Non-Federal Development at Reclamation Facilities.

Slides:



Advertisements
Similar presentations
California Water Balance. Water Reserved for the Environment.
Advertisements

Ted Craddock, DWR 2014 NWHA Conference Oroville Facilities FERC Project No
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Bonneville Power Administration - Pumped Storage Evaluation Northwest Hydroelectric Association.
G LASGOW R EGIONAL L ANDFILL M ETHANE R ECOVERY TO E LECTRIFICATION P ROJECT GOVERNOR’S ENERGY CONFERENCE By Mayor Rhonda Riherd Trautman.
Program Name or Ancillary Texteere.energy.gov Wind and Water Power Technologies Office United States Department of Energy Water Power Program: Hydropower.
California Recycled Water Plan California Recycled Water Plan A comprehensive approach to California’s long-term water supply By Gregory B. Ryan and Meagan.
Implementation of Pinyon-Juniper Woodland Treatment Elements of the BLM’s Ely RMP/EIS: Opportunities for Public-Private Partnerships to Secure Environmental.
Environmental Justice (EJ) & Community-Based Transportation Planning (CBTP) Grant Programs California Department of Transportation District 3 January 25,
Division of Local Assistance Office of Special & Discretionary Programs December 2, 2010.
Unleashing Entrepreneurship Service and Investment Innovations E+Co Christine Eibs Singer 383 Franklin Street Bloomfield, NJ, USA.
NOT FOR PUBLIC DISTRIBUTION State of Minnesota Technology Summary February 24, 2011.
PaintCare Paint Stewardship Program Alison Keane, VP, Government Affairs, ACA General Counsel, PaintCare.
LOW CARBON TRANSIT OPERATIONS PROGRAM [SB 862 (2014)] DECEMBER 2014.
In-conduit Hydropower: Public Sector meets Private Inventions
Bureau of Reclamation Overview Christopher Cutler Deputy Chief Boulder Canyon Operations Office.
WaterSMART Basin Study Program. SECURE Water Act Section 9503 Directs the Secretary to establish a climate change adaptation program which includes –Assess.
Driving Indiana’s Economic Growth. Management and Preservation of Indiana's Historic Bridges: A Programmatic Approach Thanks to Mead & Hunt & FHWA-IN.
Introduction to Bonneville Power Administration
Current state of energyproduction and useage, sources and domestic production.
Resource Planning Georgia Power’s Diverse Plan to Meet Georgia’s Energy Needs AWMA Fall 2010 Conference October 7, 2010 Jeff Burleson Director of Resource.
1. 2 Water Supply Sources Surface water Groundwater Reuse Water Supply Facilities Storage Wells Desalinization Plants Intakes& Pumps Treatment Transmission.
NRCS Watershed Rehabilitation
Metering - FEMP’s Perspective Presentation to the Interagency Energy Management Task Force by Ab Ream, FEMP O&M Program Lead October 16,
Emerging Legal Issues Chuck Sensiba, Van Ness Feldman LLP Northwest Hydroelectric Association Annual Conference February 18, 2014.
State of Oregon New Hydroelectric Projects Mary Grainey October 2008 Oregon Water Resources Department.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Characteristics of Existing and Potential Hydropower Resources in the U.S. presented by Brennan T. Smith, PhD, PE Water Power Program Manager Group Leader,
2  Large Service Area ◦ Copper Basin and Valdez  Electrically isolated from neighboring utilities  50% Hydro / 50% Fossil Fuels  Current Rates ◦ 18¢/kWh.
Water Conservation, Reuse & Storage Grant Program Application Review Team Meeting November 7, 2013.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
ISAC Fall School November 30, 2012 Iowa’s Wind Energy Industry & Economic Impact.
US ARMY CORPS OF ENGINEERS NORTHWESTEN DIVISION PORTLAND, OREGON WELCOME BY COL. FASTABEND Division Commander.
Hydropower Activities Midwest Electric Consumers Association June 11 and 12, 2013.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
GKRSE law offices of GKRSE 1 Federal Regulatory Issues Affecting the Development of Hydro in the Northeast Nancy J. Skancke Law Offices of GKRSE Washington,
HYDROPOWER. Objective: The student will be become familiar with the Corps policy for hydropower development. The student will be have a basic understanding.
INTEGRATED RIVER BASIN MANAGEMENT: FROM THEORY TO PRAXIS B.P.F. Braga Director Agência Nacional de Águas Regional Workshop and Capacity Building Training.
Public-Public Partnerships February 27, ADC WINTER FORUM | PAGE 2 Public – Public Partnerships Boot camp for Defense Communities Craig Zgabay.
January 26, 2012 Las Vegas, Nevada. Facts: The Colorado River… is more than 1450 miles long drains 246,000 sq-miles (1/12 of the continental US) has an.
1 | Program Name or Ancillary Texteere.energy.gov Percheron Power, LLC’s Proof of Power Project on Potholes East Canal (POP ‐ PEC) 2011 Water Power project.
ANA AGÊNCIA NACIONAL DE ÁGUAS SESSION 5 - WATER GOVERNANCE IN BRAZIL Gisela Forattini Voorburg, the Netherlands May 2006 USER-PRODUCER CONFERENCE:
Demand Response in Energy and Capacity Markets David Kathan FERC IRPS Conference May 12, 2006.
BUILDING STRONG SM Northwestern Division Presented by Lori Rux Chief, Program Support Division June 11, 2009 BPA Direct Funding for Corps Hydropower Projects.
El Gallo Hydroelectricity Project PDD Analysis
Sustainable Cities through Environmental Compliance and Enforcement Kenneth Markowitz 19 October 2015.
Micro-hydropower for the home, farm, or ranch: A brief overview
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
SUPPLEMENTAL ENVIRONMENTAL PROJECTS. KEY CHARACTERISTICS OF A SEP Projects must improve, protect or reduce risks to public health or environment. Projects.
Proposed Carbon Pollution Standard For New Power Plants Presented by Kevin Culligan Office of Air Quality Planning And Standards Office of Air and Radiation.
Reclamation and Hoover Dam It’s All About The Water.
What are Reclamation and its partners doing to improve water supply projections, and to develop adaptations and build resilience to climatic and hydrologic.
Erdeneburen HPP Project Implementation Unit
Growing Smarter Pennsylvania’s Land Use Agenda. Percent of Land Developed in Pennsylvania Source: Natural Resources Conservation Service, U.S. Department.
Strategies for Colorado River Water Management Jaci Gould Deputy Regional Director Lower Colorado Region.
ACEC Annual Convention April 29, 2014 Washington D.C. Lowell Pimley Acting Commissioner RECLAMATION Managing Water in the West U.S. Department of the Interior.
Berkshire Wind: Joint Action By Communities with Common Goals Presented by: David Tuohey, Director of Communications & External Affairs Massachusetts Municipal.
Real Property Policy Update Planning and Development Committee August 4, 2015.
NO NET LOSS of PUBLIC HUNTING LANDS in FLORIDA June 2008 Update.
Power Purchase Agreements (PPA) Owner’s Perspective What is a Power Purchase Agreement? Agreement to purchase power from a third-party provider Fixed term:
Flex EMS Program Review March 15, 2017 Christy Edwards
Environmental Quality Board
Public-Private Partnerships in Climate Change:
OBJECTIVE 1 Irrigation District Infrastructure Studies
Large scale development groundwater balance
DISTRICT COOLING A promising and sustainable option for HFC phase-down
USA Clean Energy Update
Carbon Capture & Sequestration
Office of Waste Disposal Office of Environmental Management
Planning Partner Adoption Multi-Jurisdictional Hazard Mitigation Plan
Presentation transcript:

Non-Federal Development at Reclamation Facilities

Reclamation Power Program Own and operate 53 hydropower plants 176 Units 14,639 MW Installed Capacity 2nd Largest Hydropower Producer in United States 40 Million MWH Annual Average Net Generation Approximately 7 Percent of Power in West 2

Reclamation Power Program Offsets 27 million tons of carbon dioxide Saves 6.8 million tons of coal Saves 23.5 million barrels of oil 3

4

Non-Federal Development 76 power plants added to Reclamation dams and canals by non-federal entities –Specific legislation –Lease of Power Privilege –FERC licenses 5

Non-Federal Development Current interest in more than 10 projects that fall under the Lease of Power Privilege process Current interest in over 20 projects that fall under FERC licensing process 6

1981 Reclamation/FERC MOU If authorized for Federal development –Reclamation can develop the site –A Non-Federal Developer can enter into a Lease of Power Privilege Agreement If not authorized for Federal development –FERC License 7

1992 Reclamation/FERC MOU Establishes a process for the early resolution of jurisdictional issues related to non-federal hydropower development at Bureau of Reclamation facilities 8

Lease of Power Privilege Reclamation Project Act of 1939 – 40 year lease (max) Selection of the lessee through a public process Preference to municipalities, public corporations or agencies, and cooperatives financed through the Rural Electrification Act of

Lease of Power Privilege (continued) Adequate design information Satisfactory environmental analysis and impacts And must not be detrimental to the existing project 10

Lease Payments Lease payments to the United States shall be consistent with Section 9(c) of the Reclamation Project Act of 1939 –Equitable amount charged for the use of the Reclamation facility. –Lessee shares in the cost of operation, maintenance, replacement, and security of any existing Federal facilities that benefit the lessee’s power facility unless otherwise provided by law. 11

Sustainable Hydropower Development Opportunities Resource Assessment at Existing Reclamation Dams –65 Sites show potential –962,000 MWh and over 200 MW of Capacity –Draft Report Released October 2010 (report located at –Public Comments collected –Final Report expected in March

Sustainable Hydropower Development Opportunities Canal Resource Assessment –Inventory technical potential by December 2011 Pilot Project to Demonstrate Low Head Technologies –Funding Opportunity Announcement March 2011 WaterSMART Grants criteria now encourage energy-water integrated projects Laguna Madre Water District Swalley Irrigation District Central Oregon Irrigation District 13

Next Steps Standardization of lease of power privilege Standardized lease cost methodology Research into pumped storage development Basin Scale Opportunity Assessments 14

Thank You! Kerry McCalman Power Resources Office (303) Power Website: