Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, 2010 - Status of the Anti construction test and schedule. -Status.

Slides:



Advertisements
Similar presentations
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
Advertisements

CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 25 May 2011 Overall.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Leaf Spring prototype preparation M.Lenti. Reminder Piet’s proposal: two dowels inserted into two mirror holes (vertical alignment); mirror weight as.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
LAV construction status Matthew Moulson (Frascati) NA62 Photon-Veto Working Group Meeting CERN, 27 May 2009.
Challenges and Overview From Technical Coordination 27/08/2013 -FH1.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH September 19th 2008 VST Meeting1.
EE planning meeting Lucie Linssen 1 CERN EE regional centre and Dee assembly plans Dee assembly TA3, not for EE Supercrystal regional centre.
STATUS OF THE MEG CRYOSTAT Construction status Schedule ____________________________________________________________ 04/Agust/06 F. Raffaelli, L. Delfrate.
15 October 2013 CHANTI Status Report F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino Università.
RPC production at GT (status and plans). Status After the IFR meeting in Rome a new version of the Production Plan have been proposed to GT Main requirements.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Thermosiphon Project - Condenser repair CERN – Geneva January 8 th, 2014 M. Battistin & all TS team ATLAS + EN/CV.
Compressor status AWAKE Technical Board meeting 19 August 2015.
WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.
The RPC Closed loop Gas System Slides from Bianco and Guida.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 23 May 2012 Notes on A8 transport 2 ShockLog malfunction: fresh batteries consumed.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 17 July 2012 LAV construction & installation status.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
Lav meeting F. Raffaelli INFN – Sezione di Pisa C. Capoccia LNF, A. Cecchetti INFN – Sezione di Frascati CERN, Dec13 th, Feet friction studies. -Installation.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
GROUPAMA Football Stadium, Budapest Design and other engineering work for the precast concrete structure Precast solution of the structure (splitting.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
ATLAS Pixel Detector July 2003 SC Pixel Meeting N. Hartman LBNL 1 Pixel Support Tube WBS Santa Cruz Cost Workshop July 9, 2003.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 4 June 2013 LAV construction & installation status.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.
Meeting at Chooz PMTs Mechanical support on the Buffer. Updates. Enrique Calvo Alamillo
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
01 June 2011F. Raffaelli1 Super B Mechanical integration. List of reference persons and institutions for the mechanic of the sub detectors. Review of the.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 5 January 2013 LAV construction & installation status.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
“CENTRAL SUPPORT FRAME” -
NA62 LAV Anti1 REMOVAL & TESTS
CSP 25th November 2010 Technical agreement number 3: overview
BSS Prep work at CERN and Acceptance of Parts
INSTALLATION SEQUENCE
Diffuser status October 2017
Far Detector Activities Late 2017 – Early 2018
10/month is the present production rate 2 FTE + sporadic contributions
Preparations for test of
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Presentation transcript:

Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status of drawings of Anti Status of the tender Anti Conclusions

2 F. Raffaelli - 14/07/2010 Status of Anti production test and scheule. The actual Anti production is referring to a delivery of Four Vacuum tube and accessories. A detailed list of components and accessories is reported in the tender documentation. This include: tooling for handling, rotating structure, covers, sliding ring, etc. The construction is based on a solid Fabrication and Control step Plan that allows us to control the quality during the fabrication process. Aldo Cecchetti from LNF is weekly controlling the Anti construction at the company collecting the documentation. We received from him a weekly report of on the construction status. A delivered of Anti included a detailed documentation ( drawing as Built, materials certificated, welding procedures, reports on the tolerances measurement, mechanical test, photographic documentation, etc).

3 F. Raffaelli - 14/07/2010 Status of Anti production test and scheule. Anti2, Anti3, Anti4 and Anti5 are the delivered elements. Anti2 will leave Frascati the 9 th of August and is going to be at CERN the 10 th of August Anti3 and the rotation stand are finished at the company (Fantini). The delivery to Frascati has to be managed for our convenience. Anti4 will be at Frascati the 15/09/2010, most of the component are ready. The cylinder is almost finish, Man hole ISO K630 and all flange F200 are ready Anti5 will be delivered at Frascati the 25/10/2010, some parts are alredy prepared for welding.

4 F. Raffaelli - 14/07/2010 Status of Anti production test and scheule. Anti 2: Arrived at Frascati 25/5/2010

5 F. Raffaelli - 14/07/2010 Status of Anti production test and scheule. Anti 3 after the final machining delivered date 19/07/2010 Rotation stand Feet

6 F. Raffaelli - 14/07/2010 Status of Anti production test and scheule. Anti 4 Cylinder assembled and parts ready; delivery date 15/09/2010

7 F. Raffaelli - 14/07/2010 Status of Anti production test and scheule. Anti 5: Parts ready for welding delivery date 25/11/2010 Cylinder plate with the ends machined for welding

8 F. Raffaelli - 14/07/2010 Status of Drawings A sets of drawing of the Anti and , covers, feet, sliding ring and lifting beam were produced considering a geometry with 240 lead crystals for a total weight of 6000 Kg. The detector geometry was revisited recently. Cesidio design the feet, the lifting bar, checking the compatibly with rotation stand. The drawing of Anti 12 is not analyzed yet.

9 F. Raffaelli - 14/07/2010 Geometry envelope Anti 6-7-8

10 F. Raffaelli - 19/04/2010 Geometry envelope Anti

11 F. Raffaelli - 14/07/2010 Tender drawing for Anti 6-7-8

12 F. Raffaelli - 14/07/2010 Tender drawing for Anti

13 F. Raffaelli - 14/07/2010 Status of LAV design Cesidio proposed: to make the man hole at 40 0 with an offset respect to the center to avoid problem with the cable length and have a better access inside the Anti volume.

14 F. Raffaelli - 14/07/2010 Lifting Bar

15 F. Raffaelli - 14/07/2010 Feet

16 F. Raffaelli - 24/03/2010 Rotating stand checks

17 F. Raffaelli - 14/07/2010 Steps for tender procedure Anti The approval for the tender has just arrived. We will invite companies to answer to the tender enquire at the end of July. The final date to present the answer to the tender is the 7 th of September. After a board will be official nominated by INFN. This board is going to examine the offers and decide the winner. The official winner will be communicated to the Central INFN administration in the middle of September. The INFN central administration has to control the company eligibility for the tender. We hope that in the middle of November the order will be place at the company. Be optimistic the construction will take eight months. In July we could have all four Anti.

18 F. Raffaelli - 14/07/2010 Conclusions - The delivery at CERN of anti2,3,4,5 should finish at the end of The design of the Anti is almost finish, only minor details and checks must be done. -We can make the tender for Anti and Anti 11, including sliding rings and covers in August, expecting to place the order in the middle of November. -The construction times (eight months) reported could be optimist because is based on the last construction that was tested before with the construction of Anti1. -The same consideration must be done for the banana production and all other tools that are different for the previous one. Some time to setup a new tooling and structure will make up to spend some time. -The strategy to respect the schedule for the delivery the Anti6-8 and 11 (July 2011) is to start early with the prototype of the new parts and mounting tooling. -It will be not easy to manage all the activities including the reworking of Anti0, that can happen after the delivery of Anti5 at CERN.