april Preparation of an inspection plan: The Dutch approach Theo de Gelder Senior Inspector Regional Inspectorate South-West Dutch Ministry.
1 ASPECTS REGARDING PLANNING AND REPORTING RELATED TO RECOMMENDATION 331/2001/EC ON MINIMUM CRITERIA FOR ENVIRONMENTAL INSPECTION AND ITS IMPLEMENTATION.
SEVESO II transposition and implementation – possible approaches and lessons learned from MS/NMS SEVESO II transposition and implementation – possible.
REGULATORY PERSPECTIVE ON USING OPERATIONAL EXPERIENCE Thomas E. Murley Former Director of Nuclear Reactor Regulation USNRC Conference on Improving Nuclear.
PERMIT ISSUANCE SYSTEM IN CROATIA ENVIRONMENTAL REVIEW Authors: Jasna Paladin-Popović Iva Milić Štrkalj Renata Sinovčević Brijuni, 27 November /21/02Croatia.
Fukushima Lessons Learnt and Follow-up Activities of Rostechnadzor Alexey Ferapontov, Acting Chairman Second European Nuclear Safety Conference
Strengths and weaknesses of the permitting system and enforcement process in RIEW – Veliko Turnovo Regional Inspectorate of Environment and Water - Veliko.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
Recommendation of the European Parliament and of the Council of 4 April 2001 providing for Minimum Criteria for Environmental Inspections in the Member.
Workers Comp Overview & Accident Investigations
How to start with the implementation of IPPC Directive Czech Republic Czech Environmetal Inspectorate.
Proposal COM (2010) 395 final: Concrete recommendations from the health and safety perspective Stefano Boy, Engineer Paolo Derosas, Lawyer European Trade.
1 Short overview of the implementation of IPPC, LCP, Seveso II, Waste Landfill and Incineration directives Short overview of the implementation of IPPC,
“EU Directive Seveso II, 96/82/EC Notification 2.3 Activity workshop Angeliki Tsatsou Dritsa Chemist, TA Key Expert 2 Zagreb June 2011.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Inspection and enforcement approach Pavel Šremer Vedoucí projektu.
CROATIA Country Report IPPC Directive: implementation, problems, constraints, open questions,… Anita Pokrovac Patekar, B. Sc. Pharm. Ministry of Environmental.
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
Practice of HOF regulatory oversight E.G. Kudryavtsev Department of Safety Regulation of Nuclear Fuel Cycle Facilities, Marine Nuclear Power Installations.
Achievements in IPPC Directive Implementation: problems and constraints Albania Ministry of Environment 3 rd BERCEN Exchange Programme for the Environmental.
Monitoring, review and audit.
SEVESO II transposition and implementation: Possible approaches and lessons learned from member states and new member states SEVESO II transposition and.
ADVISORY ROLE OF THE LABOUR INSPECTORATE Borut Brezovar, MSc, Chief Labour Inspector of the RS.
1. 1.To examine the information included in business reports. 2.To understand how to organize documents in order to ensure clear communication. 3.To analyze.
Health & Safety Management “and a few other things for your consideration”
Measuring and Reviewing Performance
Cryogenic safety organisation at CERN
Country Presentation on National Reporting System – Croatia
SOURCE PROJECTORS FOR INDUSTRIAL GAMMA RADIOGRAPHY IN FRANCE
The Administrative Control of Industrial/Chemical Parks in Germany
Accidents and learning from accidents Group 2
Nick Bonvoisin Secretary to the Convention on the
State of play of French progress in cost-effectiveness analysis
Presentation for the Equinet Seminar on Tackling discrimination and protection for carers in Europe The Greek Labor Inspectorate and its cooperation with.
Challenges of Inspectors in Lessons Learned Reporting
ICS Staff One person is responsible for overall ICS and can delegate the responsibilities so that for each procedure or task of the ICS, one person is.
Proposal for a workshop on monitoring EURO-INBO 2013
THE NATIONAL INSPECTION CAMPAIGN IN AGRICULTURE Republic of Moldova
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

2 nd BERCEN exchange program – Veliko Tarnovo (Bulgaria) - April, 8 th to 12 th, 2003 – DPPR/SEI/BARPI SYNOPSIS  A few data on the Inspectorate in France  A few data on the Barpi’s missions  How experience feedback is organised :  relationships Inspectorate /Barpi  Barpi’s database  resulting “products”  Examples of use for the Inspectorate  Conclusions

2 nd BERCEN exchange program – Veliko Tarnovo (Bulgaria) - April, 8 th to 12 th, 2003 – DPPR/SEI/BARPI Organisation of the INPECTORATE  Several levels exist :  National level (ministry and its services, directions,…)  Local level : Regional : DRIRE in region but also with its representatives in each « department » Departmental : other services just like DSV (Direction of veterinary services)

2 nd BERCEN exchange program – Veliko Tarnovo (Bulgaria) - April, 8 th to 12 th, 2003 – DPPR/SEI/BARPI Inspectorate : Main missions  Draw up proposals to the “prefectorial” authority (department)  Proposal of licenses for the operators/ evolution of the acts (modifications,…), up-dates resulting from safety reports, …  Proposals of administrative / penal sanctions  Carry out inspections  Answer to public questions or claims  Deal with different files (among which technical and administrative inquiries after acc/incidents)

2 nd BERCEN exchange program – Veliko Tarnovo (Bulgaria) - April, 8 th to 12 th, 2003 – DPPR/SEI/BARPI Main figures Different status possible for the sites  Out of classification or under the threshold  “declaration”  “authorization”  “authorization” with easements / Seveso status About 1230 (among which 650 high- threshold sites » About (among which breedings, 1090 waste-plants, 6000 quarries) About

2 nd BERCEN exchange program – Veliko Tarnovo (Bulgaria) - April, 8 th to 12 th, 2003 – DPPR/SEI/BARPI BARPI (bureau for analysis of industrial risk and pollutions)  Bureau belonging to the Ministry in charge of environment questions, working for the department for pollution and risk prevention (DPPR), more precisely for Industrial environment Service (SEI)  Objective : experience feedback in connection with industrial pollutions and accidents.  Location : in Lyon

2 nd BERCEN exchange program – Veliko Tarnovo (Bulgaria) - April, 8 th to 12 th, 2003 – DPPR/SEI/BARPI BARPI  Missions :  gathering and analysis of data concerning pollutions, accidents, incidents, near misses in classified installations  Data and analysis spreading  Forming a technical support for both other MEDD bureaus and local inspectorate.

2 nd BERCEN exchange program – Veliko Tarnovo (Bulgaria) - April, 8 th to 12 th, 2003 – DPPR/SEI/BARPI Relationships between the inspectorate and BARPI Inspectorate  Barpi source of information on accidents/incidents Barpi  Inspectorate Restitution of “products”(analysis on significant accidents, tendencies on samples of selected accidents, restitution of lists of accidents on a special topic,…) Inspectorate  Barpi Frequent exchanges (website, training tuition, consultation every 2 months, conference on accidents,…)

2 nd BERCEN exchange program – Veliko Tarnovo (Bulgaria) - April, 8 th to 12 th, 2003 – DPPR/SEI/BARPI

2 nd BERCEN exchange program – Veliko Tarnovo (Bulgaria) - April, 8 th to 12 th, 2003 – DPPR/SEI/BARPI ARIA DATABASE  ARIA : Analysis, Research and Information on Accidents  Up to the 31 st of December 2002 : accidents  For 2002 : about 1700 accidents  Various kinds of accidents: - major and serious accidents - significant accidents - incidents or near misses (if possible lesson to learn)  Different fields : - chemistry - transports - Refineries, ….

