Regina Demina, Hadron collider workshop, FNAL, October 16-18, 20031 SLHC tracking issues Regina Demina, University of Rochester International Workshop.

Slides:



Advertisements
Similar presentations
Radiation damage in silicon sensors
Advertisements

Trapping in silicon detectors G. Kramberger Jožef Stefan Institute, Ljubljana Slovenia G. Kramberger, Trapping in silicon detectors, Aug , 2006,
Hartmut Sadrozinski US-ATLAS 9/22/03 Detector Technologies for an All-Semiconductor Tracker at the sLHC Hartmut F.W. Sadrozinski SCIPP, UC Santa Cruz.
P5 Meeting - Jan , US LHC University M&O Personnel University with major hardware responsibility at CERN Based on > 10 years of US Zeus experience.
For the RD42 Collaboration
LHC SPS PS. 46 m 22 m A Toroidal LHC ApparatuS - ATLAS As large as the CERN main bulding.
Vertex 2001 Brunnen, Switzerland Phil Allport Gianluigi Casse Ashley Greenall Salva Marti i Garcia Charge Collection Efficiency Studies with Irradiated.
Status & Goals of LHC 1 1pb-1 of delivered and recorded luminosities reached! As of this morning: Delivered: 1420 nb-1 Recorded: 1245 nb-1 New record Inst.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
Slide 1 sCVD Diamond for the CMS Pixel Detector May 2004 R.Stone, Rutgers J.Doroshenko, L.Perera, S.Schnetzer RD42 Collaboration Meeting Overview.
ATLAS SCT module performance: beam test results José E. García.
1 On the Large Hadron Collider - Collider - Experiments R.-D. Heuer, CERN Fermilab, June11, 2012.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
Hartmut Sadrozinski, SCIPP RD50 Sensor Meeting Trento, Feb. 28, Electronics Issues for sLHC Tracking Detectors Noise, Threshold Signal Signal/Threshold.
Jornadas LIP, Dez P. Martins - CFTP-IST The NA60 Silicon Vertex Telescopes Dimuon measurements Dimuon measurements Vertex telescope used in: Vertex.
Summary of CMS 3D pixel sensors R&D Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
11 th RD50 Workshop, CERN Nov Results with thin and standard p-type detectors after heavy neutron irradiation G. Casse.
Online Radiation Dose Measurement System for ATLAS experiment I. Mandić a, representing ATLAS collaboration a Jožef Stefan Institute, Jamova 39, Ljubljana,
Gunnar Lindstroem – University of HamburgHamburg workshop 24-Aug-061 Radiation Tolerance of Silicon Detectors The Challenge for Applications in Future.
Semi-conductor Detectors HEP and Accelerators Geoffrey Taylor ARC Centre for Particle Physics at the Terascale (CoEPP) The University of Melbourne.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Roger Rusack – The University of Minnesota 1.
1 Digital Active Pixel Array (DAPA) for Vertex and Tracking Silicon Systems PROJECT G.Bashindzhagyan 1, N.Korotkova 1, R.Roeder 2, Chr.Schmidt 3, N.Sinev.
Silicon Sensors for Collider Physics from Physics Requirements to Vertex Tracking Detectors Marco Battaglia Lawrence Berkeley National Laboratory, University.
SLHC SG: ATLAS Pixel G. Darbo - INFN / Genova SLHC SG, July 2004 ATLAS Pixel at SLHC G. Darbo - INFN / Genova Talk overview: A table with different High.
H. Matis, M. Placidi, A. Ratti, W. Turner [+ several students including S. Hedges] (LBNL) E. Bravin (CERN), R. Miyamoto (BNL – now at ESSS) H. Matis -
Summary of CMS 3D pixel sensors R&D Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
ASIC R&D at Fermilab R. Yarema October 30, Long Range Planning Committee2 ASICs are Critical to Most Detector Systems SVX4 – CDF & DO VLPC readout.
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
PHASE-1B ACTIVITIES L. Demaria – INFN Torino. Introduction  The inner layer of the Phase 1 Pixel detector is exposed to very high level of irradiation.
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
Jean-Marie Brom (IPHC) – 1 DETECTOR TECHNOLOGIES Lecture 3: Semi-conductors - Generalities - Material and types - Evolution.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
Run Iib Workshop Dec 12-13, 2002 Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University.
Production Readiness Review of L0/L1 sensors for DØ Run IIb R. Demina, August, 2003 Irradiation studies of L1 sensors for DØ 2b Regina Demina University.
May 14, 2001C.Rott1 The CMS Forward Pixel Detector Carsten Rott Purdue University May 14, 2001.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
M. Garcia-Sciveres July 2002 ATLAS A Proton Collider Detector M. Garcia-Sciveres Lawrence Berkeley National Laboratory.
The LHCb Vertex Locator Lars Eklund LHCb VELO Group of the LHCb Collaboration CERN (Geneva), EPFL (Lausanne), NIKHEF (Amsterdam), University of Glasgow,
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
Polycrystalline CVD Diamonds for the Beam Calorimeter of the ILC C.Grah ILC ECFA 2006 Valencia, 9 th November 2006.
Fabiola Gianotti, 14/10/20031  s = 28 TeV upgrade L = upgrade “SLHC = Super-LHC” vs Question : do we want to consider also the energy upgrade option.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
09 September 2010 Erik Huemer (HEPHY Vienna) Upgrade of the CMS Tracker for High Luminosity Operation OEPG Jahrestagung 2010.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
H. Matis, S. Hedges, M. Placidi, A. Ratti, W. Turner [+several students] (LBNL) R. Miyamoto (now at ESSS) H. Matis - LARP CM18 - May 8, Fluka Modeling.
SPHENIX Mid-rapidity extensions: Additional Tracking system and pre-shower Y. Akiba (RIKEN/RBRC) sPHENIX workfest July 29,
Giulio Pellegrini Actividades 3D G. Pellegrini, C. Fleta, D. Quirion, JP Balbuena, D. Bassignana.
The BTeV Pixel Detector and Trigger System Simon Kwan Fermilab P.O. Box 500, Batavia, IL 60510, USA BEACH2002, June 29, 2002 Vancouver, Canada.
RD42 Status Report W. Trischuk for the RD42 Collaboration LHCC Meeting – June 12, 2013 Development of CVD Diamond Tracking Detectors for Experiments at.
0 Characterization studies of the detector modules for the CBM Silicon Tracking System J.Heuser 1, V.Kyva 2, H.Malygina 2,3, I.Panasenko 2 V.Pugatch 2,
Zheng Li, 96th LHCC open session, 19th November 2008, CERN RD39 Status Report 2008 Zheng Li and Jaakko Härkönen Full author list available at
Panja Luukka. Silicon Beam Telescope (SiBT) Group Since 2007 a collaboration of several CMS institutes has been operating a silicon micro-strip beam telescope.
An Idiot’s Guide to LHC Upgrades Bohr Lunch Seminar. 16/5/08 Terry Wyatt. University of Manchester.
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
Installation, Commissioning and Startup of ATLAS & CMS Experiments
Tracking in SuperLHC 1. Radiation damage
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

