Price Correction Process Resmi Surendran QMWG 04/10/2015.

Slides:



Advertisements
Similar presentations
Information Technology Report Dave Pagliai Manager, IT Support Services March 2015 ERCOT Public.
Advertisements

Lead from the front Texas Nodal 1 EDS 3 Release 5 and 6 Friday Market Updates Aug 08, 2008.
ERCOT Nodal Protocols Telemetry Requirements Proposal
CMWG Update June WMS Meeting CMWG Update 1. CMWG (Vote) Confirmation of new Vice Chair: Greg Thurnher (Representing Luminant/TXU Energy) 2.
SBBH Flag Implementation QMWG October 11, SBBH Flag - Background SBBH Flag - Background: –The SBBH acronym stands for “SCED Base Point Below HDL”
October 22, 2007 TPTF Meeting Early Delivery Systems Status Update and Forecast Daryl Cote/John Webb/John Hall.
Lead from the front Texas Nodal Version EDS 3 R6.3 8 Focused Input Test (FIT) II Web Ex Texas Nodal Load Frequency Control.
August 16, 2007 EDS Workshop Texas Nodal Market Implementation MMS FAT Testing for Accelerated SCED Mark Patterson, Manager Market Operations Support.
December 2, 2011 QMWG Summary of Potential Issues with NPRR385 Price Floor ERCOT.
Lead from the front Texas Nodal 1 EDS 3 Release 5: SCED Phase 1 Testing Aug 14, 2007.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates November 30, 2007.
1 Market Trials Open Market Participant Call Weekly Kick Off Sept 27, 2010.
1 Nodal Stabilization Market Call December 14, 2010.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
NPRR385, Security Violation Analysis and Reporting and Negative Price Floor WMS Meeting February 15, 2012.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
1 ERCOT Nodal Protocols Telemetry Requirements. 2 Protocol References Telemetry TAC will establish TASK force and approve a telemetry criteria.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
ERCOT SCR745 Update ERCOT Outage Evaluation Phase 1 and Phase 2 TDTWG April 2, 2008.
1Texas Nodal Market Trials Update. 2Texas Nodal LFC Testing Review Review of materials presented at TAC Changes in Market Trials schedule and activities.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
1 Cutover Market Call December 01, :30 AM.
ERCOT Project Update ERCOT Outage Evaluation Phase 2 (SCR745) TDTWG May 7, 2008.
CSWG/RCWG 05/11/2012 Price Validation and Correction Resmi Surendran Manager, Market Analysis.
10/11/2011 COPS Schedule for Upcoming Resettlements ERCOT Mandy Bauld.
1 Market Trials Real-Time Market / LFC Weekly Update April 9, 2010.
January 15, 2008 Monthly Board of Directors Meeting Texas Nodal Market Implementation Program Update Jerry Sullivan.
1 Market Trials Update NATF June 1, 2010.
MISUG Meeting Materials ERCOT 02/14/ Agenda 02/14/ Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionJ. Lavas9:35 a.m Accomplishments.
EDS 2 Early Delivery Systems Release 3 – WebEx Conference July 10, 2007.
1 Market Trials Open Market Participant Call Weekly Kick Off March 01, 2010.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF - November 6 th, 2006.
Retail Transaction Processing Year End Review and Recent Issues RMS January 2007.
January 21, 2008 TPTF 168 Hour Test Initial Approach Discussion.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
July 10, 2008 ROS Early Delivery Systems Status – R6.3 2 Hour Test John Dumas and Jeff Gilbertson.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
GTBD Forecasting Using SCED to Produce Projections of Future LMPs Floyd J. Trefny February 17, 2011.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
N ODAL P ROGRAM U PDATE TO C OPS Jim Galvin.
Lead from the front Texas Nodal 1 Texas Nodal EDS 3 Early Delivery System Plan TPTF April 02, 2007.
1 Readiness Scorecard – May ‘10 NATF Brandon McElfresh Nodal Readiness and Transition May 4, 2010.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates Feb 01, 2008.
1 Market Trials Update NATF May 4, 2010.
Scheduling and Operating Transmission Devices in the Nodal Environment.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
Cutover Update NATF 2 November Today’s Agenda Reminders Program Status 24 Hour LFC Test Update Cutover Update Soft Launch 2 November 2010NATF.
1 Nodal Stabilization Market Call December 27, 2010.
TAC December 3, 2009 Meeting Update 1. TX Nodal Implementation 2 PhaseWhenScopeStatus 2.1: Market Connectivity MILESTONE COMPLETE Oct. 28MP interface.
1 Nodal Stabilization Market Call December 16, 2010.
Retail Workshop ERCOT Nodal Update October 06, 2010.
Lead from the front Texas Nodal 1 Early Delivery System Testing Environments & Planning – Involving Market Participants TPTF May.
NPRR 520 Resmi Surendran ERCOT. Current CCT Process Annual CCT (ACCT) is run every year to feed the results to Monthly CCT (MCCT) MCCT is run every month.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Phase 1 Testing Monday / Friday Market Updates September 26, 2007.
Nodal Settlement Status and Observations Jim Galvin, SEWG Chair.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
1 Market Trials Update NATF January 5, 2010.
 Software reliability is the probability that software will work properly in a specified environment and for a given amount of time. Using the following.
EDS 3 Release 5 SCED Testing Update - TPTF Daryl Cote August 28, 2007.
Market Continuity WMS June 8, PUBLIC What is Market Continuity? The processes by which ERCOT market-related systems and activities are returned.
August 11, 2008 TPTF Early Delivery Systems Status Daryl Cote.
QSE Managers Working Group October 12, 2010 Base Point Deviation Issues – Short Term and Long Term Solutions Nodal Settlement & Billing Group.
Re-Execution of the February ’16 Monthly CRR Auction David Maggio & Mark Ruane Technical Advisory Committee January 28 th, 2016.
August 11, 2008 TPTF EDS Sequence and Durations Discussion Daryl Cote.
“Look Ahead SCED” Sai Moorty ERCOT November 28, 2011.
Market Trials Update NATF March 2,
Market Trials Open Market Participant Call
Principles of Participation in Real-Time Co-optimization
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
Presentation transcript:

