(link between hazard controls and activities)

Slides:



Advertisements
Similar presentations
Hazard and Risk Analysis What are the socio-economic and political trends? Consider recent assessment / reviews / baseline studies / analytical exercises.
Advertisements

1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Module N° 4 – ICAO SSP framework
LO3 – Recruiting, developing and supporting staff.
Emergency Preparedness and Response
Behavior Based Safety The following slides provide an example of a (basic) Behavior Based HSE Observation Program Note: the Safety Plus card used as an.
[Organisation’s Title] Environmental Management System
Learning from a recent incident
ISO 9001 : 2000.
Hazard Analysis Ensuring Safe food. Hazard Analysis.
Corrective & Preventive Action Programme l Corrective and preventive action managed by one programme l Closely linked to the internal audit programme l.
ENVIRONMENTAL MANAGEMENT SYSTEMS. ENVIRONMENTAL ISSUES Global Warming Climate Change Ozone Layer Resource Depletion Population Growth Waste Disposal Effects.
Laboratory Personnel Dr/Ehsan Moahmen Rizk.
HSE for Supervisors HEMP Module
Quality Management.
1 Assuring the Quality of your COSF Data. 2 What factors work to improve the quality of your data? What factors work to lessen the quality of your data?
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
OHSAS 18001: Occupational health and safety management systems - Specification Karen Lawrence.
Applying a Systems Approach EPA Regions 9 & 10 and The Federal Network for Sustainability.
SAFETY MANAGEMENT SYSTEM BASIC
BS EN ISO 14001:2004 Madlen King BSc MSc MIEMA EMS Lead Assessor Lloyd’s Register Quality Assurance Ltd BS EN ISO 14001:2004.
Presentation on Integrating Management Systems
1 Introducing BSI Health & Safety Self-assessment Online.
???? HSE MS Audit ??? 2001 SIEP EP-HSE.
Risk Assessment – An Essential Standard
Introduction to Quality, Cost & Delivery
Hazard Identification
Honeywell Aerospace Management System Approach HSEMS Overview & SBG Governance 14-Jan-2014 Gregory A. Bopp, CHMM Director, HSE&F Compliance Assurance Honeywell.
Risk Management Report to Audit Committee 26 September 2006 Lee Harris Assistant Chief Executive.
Implementation of ISO 14001/OHSAS TMS Consultancy Ltd.
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Introduction Research indicates benefits to companies who establish effective worker safety and health programs: –Reduction in the extent and severity.
Scenario Based Auditing
RTI, MUMBAI/DAY 3/SESS 2/ SLIDE Basic concepts of EMS, EIA, ISO What is Environment Surroundings in which an organisation operates, including.
Barriers in Improving HSE Culture
Health and Safety Policy
Risk Management NDS Forum June 23 rd Example safety objective Objective 1: To protect the health, safety & welfare of employees and people at our.
Hazards Identification and Risk Assessment
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
“What are my hazards?” 1 “What happens when the hazard is released?” “What happens when control is lost?” 2 “What causes the hazard to be released?” “How.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
Example Incident Mgmt Initiation No recording of Incidents Users can approach different departments Solutions of previous incidents are not available.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
A Guide for Management. Overview Benefits of entity-level controls Nature of entity-level controls Types of entity-level controls, control objectives,
HSE Plan meeting - November – Health, Safety & Environmental Plan 2015.
Remodelling COMAH \\ Changing the way we regulate major hazards Sarah Shore Programme Manager the Competent Authority.
TESTING THE NEW SYSTEM Various Approaches to Testing.
1 SUSTAINING THE ELECTRICAL INDUSTRY WITH A STRUCTURED HSE MS.
ISM Code 2010: Part A - Implementation Malcolm Maclachlan.
Project Specific Safe Work Plan Team Engagement Starts HERE!
Disaster Preparedness Are you prepared?. Effective Disaster Plans  Your plan should outline the basic preparedness steps needed to handle the anticipated.
OHSAS Occupational health and safety management system.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Risk Assessment Techniques
Occupational Safety & Health: Management System (OSH-MS)
HSE Procedure for Risk Assessment Document Number: KOC.SA.018
Pipeline Safety Management Systems
What is HSE Competence Assurance?
Bowtie Analysis – An Effective Risk Management
HSE Case: Risk Based Approach.
Continuity of Operations Plan/Continuity of Government (COOP/COG)
Shell Upstream HSE Case, Managing Risk Glen Worobets
Integrated Management System
Chemical Facilities Vulnerability Assessment
Security Management Definition: security is a proactive measure taken protect , prevent and safeguard both human material resources. Objectives of security.
Fertilizer Industry Safety Information Analysis and Sharing Program
Risk Management NDS Forum June 23rd 2010.
CR-GR-HSE-414 HSE Requirements for Pipeline Operations
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Management commitment and responsibility Safety accountability of managers Appointment of key safety personnel SMS Implementation Plan Coordination.
Presentation transcript:

(link between hazard controls and activities) Hazard and Effects Management Process HEMP (link between hazard controls and activities)

Why is activity analysis required? The HSE-MS ensures that all HSE critical activities are carried out properly through: provision of resources an adequate organisation allocating responsibilities assurance of competencies proper training and communication documentation of procedures feedback, corrective action, continuous improvement

Early Identification of Potential Hazards HAZID Early Identification of Potential Hazards Gentlemen (TIM) then (Brian) Tim - Within SPDC and indeed within SHELL Gas & Power there is a Requirement to complete certain key activities relates to planning. This planning more importantly is what is termed the Hazard & Effects Management Process, you may have heard of HEMP. The activities are included in a set sequence which follows the course of the Project namely: Concept & Detailed Design and following this we have Construction. At this stage we are required to ensure that we have all the hazards identified and more importantly controls to manage the risk to People/Assets/Environment and Reputation. This is what we will do over the next 1 to 2 days. This is to be ASSURED that HSE objectives are being met in the construction phase. Brian – We have seen in the early part of the preparation works that we have not been totally prepared for the activities in terms of HSE. We have witnessed a number of near misses. This is a signal that we have to be more professional in our approach to the daily activities. Above all it demonstrates how we need to plan for the up and coming construction activities beyond that of piling…….

Why Use HAZID? Benefits: Application Full recognition of HSE Specific Hazards within the project Put HSE hazards & threats in an inventory Application Effective for Greenfield developments Compliments EIA and HRA

Required Terms Hazard – potential to cause harm/illness/damage Threat – causes which could lead to the release of a Hazard upon the target, person/asset/Environment/reputation Incidents – injury,illness,damage

ACTIVITIES/tasks PROVIDE CONTROLS - for BARRIERS AND RECOVERY MEASURES Bow Tie CONSEQUENCE RECOVERY HAZARD THREAT BARRIER HAZARDOUS EVENT ACTIVITIES/tasks PROVIDE CONTROLS - for BARRIERS AND RECOVERY MEASURES

Activity - Hazard Relationships BARRIERS RECOVERY PREPAREDNESS MEASURES CONSEQUENCES THREAT HAZARD TOP EVENT Who has the responsibility for the Control? Engineering Maintenance Operations

HAZID Process Identify Activities Identify Hazards within the activities Guidewords to assist (Threats & Causes) Assess Controls What Barriers are Required to prevent or control the effect?

Prioritisation & recording Simple priority rating (RAM) Recording on the HAZID Worksheet Leading to Hazard & Effects Register Building the HSE case Summary = The Output: identification of major hazards and threats assessment of the influence the hazards may have on the project initial statement on hazard manageability and assurance needs