2 nd BERCEN exchange program – Veliko Tarnovo (Bulgaria) - April, 8 th to 12 th, 2003 – DPPR/SEI/BARPI Method used Analysis based on :  many accidents (samples)  tendencies (concerning an activity, a special topic)  one particular accident  exemplary solutions...leading to lessons learnt or to learn

2 nd BERCEN exchange program – Veliko Tarnovo (Bulgaria) - April, 8 th to 12 th, 2003 – DPPR/SEI/BARPI Information recipients

2 nd BERCEN exchange program – Veliko Tarnovo (Bulgaria) - April, 8 th to 12 th, 2003 – DPPR/SEI/BARPI Resulting “products”  Studies on particular topics  several ones : rubbish incineration plants, pipes transports,handling goods machines, ammonia, chorine, metal treatment process, silos  Answers to direct questions (asked by different organisms : inspectorate, other administrations, private companies,  more than 1200 in 2002).  An inventory drawn up every year.

2 nd BERCEN exchange program – Veliko Tarnovo (Bulgaria) - April, 8 th to 12 th, 2003 – DPPR/SEI/BARPI Resulting “products”  Short summaries about significant accidents : e.g. IMPEL document following the  lessons learnt from accidents  meeting.  Articles published in technical magazines.  Courses given to school of engineers.  Barpi’s website : most of the data are available Address :

2 nd BERCEN exchange program – Veliko Tarnovo (Bulgaria) - April, 8 th to 12 th, 2003 – DPPR/SEI/BARPI Example : Possible uses for the inspectorate  After an acc/incident occurred  favourable circumstance to discuss with the operator:  Ask for analysis; actions taken or to take for the future (prevention, mitigation); up-date of the monitoring documents listing accidents or incidents,…  If Seveso, worth checking if the organisation implemented works

2 nd BERCEN exchange program – Veliko Tarnovo (Bulgaria) - April, 8 th to 12 th, 2003 – DPPR/SEI/BARPI Possible uses for the inspectorate  Useful : all these pieces of information might be restored in the frame of the procedures leading to license  Lessons learnt from the accidents that occurred in the past (on the site or on similar units)  in the files drawn up by the operator, with the relevant analysis  Interesting : The same can be done during inspections  check what had been implemented on the site, actually.  Have a glance on what had been made for situations that could be similar.

2 nd BERCEN exchange program – Veliko Tarnovo (Bulgaria) - April, 8 th to 12 th, 2003 – DPPR/SEI/BARPI Possible actions for the operators In/accidents : monitoring, analysis, implementation of corrective actions Up-date of the safety reports (files, third-party ’s analysis, …) Inspections sur site Vérification mise en place mesures correctives ou améliorations Check of the actions implementation

2 nd BERCEN exchange program – Veliko Tarnovo (Bulgaria) - April, 8 th to 12 th, 2003 – DPPR/SEI/BARPI Possible lever and synergy for the inspectorate In/accidents (Exam of the « registers » : Lists, analysis, actions taken) Exam of the safety reports (files, Third-party ’s reports, …) Inspections sur site Inspections on the site

2 nd BERCEN exchange program – Veliko Tarnovo (Bulgaria) - April, 8 th to 12 th, 2003 – DPPR/SEI/BARPI But… difficulties : For the operators  Communication on accidents is difficult for companies  “image”  Economic impacts  And for workers either  Possible penalties  Regard  Incite communication out of crisis (before)  Put the incidents in perspective (using gravity scale)  Development of safety culture  Restitution and publication of exp. Feedback  Improvement of internal communication

2 nd BERCEN exchange program – Veliko Tarnovo (Bulgaria) - April, 8 th to 12 th, 2003 – DPPR/SEI/BARPI But… difficulties : for the inspectorate  Gathering information needs time and means  …an everyday attention and efforts from all  But is rich in knowledge :  consequences (model)  Technical aspects  Organisational aspects  Analysis of causes (leading to experience feedback).  Development of relationships with trade bodies  based on facts  inciting exchanges even for incidents (“cold” situation)  Exam of action actually taken on the sites after measures planned (event)  Development of inspectorate means and competence

2 nd BERCEN exchange program – Veliko Tarnovo (Bulgaria) - April, 8 th to 12 th, 2003 – DPPR/SEI/BARPI THE END Thank you for your attention