Industrial Control Activities Forecast Philippe Gayet on behalf of EN-ICE.

Slides:



Advertisements
Similar presentations
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Advertisements

ALICE DCS Workshop Day 10th September The Cooling and Ventilation Control System D. Blanc, Process Control Team and Project Leader CERN ST/CV-Design.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
TE / CRG / Paulo Gomes The Control System for the LHC tunnel cryogenics, p. 1 CERN Portuguese Teachers Programme, 7 Sep 2011 Dr. Paulo Gomes on behalf.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
LabVIEW Basic I with RADE introduction A. Raimondo (EN/ICE)
European Organization for Nuclear Research PLC services Jerónimo Ortolá, Jacky Brahy EN-ICE Workshop 23 April 2009.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Lukasz ZwalinskiLHCb CO 2 cooling; 1 IBL CO 2 cooling control system Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Michal Zimny,
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
TE-MPE-TM 09/08/2012, TE-MPE-MS section WIC: Overview of on-going projects + Outlook to LS1 activities: - Short introduction to WIC systems - Booster renovation.
Clara Gaspar, November 2012 Experiment Control System LS1 Plans…
Robert Gomez-Reino on behalf of PH-CMD CERN group.
Industrial Control Engineering PXI software support and accelerator integration.
Ph. Gayet2 nd FCC Workshop1Ph. Gayet2 nd FCC Workshop1 FCC Control Systems Concepts: Why it's not too early to speak about it !!! Ph. Gayet FCC Washington.
Openlab Workshop on Data Analytics 16 th of November 2012 Axel Voitier – CERN EN-ICE.
9th September 2001R. BARILLERE - IT-CO1 Industrial and Custom Front-End solutions for Process Controls.
European Organization for Nuclear Research LHC Gas Control System Applications G.Thomas, J.Ortola Vidal, J.Rochez EN-ICE Workshop 23 April 2009.
André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.
Ethernet IP solution for ATLAS IBL and CMS Pixel detectors CO 2 cooling plants Lukasz Zwalinski PH/DT/DI.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
Workshop on the Use of Ethernet as a Fieldbus CERN, 28 September 2001 Use of Ethernet in the control systems of the cooling and ventilation infrastructure.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
FAIR Accelerator Controls Strategy
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
Industrial Control Engineering UNICOS device and front-end Hervé Milcent UNICOS device front-endHervé Milcent1.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
1 UNICOS PVSS Evolution Cryogenics Control Enrique BLANCO Industrial Controls & Electronics Group.
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
Architectural issues M.Jonker. Things to do MD was a success. Basic architecture is satisfactory. This is not the end: Understanding of actual technical.
UNICOS Roadmap 2015 Enrique Blanco On behalf of the UNICOS team EN-ICE 1 March 2015 CERN March 27, 2015 GSI - CERN Collaboration.
AT Control Forum First Meeting. Introduction  The AT Controls FORUM :  Is responsible for coordination of the overall strategy for controls activities.
60kW Thermosiphon control system
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
Industrial Control Engineering Infrastructure: EN/ICE needs Wrap up Mandate: WG Infrastructure to establish the needs for an ICE server pool and study.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
European Organization for Nuclear Research LHC Gas Control System Applications Generation to Deployment phases Strategy/Principles.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
UNICOS F RAMEWORK Enrique BLANCO* Industrial Controls & Electronics Group Engineering Department, CERN Geneva, Switzerland * On behalf of the UNICOS team.
TS workshop 2004U. Epting, M.C. Morodo Testa - TS department1 Improving Industrial Process Control Systems Security Uwe Epting (TS/CSE) Maria Carmen Morodo.
The Control System for the LHC tunnel cryogenics Controlling Cool Accelerators Controle da Criogenia de Aceleradores de Partículas Dr. Paulo Gomes CERN.
JCOP - 17 October 2001NA60_GAZ - E. Mazel J. Rochez1 A Project for the GAS control System At NA60.
Thermo-siphon Control Design Lukasz Zwalinski – PH/DT Alexandre Moraux – PH/DT
Tunnel Cryogenics Instrumentation & Controls for the LHC Enrique Blanco AB/CO IS.
BE – RF CLEX TBM Cooling System Software Perspective (DAQ and analysis) A. Zelios, BE - RF1 A. Zelios A. Vamvakas.
Philippe Gayet Engineering Department OPERATION AND MAINTENANCE INTEGRATED A STEP FURTHER? Philippe GAYET EN-ICE, CERN Asset and Maintenance Management.
Industrial Control Engineering ADE Rapid Application Development Environment.
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
1 Cryogenics Instrumentation & Controls Commissioning for the LHC AB/CO viewpoint Enrique Blanco AB/CO IS.
Vacuum Controls framework for the LHC and its injectors Sebastien Blanchard CERN TE-VSC Integration of controllers in SCADA using OPC Server Goal: Improve.
LabVIEW Core I with RADE introduction EN/ICE/MTA.
Industrial Power Supplies Observations from the survey responses. Observations per commercial vendor. Engagement outline with commercial vendors.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
Distributed middleware for front-ends and systems connectivity Piotr Nikiel on behalf of JCOP 1.
V4.
ICE UPGRADE PLAN Philippe Gayet on behalf of EN-ICE.
Status & Plans for WA105 Control System
SCADA Application Service updates in TS1
CV PVSS project architecture
PLC-based control systems at SOLEIL - ICALEPCS 2017
Common components for OPC-UA developments at CERN: An enhanced OPC-UA toolkit Ben Farnham.
JCOP Review Closeout March 13, 2003 Chip Watson, Robin Lauckner,
Experiment Control System
Presentation transcript:

Industrial Control Activities Forecast Philippe Gayet on behalf of EN-ICE

ç ICE frameworks TN-EN GPN WTS WEB server Enterprise computers Fieldbuses Servers PLC I&0 and devices ICE Covered Area (not Floe) HMI PXI cRIO Labview CO Frameworks FEC WorldFIP ELMB OPC HV power supplies Applications Technology support Support Philippe Gayet EN-ICE2

Industrial control ecosystem evolution LS1 LS LINUXWindows SLC5 support SLC6 support Centos7 support Philippe Gayet EN-ICE3 Technology evolution

Industrial control ecosystem evolution LINUXWindowsWincc-OALabVIEW PLC tool RADEUNICOS/JCOP (SCADA)UNICOS CPC ICE duty is to keep the Industrial control systems applications resilient to these evolutions LS1 LS STEP 7 TIA Portal UNITY Philippe Gayet EN-ICE4 Technology evolution

Philippe Gayet EN-ICE Expected evolution till LS2 5 PLC SIEMENS Hardware: Not expected any announcement on S7-300/400 series. Still in production with new models coming during these years. Software: TIA portal can be used from V13 and it is recommended for new projects. Step7 can be still used for legacy or existing projects. Recommendations : S7-200 PLCs phased out. Need upgrade of installations New Hardware S7-1X00 PLCs can be used and are supported by ICE In case of upgrades, please target projects that contain PLCs not compatible with TIA portal SCHNEIDER End of production for the Premium PLCs expected before LS2. (end of support 8 years later) New series Modicon M340 and M580 are available and can be installed at CERN Recommendations: Upgrade the Premium high-end to the new M340/580 PLCs depending on your plant. Guidelines will be provided. Twido PLCs phased out. Need upgrade of installations Analyze your Premium installations and decide on their life expectation about their upgrade NEW TENDER in 2016 to validate the present choice and/or open to other brands Technology evolution

Philippe Gayet EN-ICE Expected evolution till LS2 6 National Instruments LabVIEW Version evolution (1 per year supported 4 years) Future version evolution of LabVIEW has a concern on backward compatibility and may induce additional resources for migration National Instruments is committed to keep LabVIEW in production for the next 20 years PXIe and cRIO PXIe Part of the study of CO3 on new frontend selection NI Linux RT and White Rabbit on PXIe NI Contract renewal foreseen in 2017 Siemens/ETM WINCC OA New versions that will probably require OS upgrades EYETS : 3.14 LS2: 3.17 Additional functionalities Improvement of performance for the data Archiving and LHC Logging Improvements of the User Interface (Layout management, …) Remote (web) access already available and need to be tested Contract extension for the next 5 years presently under discussion Siemens is committed to keep WINCC OA in production at least for 10 years and to provide support for 20 years Technology evolution