Price Correction Process Resmi Surendran QMWG 04/10/2015

Real-Time Price Correction Protocol Real-Time Price Correction Timeline – ERCOT could correct Real-Time Price until 1600 of the second Business Day after the Operating Day, – ERCOT BOD could approve Real-Time Price Correction if ERCOT has notified MPs within 30 days after the Operating Day. SCED failure – When SCED fails to complete execution, hold the SCED LMP from last good SCED Correct Prices – When SCED solution is invalid – Specific Prices are invalid in a otherwise valid solution – Correct RTRMPR when BPs received are inconsistent with SCED BPs

Scenarios Requiring Price Correction  Input data error o Stale/incorrect/incomplete inputs like offers, gen parameters, de-energized buses list, RLC data etc  Output data error o Stale/Incorrect/incomplete data transfer like Base Points not being telemetered to Market Participants, SCED solution not published to SPP calculation module etc  Software error o Memory leaks o Implementation defects in processes like mitigation, offer extension, SPP calculation etc  Infrastructure failure o Un-planned outages (Systems, Applications, Databases, ICCP telemetry) o Planned outages (Site failovers, Software releases)

Price Correction Methodology 1.SCED results are valid in general but few prices have issue – Use the SCED solution and correct the prices which have issues Ex: Incorrect heuristic rule, Logical CC price calculation issue etc 2.SCED results are valid in general but SPP calculation has issue – Recalculate SPP using the valid SCED solution 3.SCED results are valid but not published and hence SPP is based on previous interval price – Recalculate SPP using the unpublished valid SCED LMP

Price Correction Methodology 4.SCED results are valid but EBP is set – 15-minute RTRMPR (meter price) is a LMP, time and BP weighted and hence is recalculated using EBP weighting – 15-minute RTSPP is just LMP and time weighted and hence not corrected if SCED LMPs are correct 5.SCED results are invalid due to incorrect input or SCED software error – Rerun the SCED using the correct input or with fixed SCED software and calculate the correct prices 6.SCED is not running – SCED failure – Use the last good SCED LMP until next good SCED LMP

Price Correction Statistics Price correction events till date : – SCED – 62 ( 27 if we ignore 2011 & 2010) – DAM – 26 (5 if we ignore 2011 & 2010) Corrected SPPs - 0.1% in SCED and 0.06% in DAM Prices corrected up – 46.5% in SCED and 61% in DAM

March 30th Hardware failure on a server at 6:13 AM caused SCED to fail SCED came back at 6:39 AM

March 30th

3/30/2015 6:42 am