Regina Demina, Hadron collider workshop, FNAL, October 16-18, SLHC tracking issues Regina Demina, University of Rochester International Workshop on Future Hadron Colliders: Physics, Detectors, Machines

Regina Demina, Hadron collider workshop, FNAL, October 16-18, 20032OutlineOutline Accelerator upgrade stages Requirements on tracking Radiation hard R&D Electronics issues System integration issues Summary AI=action item (to be addressed in future workshops)

Regina Demina, Hadron collider workshop, FNAL, October 16-18, LHC upgrade stages LHC performance: 7 TeV beam Beam-beam tune spread E11 p/bunch L= 1E34 cm -1 s -1 Phase 0: max performance w/o hardware changes to the LHC Increase B to 9 T  E to 7.54 TeV Increase bunch intensity to 1.7E11p/bunch  L=2.3E34 O. Brüning et al., “LHC Luminosity and Energy Upgrade: a Feasibility Report”, LHC Project Report

Regina Demina, Hadron collider workshop, FNAL, October 16-18, LHC upgrade stages Phase 1: max performance while keeping the LHC arcs  * = 0.5  0.25 m Crossing angle 300  rad  425  rad (essential at decreased b* to minimize long range collisions) Bunch intensity at 1.7 E11  L =3.3 E34 cm -2 s -1 Bunch crossing interval 25  12.5 ns Increased intensity and other modifications L=4.7 E34 cm -2 s -1 Phase 2: max performance with major hardware changes to LHC Modify injectors Superconduct magnets for SPS (injection E  1TeV) Mech and dynamic aperture changes  x2 in L L= 1.0 E35 cm -2 s -1 by 2015 New superconducting dipoles E  14 TeV (a lot more R&D is needed) – not considered in this discussion

Regina Demina, Hadron collider workshop, FNAL, October 16-18, Tracking in SuperLHC 1. Radiation damage Design luminosity =10xLHC Running time = ½ LHC (5 years) Radiation dose = 5xLHC Inner layers of SiTrk (r=20cm) are expected to be operated at bias voltage 600V after 10 years of LHC SuperLHC  3kV (?!) 1.Need replacement 2.Need improved more rad hard technology 3.The goal is to maintain tracking and b- tagging performance

Regina Demina, Hadron collider workshop, FNAL, October 16-18, Tracking in SuperLHC 2. Granularity With collider energy and/or luminosity increase the emphasis shifts towards higher energy jets. Energetic jets are more collimated  need higher granularity A.I. Local occupancy is more critical. Need to understand for typical jet E for objects at the threshold of sensitivity (e.g. use 7 th heavy quark M Q production model) ADC Strips R=20 cm 7% of tracks in 500 GeV jets have merged hits 2.5% of tracks in 100 GeV jets

Regina Demina, Hadron collider workshop, FNAL, October 16-18, Possible detector configuration What to replace? Most likely 100% of the tracking system Lifetime (no relation to radiation damage) of Si systems so far <~3-4 years, LHC=8-10 years Increase granularity Electronics compatibility To fix all the problems that are not known now Scaling law radiation 1/r 2 R<20 cm – new technology 20<R<60 cm – pixels R>60 – microstrips (with some technology pushing)

Regina Demina, Hadron collider workshop, FNAL, October 16-18, Directions in Tracking R&D Use of defect engineering silicon E.g. DOFZ is now used for ATLAS pixels, possibility for CMS 3D and new biasing schemes New sensor materials Significant success with CVD diamonds Cryogenic Silicon Tracker development Lazarus effect – x10 increase in rad hardness Monolithic pixel detectors Sensor+readout on the same silicon substrate (no bump bonding)

Regina Demina, Hadron collider workshop, FNAL, October 16-18, Why now? CMS SiTrk detectors design time line RD2 report – 1994 CMS technical proposal RD20 report RD48 report – 1997 Start construction phase 2003 Start data taking 2007 = years SuperLHC start data taking 2015 RD?? report =2001 RD50 is formed 10/02 to address the needs of Super LHC

Regina Demina, Hadron collider workshop, FNAL, October 16-18, RD50RD50 Approved by CERN 06/ institutions, 5 from US (Fermilab, Purdue, Rutgers, Syracuse, BNL) Areas of research Material engineering Oxygenation, si carbite Device engineering Pad, 3D, thin detectors Rad hard technologies used for LHC are not completely characterized

Regina Demina, Hadron collider workshop, FNAL, October 16-18, RD50RD50

Regina Demina, Hadron collider workshop, FNAL, October 16-18, Radiation damage – microscopic defects

Regina Demina, Hadron collider workshop, FNAL, October 16-18, Radiation damage Leakage current grows with rad dose P-type impurities concentration increases, sensor goes through n  p type inversion and then depletion voltage grows indefinitely Annealing Reverse annealing

Regina Demina, Hadron collider workshop, FNAL, October 16-18, Oxygen enriched silicon DOFZ (Diffusion Oxygenated Float Zone) O: cm -3 Introduced to HEP in 1999 Slows down V depl growth after type inversion Reverse annealing delayed and saturated at high fluences

Regina Demina, Hadron collider workshop, FNAL, October 16-18, Device Engineering: 3D detectors Electrodes: Narrow columns along detector thickness 3D Diameter ~10  m, distance  m Lower Vdepl Thicker detector possible Fast signal

Regina Demina, Hadron collider workshop, FNAL, October 16-18, CVD diamonds Good progress lately Main issues charge collection distance reached 250 um S/N = 8/1 Very radiation hard Resolution improves (!) after 2E15 p/cm -2 Pretty

Regina Demina, Hadron collider workshop, FNAL, October 16-18, Electronics issues 0.25 um  0.13 um 0.25 um might not be available on SLHC time scale or even worse only few vendors will be left 0.13 um – more rad hard Tracker in L1 trigger Binary? – ATLAS experience will tell Power supplies (why do they always become an issue) AI’s: Cost of 0.13 um development is very high must managed cooperatively Power consumption at 80 MHz Signal level At ~1V every welder in your neighborhood is your signal

Regina Demina, Hadron collider workshop, FNAL, October 16-18, System integration issues Large complex systems cannot be treated just as the sum of the parts Installed in experiment detector systems exhibit features not present in laboratory testing Commissioning is becoming a lengthy process years Why we are never able to get to b-tagging efficiency seen in Monte Carlo?

Regina Demina, Hadron collider workshop, FNAL, October 16-18, Examples of “integration issues” SuSy will jump at you after 2-3 weeks of LHC data taking Not the first two weeks Susy? No, calorimeter noise Silicon tracker (WSMT)  calorimeter “cross talk” Welders DØ

Regina Demina, Hadron collider workshop, FNAL, October 16-18, Examples of “integration issues” CDF L00 – signal carried by analogue cables Readout the whole L00 Fit pedestals with Chebyshev polynomials Another interesting story Resonance Lorentz force  wirebond breaks

Regina Demina, Hadron collider workshop, FNAL, October 16-18, AI on integration A lot of experience gained by Tevatron on integration and commissioning of large detector systems Statistics of failure modes (e.g. 12% of a system lot due to poor cable connection) grounding Documentation System integration is a worthy R&D project

Regina Demina, Hadron collider workshop, FNAL, October 16-18, SummarySummary LHC upgrades will deliver x10 in L and possibly x2 in energy Most likely entire tracking systems of both high Pt experiments will have to be replaced Requirements to tracking upgrades Radiation hardness Higher granularity Fast response R&D program has started: RD50 – silicon detectors RD42 – good progress with CVD diamonds Electronics: 0.25  0.13 um transition System integration must be given high priority

Regina Demina, Hadron collider workshop, FNAL, October 16-18, Action Items Understand local occupancy for typical jet E for objects at the threshold of sensitivity (e.g. use 7 th heavy quark M Q production model) Electronics: Cost of 0.13 um submissions Power consumption Signal and noise levels Integration Documentation of Tevatron experience R&D task