Philippe Gayet EN-ICE Expected evolution till LS2 7 OPC OPC-DA should phase out for LS2 OPC: DA->UA Migration OPC server development insourced (JCOP decision) : OPC-UA servers must be written for CAEN, Wiener, ISEG, Siemens TSPP, Schneider TSPP Better integration of OPC-UA with CMW CAN Hardware interfaces upgrade Support of SYSTEC USB-CAN and AnaGate Ethernet-CAN gateways Replacement of USB-CAN interfaces to Ethernet-CAN gateway when possible Software Upgrade to use CAN with OPC-UA Evolution of ELMB (to be decided in JCOP workshop) DIP API migration to JAVA 8 Reinforce DIP Name Server functionality Evolution of the underlying protocol DIM (CERN in house development) to OPC-UA to be discussed in JCOP Workshop Tools to monitor the activity of clients and servers, i.e. the status of the publications Technology evolution

LINUXWindowsWincc-OALabVIEW PLC tool PLC HWRADE UNICOS/JCOP (SCADA) UNICOS CPC Premium Industrial control ecosystem evolution LS1 LS STEP 7 TIA Portal UNITY Twido S7 300/400S7-200 Schneider Modicon XXX Present version CPC 5 CPC 6 Siemens S 1X000 Philippe Gayet EN-ICE8 Technology support

LINUXWindowsWincc-OALabVIEW PLC tool PLC HWRADE UNICOS/JCOP (SCADA) UNICOS CPC Premium Foreseen ICE frameworks versions LS1 LS STEP 7 TIA Portal UNITY Twido S7 300/400S7-200 Schneider Modicon XXX Present version CPC 5 CPC 6 Siemens S 1X000 Philippe Gayet EN-ICE9 Technology support ICE frameworks

Philippe Gayet EN-ICE Framework Evolution 10 JCOP-UNICOS are unified in a single Supervision Framework (name to be chosen) Additional Functionalities Homogenization of alarm display in coherence with LASER Event replay Reporting for all applications (e.g. number of alarms per day, statistics on data rates, etc) Deploy web remote access Long list of minor new functionalities required by our large community of users. New drivers required for legacy or new installations (BACnet, IEC61850, etc) UNICOS CPC NO Major Version but : Baseline upgrades of applications (not compulsory but recommended) CPC5 End of Life early LS2 (if not before) RADE Upgrade to last version of CERN Middleware and services Automation of deployments New version of RADE compatible to LabVIEW evolution and maximizing backward compatibility will be developed to reduce migration workload Frameworks

Philippe Gayet EN-ICE Application developed by ICE (1) 11 Cryogenics Migration to M580 (1 FTE for 26 weeks) TS3 : non-critical applications as soon as material is received. A stop of the PLC has to be programmed with operation. (5 week) YETS : critical application without Profibus, to be programmed with operation. Impact on production. (4 week) LS2 : critical application with fieldbus. Needs new Ethernet IP cards (available in 2016) and recommissioning of all I/O on fieldbus. Process to be stopped 2 or 3 days. (17 week) New projects: Redundancy of the LHC warm compressors, Small liquefier for the existing storage tanks, new mobile refrigerator ??? CIET Introduction of new VFT (Virtual flow meters) devices, study to include PA sensors diagnostics (expert view). GCS New or Upgrade of Gas systems Modifications to be done on existing gas systems New gas systems to be developed (list not defined yet by PH-DT) Any new gas systems will be developed with Modicon series (M340/M580) and Ethernet/IP as fieldbus Replacement of existing Premium Schneider PLCs with Modicon series (M340/M580) and Ethernet/IP is considered Applications

