1 LBT Q3 2008 Eng/SW Review PWR: Site electrical power.

Slides:



Advertisements
Similar presentations
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
Advertisements

Engineer Training Supply Unit TJ8300 / TJ8500 Supply Unit.
VARIABLE SPEED DRIVES HARMONIC EFFECTS & EFFECT OF USE WITH LONG CABLES (100 – 300m) Electric Motors & Drives ….OUR VISION, YOUR SOLUTION ……. TOGETHER.
Modular Capacity - Test - System CS
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
1 LBT Q Eng/SW Review SHTR: Shutters. 2 Highlights (Q1/2009) Shutters have been working well, generally Shutters have been working well, generally.
AB 11 22 33 44 55 66 77 88 99 10  20  19  18  17  16  15  14  13  12  11  21  22  23  24  25  26  27  28.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
Graphic Symbol Location 1. DIN Terminal X52 The machine is powered by electricity using copper cable with 5 wires (3 phase wires + neutral wire +
© Emotron AB Protection against damage and downtime Emotron M20 Shaft Power Monitor.
Engineer Training Electrical Cabinet (EC) TJ8300 / TJ8500 Electrical Cabinet (EC)
Phase IV Presentation Group 7 Thomas Kudej Marko Sutovic Timothy Smith.
Transmitting Electricity
TRIAC Dimmable Ac-Dc LED Drivers VLED 15 Series. © 2012 CUI Inc Introduction Purpose To provide an overview of the VLED15 Ac-Dc LED power supply and its.
Three – Phase Power System. Three-Phase Power Definitions 4 wires –3 “active” phases, A, B, C –1 “ground”, or “neutral” Color Code –Phase ARed –Phase.
7/11/01Steven Hays E/E Support Page 1 NuMI Beam line Power Supplies  The supplies in the line is detailed  Main Ring Style…………………..…1  PEI/Transrex.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
AC backup solutions for business continuity. Secure your business, Stay on!
PPS 3.3 C Portable Power Source Page 1 January 2011.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
© The McGraw-Hill Companies, Inc McGraw-Hill 1 PRINCIPLES AND APPLICATIONS OF ELECTRICAL ENGINEERING THIRD EDITION G I O R G I O R I Z Z O N I 7.
PS3500 Power and Diagnostics Powering Availability.
Page 1 March 2007 CheckSource 2.3 Portable Power Phantom Load.
LBT Q Engineering Review MCSC Mount Control System.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
Airmar H2183 Heading Sensor
LBT Q Eng/SW Review TEL – TELEMETRY Tony Edgin.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
Engineer Training UV Electrical Cabinet (1-15) TJ8300 / TJ8500 UV Electrical Cabinet (Machines 1-15)
1 LBT Q Eng/SW Review PVM: Preventive Maintenance.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
1 LBT Q Eng/SW Review ICS – Instrument Cooling System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
Substation L1/ Booster Substation Y-BE2 Update #3 August 15,2012.
PR570 POWERITE II TRAINING Dedicated to Success in Electronic Servicing for 50 Years.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
1 LBT Q Eng/SW Review PWR: Site electrical power.
E.Sbrissa EP/TA3 - IC ATLAS EDR_MAG Magnet Project Fault analysis, QA & Failure rate.
PRO-H Power Supplies. PRO-H Series  P owerful R eliable O ptimized - H azardous Areas  Complete family of Power Supplies 1-phase 3.8A up to 25A  Output.
Portable Power Station University of Wyoming Electrical and Computer Department EE Done By Mohammad S. Almoallem Mahmood S. Almoallem Advised.
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
Transmission Losses Physical System Operations. Transmission Losses NERC’s definition(s): Electric System Losses Total electric energy losses in the electric.
INSTApower Compact Power Supplies. INSTA POWER INSTA POWER – Primary switch-mode power supplies The trend in the range of power supplies goes more and.
1 LBT Q Eng/SW Review PSPI: PEPSI installation preparation.
Electricity is produced at the power station.
PTS 3.3 C Portable Test System.
EPR = Electronic Products and Relays
Three-Phase Power.
EIB Power Supply, 160 mA SV/S
What is a transformer? iron core secondary coil primary coil
CECOM LAR Tropo Operation Course
Presentation transcript:

1 LBT Q Eng/SW Review PWR: Site electrical power

2 Highlights (Q3/2008) Installed power to PEPSI container on 3L Installed power to PEPSI container on 3L Have experienced low voltage from MGIO, when reported to MGIO, they immediately adjusted the generator output Have experienced low voltage from MGIO, when reported to MGIO, they immediately adjusted the generator output Our 208 VAC 3 phase power transformers are a little low Our 208 VAC 3 phase power transformers are a little low Continue monitoring power quality Continue monitoring power quality MGIO now have the PMH-9 setup properly, power failures will decrease significantly MGIO now have the PMH-9 setup properly, power failures will decrease significantly

3 Open Issues Technical Technical UPS power to MCS cabinet and E-stop network UPS power to MCS cabinet and E-stop network 4160 VAC to level 4, ph a-b 4193, ph b-c 4211, ph c-a VAC to level 4, ph a-b 4193, ph b-c 4211, ph c-a VAC to level 1, ph a-b 4207, ph b-c 4207, ph c-a VAC to level 1, ph a-b 4207, ph b-c 4207, ph c-a VAC level 1, ph a-b 479, ph b-c 484, ph c-a VAC level 1, ph a-b 479, ph b-c 484, ph c-a VAC level 4, ph a-b 478, ph b-c 480, ph c-a VAC level 4, ph a-b 478, ph b-c 480, ph c-a VAC level 1, ph a-b 205, ph b-c 205, ph c-a VAC level 1, ph a-b 205, ph b-c 205, ph c-a VAC level 4, ph a-b 206.8, ph b-c 206.8, ph c-a VAC level 4, ph a-b 206.8, ph b-c 206.8, ph c-a VAC at CP, ph a-b 206, ph b-c 206, ph c-a VAC at CP, ph a-b 206, ph b-c 206, ph c-a 207 Schedule Schedule UPS power to MCS UPS power to MCS Financial Financial Will have to purchase cable and supplies Will have to purchase cable and supplies Resource Resource None None

4 Planning (Q4/2008) Determine where UPS power for PEPSI at bridge location comes from Determine where UPS power for PEPSI at bridge location comes from Continue monitoring power quality Continue monitoring power quality Continue to install UPS power for MCS 24 VDC supplies Continue to install UPS power for MCS 24 VDC supplies