Graham Generation and the Market – The Facts October 8, 2008.

Slides:



Advertisements
Similar presentations
MISO Day 2: A Transmission Users (Marketers) Perspective Leon White August 8, 2007.
Advertisements

SCED Power Balance Penalty Curve
Critique of Proposal to Designate SAPS-Shrew as CRE Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) June 4, 2009.
Wind Farm Curtailment Logic. Golden Spread Panhandle Wind Ranch Golden Spread Panhandle Wind Ranch (GS PWR) – 78.2 MW – 34 Turbines – Located just East.
Electrical Billing and Rates MAE406 Energy Conservation in Industry Stephen Terry.
EE535: Renewable Energy: Systems, Technology & Economics Energy Storage.
Energy Retreat Institute for Sustainability, Energy, and Environment May 8, 2014.
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
Utah Schedule 37 Update June 25, Schedule 37 Background Schedule 37 – Published rates for standard power purchase agreements with qualifying facilities.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Ludington Pumped Storage Plant and Wind Power Operational Considerations David Lapinski Consumers Energy Company June 16, 2009.
ERCOT 2003 UFE ANALYSIS By William Boswell & Carl Raish AEIC Load Research Conference July 13, 2005.
ERCOT Tool to manage unexpected incremental load November 16, 2006.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
©2004 PJM 1 STATE OF THE MARKET REPORT 2003 Joseph E. Bowring Manager PJM Market Monitoring Unit FERC Briefing Washington, D.C. April 14, 2004.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
Distributed Generation Registration Threshold Protocols Section 16.5 (5) ERCOT Staff DER Workshop June 18, ERCOT Public.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
Updated Cost/Benefit Analysis for PRR Part A/S Bidding Proposed Methodology.
Mitigated Offer Cap Presented to: NATF Date: September 29, 2009 By: Mark Patterson, Manager Market Operations Support (ERCOT) 1September 29 NATF Meeting.
UFE 2003 Analysis June 1, UFE 2003 ANALYSIS Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation June 1, 2005.
West to North CSC Location Scenario 3b WMS August 20, 2008.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
UFE 2005 Analysis 1 UFE 2005 ANALYSIS Compiled by Load Profiling ERCOT Energy Analysis & Aggregation.
©2005 PJM 1 STATE OF THE MARKET REPORT 2004 Joseph E. Bowring Market Monitor FERC Briefing April 13, 2005.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
1 ERCOT Wholesale Settlement Module 3. 2 BENA iq = -1 * (Σ (RI iz + LI iz + URC iz + MISD iz + MISR iz ) z + TCRPAY Bei + Σ CSC Bei ) * LRS iq Can you.
Evaluation of Historical and Proposed Alert and EECP Pricing True North Associates 1.
QMWG 10/7/13 Generation Resource Energy and Regulation Deployment Performance.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
2016 Long-Term Load Forecast
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
Updated Cost/Benefit Analysis for PRR 567 Multi-Part A/S Bidding PRS January Meeting January 19, 2006.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
2003 State of the Market Report ERCOT Wholesale Electricity Markets.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
2010 CSC & Zone Selection: 6 Lines W-N & 4 Zones (WN2_SN0-4Z) Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) August 19,
ERCOT Monthly Operational Overview (July 2012) August 15, 2012.
NPRR 617 Overview and Justifications. Overview Current protocols place restrictions on Day-Ahead Three-Part Supply Offers – Part 1 (Startup Offer) – capped.
PRR525 SCE Method Comparison ERCOT Compliance December 3, 2004.
COPS – ERCOT PROJECTS UPDATE WHOLESALE MARKET DEVELOPMENT Paula Feuerbacher October 20, 2004.
RPRS Settlement Examples Market Support Services March 30, 2005 March 14, 2006 Presented by ERCOT Art Deller Bill Kettlewell.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Operations Update ERCOT Board Meeting March 18, 2003.
© ERCOT and 2004 Fleet Deployment and Settlements WMS Meeting August 19, 2004 Ino Gonzalez ERCOT Settlements
ERCOT Monthly Operational Overview (January 2015) ERCOT Public February 15, 2015.
Operations Update Kent Saathoff TAC Meeting March 6, 2003.
INTEGRATING WIND ENERGY WITH ELECTRIC SYSTEMS ERIC HIRST Consultant in Electric-Industry Restructuring Bellingham, WA December.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
September 23, 2011 Report On ERCOT Action Items From September 6, 2011 RTDF Meeting John Dumas ERCOT.
RDTF June 1, Purpose “The effect of the Shadow Price cap for the Power Balance Constraint is to limit the cost calculated by the SCED optimization.
2004 CSCs & Zones. Goals for 2004 Increase ERCOT market efficiency Reduce out-of-merit energy and capacity deployments Reduce uplift of local congestion.
Wind Production intermittency Cross border compensation: what to expect in Western Europe? Analysis of Winter 2010/2011 Hubert Flocard and Jean-Pierre.
Future Ancillary Services Cost Benefit Analysis Overview Julia Matevosyan February 1, 2016 FAS Workshop.
CMWG Update to WMS Met 4/24 & 5/11 Continued Work on PRR 801 –Discussed outages as related to TCR Cases –ERCOT evaluates various outage combinations.
Report to TAC June In Brief Working Group Reports Working Group Reports CMWG CMWG MCWG MCWG QMWG QMWG VCWG VCWG Other Reports Other Reports NOGRR.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
Day Ahead Market QSE’s Credit Requirements Concerns and Solutions August 14, 2008.
General Overview Of Resource Costs
RTDF Overview of Data Analysis & Status of “Consesus Items”
MRES Resource Operations in SPP
Context Corporate presentation Elia Group | 2015.
Presentation transcript:

Graham Generation and the Market – The Facts October 8, 2008

Graham Vitals  Graham 1 –in service 1960 –225 MW capability –Full Load Average Heat Rate =  Graham 2 –in service 1969 –375 MW capability –Full Load Average Heat Rate = Graham plant is not a low heat rate – high capacity factor facility

Capacity Factors for 12 months ended Sept  Graham (West)8.6%  Lake Hubbard (North)9.4%  North Zone Fleet6.1% Graham plant is a similar technology to Lake Hubbard. Neither plant is a high capacity factor facility, since they aren’t competitive with new CCGTs

West - North Congestion: May through Sept 2008  West – North congestion occurred during 8.9% of the intervals during this period  Wind production during W-N congestion intervals was: –Max – 4,480 MW –Avg – 3,323 MW –Min – 1,148 MW  The 90th percentile of wind production during W-N congestion intervals (i.e. wind production exceeded this value 90% of the time) was 2,454 MW. West to North CSC congestion wasn’t that prevalent during the summer and when it occurred, quite a bit of wind production was occurring.

Graham in West Zone: May through Sept 2008  How correlated is W-N congestion associated with high wind and material amounts of Graham output? –Conservatively using 90 th percentile wind of 2,454 MW –How often were either of these units >> min when BES below 9.5 mmBtu/MWh? Graham #1 –LSL = 46 MW –% of intervals > 70 MW = 0.1% Graham #2 –LSL = 37 MW –% of intervals > 60 MW = 0.9% Graham plant very rarely runs above min when: W-N congestion, high wind, and low BES prices. Regulation deployments explain most of this.

North Zone and Wind: May through Sept 2008  How correlated is W-N congestion associated with high wind and NZ MCPE above 9.5 mmBtu/MWh? –This should be a proxy for concerns raised by FPL Energy  How often was wind >= 2,454 MW & MCPE >= 9.5 mmBtu/MWh –Only 1.5% of the intervals The market conditions where Graham being deployed for BES during high wind and W-N congestion are negligible in both the West and North zone

Average MCPE at $74,000,000 OOME Down Payments …  131 hours above 9.5 mmBtu/MWh  517 MW back down of Graham 1 and hours * 517 MW = 67,727 MWh 9.5 mmBtu/MWh * $7/mmBtu + $74,000,000/ 67,727 MWh = $ /MWh In past 12 months, BES prices were greater than or equal to $650.72/MWh concurrently with W-N congestion only 6 hours Historical data doesn’t seem to support the assertion of $74,000,000 of OOME