Philippe Gayet EN-ICE Application developed by ICE (2) 12 Cooling and ventilation (5 FTE per year) Pursue the program of migration toward UNICOS of existing installation 100 applications already in operation 43 potential consolidation projects on which 35 are approved by CV Include 15 new Projects ( Migration program expected to extend till LS3 Electrical Infrastructure Finalisation of PSEN Disaster recovery center RTU replacement project Decision in December Oscillo-perturbography using LabVIEW, and cRIO Scalability test (50+ systems) Mass deployment from now to LS2 SURVEY (0.4 FTE ) Likely to develop the inclination sensors devices Applications

Philippe Gayet EN-ICE Application developed by ICE (3) 13 QPS Upgrade of IPQ, IPD and IT protection systems: new signals, re-configuration of field-bus networks, new API for QPS client Deployment of protection systems for 11 T magnets: new signals, re- configuration of field-bus networks, new API for QPS client (not yet clear whether 11T magnets will be installed during LS2) (Induced task but not really LS2 activity): Test benches SM18 and B180: in case we connect to standard QPS supervision (not foreseen at the start-up) PIC/WIC Nothing foreseen on PIC so far. WIC: 7 New applications: Transfer lines Linac4 - PSB (Booster),Transfer lines PSB – PS, TT2, TT10, AD (Experimental area), SM18/FAIR, depending on the final solution chosen. DSS Re-engineering of the application components according to ICE standard Deployment of the reengineered systems Applications

Philippe Gayet EN-ICE Application developed by ICE (4) 14 LabVIEW Applications Post Mortem/Hardware Commissioning ACCTEST integration (13 applications) and configuration database LINAC 4 emittance measurement TIM Survey multi alignment system (PXI) HLS system, robot controlled PXI-Spectrum HTS cable test system in SM18, HTS magnet tests system in Cluster D, SM18 RP-TIM Tunnel Inspection system (to equip 4 trains) RF cavity test applications Magnet test applications Vacuum applications ISOLDE Off-line separator application renovation … Applications

Philippe Gayet EN-ICE User applications support known today 15 Cryogenics experimental areas Development of several installations CPC5 re-engineering applications Vacuum Co-development of the VAC UNICOS package (need to establish a clear project roadmap) Support deployment of UNICOS applications LHC Experiments RACK Control to be refurbished (collaboration with EN-EL) PH-DT CPC5 re-engineering applications & Deployment of the re-engineering project (could be done before LS2) Detector cooling Need to define Support for cooling Quid of CFC cooling that are approaching obsolescence??? TE- ABT : Hardware and timing for PS kicker systems upgrade TE-EPC : migration to UNICOS … Support

Philippe Gayet EN-ICE Improved Services 16 SCADA Applications Service Review of current architecture for each of the application domains in view of improving them for operation/maintenance/performance Reduce further version upgrade impact. Ultimate goal : upgrade fully transparent for critical applications Automated Application migration tools PLC Tools & Services Monitoring of all PLCs by agent to improve diagnostics PLC deployments with New Version control tool Asset management of PLC and PXI components in INFOR EAM Data analytics tools to assist the operators/engineers in collaboration with IT and BE- CO: Alarm analysis, cryogenics oscillations, etc… Data analytics as a service Consultancy Advanced control (regulation tuning, MBPC,…), Formal validation and Simulation Support

Philippe Gayet EN-ICE Summary 17 No technological revolution but permanent evolution No major end of life issues even in the HL-LHC perspective Please follow the recommendations. No Major Framework evolution for UNICOS/JCOP more uncertainties for LabVIEW that may impact RADE and applications Use the frameworks they will make you life easier in case of technological evolutions Follow the supported versions ICE may handle the migration of your applications or assist your group using the standard tools in the migration process (Too?)Many applications to be developed for various groups or by equipment groups that need our support. If you feel that you need support please contact us ASAP. Some projects need decisions Additional request from this workshop have to be evaluated Close collaboration with equipment group are mandatory to establish early and adapted planning Careful resources planning and optimization needed to complete the picture. Technical Evolutions need to be approved in Ad Hoc Committees : CO3 or JCOP

Thank you for your partnership!!