LBT Q2 2007 Engineering Review HBSC Hydrostatic Bearing System.

Slides:



Advertisements
Similar presentations
VIBRATION AND LUBE OIL PRESSURE SWITCH INSTALLATION AND MONITORING Higgins Station.
Advertisements

LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
TCS3 Conceptual Design Review 1 Aug 21, 2003 TCS3 Project Replacement of the Telescope Control System for the IRTF Conceptual Design Review Aug 2003.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
1 LBT Q Eng/SW Review SHTR: Shutters. 2 Highlights (Q1/2009) Shutters have been working well, generally Shutters have been working well, generally.
Arecibo Telescope Servo & Drive System Technical Meeting May 2004 VERTEX ANTENNENTECHNIK GmbH Arecibo Telescope Servo Drive System Ideas For Computer.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
General Computer Science for Engineers CISC 106 James Atlas Computer and Information Sciences 10/23/2009.
Transportation Research Board 2004 Annual Meeting Adaptive Signal Control Workshop Session 2: Field Experience January 11, 2004.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
Magellan Telescopes Observatory Report Accomplishments Problems Work in Progress Network f5 mirror coating.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review Primary Mirror Cells Biddick/Gusick/Kern.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
1 LBT Q Engineering Review ICS – Instrument Cooling System.
TRENTON Casing Filler Presentation
Automating Continuous Gas Lift
1 LBT Q Eng/SW Review PVM: Preventive Maintenance.
20 October 2008LBT Q Eng/SW Review0 PCS – Pointing Control Subsystem Michele De La Peña.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
Life cycle services for automation products
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
Network Address Translation External/ Internal/. OVERLOADING In Overloading, each computer on the private network is translated to the same IP address;
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
Matthew Gardner, 8/20/14.  Replace old water based AC system with conventional rooftop AC system. Drain and abandon old water lines.  Remove old air.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
LBT Q Engineering Review SAB Static Balancing.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
LBT Q Eng/SW Review MCSC – Mount Control System.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
AMS-02 Delta CDR Structural Analysis and Certification Process Carl Lauritzen Structural Analysis Lead Jacobs Engineering
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering/Software Review ROTRotators.
Continuous Throughput Testing and Dynamic Visualization Utilizing Network Diagnostic Tool (NDT) To solve our problem ;)
Oil leak from unknown source discharging from storm sewer into large river.
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
Chapter 3 Fluids in Motion-- - The Bernoulli Equation (Elementary Fluid Dynamics –The Bernoulli Equation)
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
LBT Q Engineering Review Primary Mirror Cells.
ABT-EC EYETS Activities 2nd reports
PRESENTATION ON AUTOMATION,PLC AND SCADA
Transportation Research Board 2004 Annual Meeting
Fuel Supply System Service
LCLS Injector: Introduction D. H
TRENTON Casing Filler Presentation
Instrumentation and control
Operation of Target Safety System (TSS)
Presentation transcript:

LBT Q Engineering Review HBSC Hydrostatic Bearing System

10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) PLC now remotely controllable from MCSPU PLC now remotely controllable from MCSPU Start/Stop/Stow pins in–out/Alarm Reset/Remote Mode Enable WinCC (engineering diagnostic) running on dedicated workstation in Control Room WinCC (engineering diagnostic) running on dedicated workstation in Control Room 2 nd Modified Lateral pad installed last week 2 nd Modified Lateral pad installed last week

10-Jul-2007LBT Q Engineering Review

10-Jul-2007LBT Q Engineering Review Open Issues Technical Technical PLC Control law unknown, undocumented. PLC Control law unknown, undocumented. Firewall not penetrable for WinCC Firewall not penetrable for WinCC Schedule Schedule None None Financial Financial None None Resource Resource Mountain support pacing operation Mountain support pacing operation Luciano out of loop. Luciano out of loop. Network and Firewall communications issues unresolved Network and Firewall communications issues unresolved

10-Jul-2007LBT Q Engineering Review Progress (Q2/2007) Stow Pin remote control now possible Stow Pin remote control now possible WinCC (engineering diagnostic) running WinCC (engineering diagnostic) running Completed removal and replacement of 1 more modified lateral pad Completed removal and replacement of 1 more modified lateral pad Hardware and capillaries on hand for remaining installation Hardware and capillaries on hand for remaining installation

10-Jul-2007LBT Q Engineering Review Planning (Q3/2007) NRAO will modify 1 lateral pad across street NRAO will modify 1 lateral pad across street Remaining 6 will be modified at LBTO by NOAO in late Aug./early Sept. Remaining 6 will be modified at LBTO by NOAO in late Aug./early Sept. Continue capillary installation of laterals, followed by radials and azimuth Continue capillary installation of laterals, followed by radials and azimuth systematic measurement of lift, tuning system to maximize stiffness systematic measurement of lift, tuning system to maximize stiffness replace hoses with hard pipe on level 5 replace hoses with hard pipe on level 5

10-Jul-2007LBT Q Engineering Review PLC Programming Goals Remedy communication problem between LBTO WinCC computer and VoltsDC in Chandler. Remedy communication problem between LBTO WinCC computer and VoltsDC in Chandler. Complement WinCC Engineering override code to provide data-logging at ~10 Hz Complement WinCC Engineering override code to provide data-logging at ~10 Hz Rewrite PLC code to control pressure directly, not use lookup table. Rewrite PLC code to control pressure directly, not use lookup table. Identify and correct why PLC does not shutdown system when pocket pressures fail Identify and correct why PLC does not shutdown system when pocket pressures fail

10-Jul-2007LBT Q Engineering Review Hydraulic Goals Cut the oil flow, cooling and power to the bearings by more than half. Cut the oil flow, cooling and power to the bearings by more than half. Improve the static stiffness of the bearings by 10% Improve the static stiffness of the bearings by 10% Reduce system pressure from 120 to 95 bar. Reduce system pressure from 120 to 95 bar. Improve the dynamic stiffness of the Lateral bearing by about 500%. Improve the dynamic stiffness of the Lateral bearing by about 500%. Moving the capillaries to the pads and resize Moving the capillaries to the pads and resize Eliminate the internal ateral oil return groves. Eliminate the internal ateral oil return groves. Relocate the Lateral return hole. Relocate the Lateral return hole.