THEMIS Instrument PDRGSE- 1 UCB, October 15-16, 2003 IDPU Ground Support Equipment Preliminary Design Review F. Harvey University of California - Berkeley.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.
Team GPS Rover Alex Waskiewicz Andrew Bousky Baird McKevitt Dan Regelson Zach Hornback.
Instrument TrainingIDPU - 1 UCB, Dec 6, 2006 THEMIS INSTRUMENT TRAINING IDPU.
THEMIS Mission CDRInstrument I&T 1 UCB, June , 2004 Instrument Integration and Test Rick Sterling / Sharon Jelinsky University of California – Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
TRIO-CINEMA 1 UCB, 2/08/2010 STEIN Intro Davin Larson Space Sciences Laboratory University of California, Berkeley.
SwRR 4/28/ Telecon MAVEN Particles and Fields Flight Software Requirements Review SwRR Peter R. Harvey April 28, 2010.
Selda HeavnerFIELDS iPDR – Antenna Electronics Board Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Board Selda S. Heavner U.C. Berkeley
THEMIS MISSION PDRESA- 1 UCB, November, 2003 ESA Plasma Instrument Mission PDR Dr. C. W. Carlson and Themis ESA Team UC Berkeley SSL.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
THEMIS Instrument Suite PERSuite T-V- 1 UCB, May 2, 2005 THEMIS Instrument Suite Thermal Vac Test Rick Sterling University of California, Berkeley.
TIM Phase A 1 SSL, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting EFW Digital Electronics Digital Control Board (DCB)
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Electrical Fabrication and Test.
TRIO-CINEMA 1 UCB, 2/08/2010 Instrument Interface Board Dorothy Gordon CINEMA - EE Team Space Sciences Laboratory University of California, Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
THEMIS Instrument PDRParts- 1 UCB, October 15-16, 2003 Parts Requirements Preliminary Design Review Jorg Fischer University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR217 RBSP Electric Field and Waves Instrument (EFW) Instrument.
Sept. 2008EFW INST+SOC PDR IDPU Chassis Mechanical Design and Development Bill Donakowski Mechanical Engineer UCB/SSL
THEMIS/SRR ESA- 1 UCB, 06/08/2003 THEMIS Electrostatic Analyzer (ESA) instrument David W. Curtis Space Sciences Laboratory University of California, Berkeley.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
C. Ingraham5-7 March 2001Data Processing Unit IFR1NCKU UCB Tohoku ISUAL Data Processing Unit (DPU) C. Ingraham.
THEMIS Instrument FM2/FM3 PERSystems- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review System Overview Ellen Taylor University.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
Hall D Online Meeting 9 August 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division Mission Who’s Who.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
FGM peer PDR I/F - 1 Braunschweig, October 8-9, 2003 Digital Interface (I/F) Aris Valavanoglou Institut für Weltraumforschung (IWF) Austrian Academy of.
NameFIELDS iPDR – Subject Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Box Selda S. Heavner U.C. Berkeley 1.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
FGM peer CDR GSE - 1 Berlin, April 6, 2004 Ground Support Equipment Concept (GSE) Werner Magnes Institut für Weltraumforschung (IWF) Austrian Academy of.
FGM peer PDR GSE - 1 Braunschweig, October 8-9, 2003 Ground Support Equipment Concept (GSE) Werner Magnes Institut für Weltraumforschung (IWF) Austrian.
Pre-PDR Peer Review 1 UCB MAVEN Particles and Fields Flight Software Peer Review Requirements Definition Peter R. Harvey May 12, 2010.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB FSW Requirements Peter Harvey University of California 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
GoetzPre-PDR Peer Review October 2013 FIELDS Time Domain Sampler Peer Review Keith Goetz University of Minnesota 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Instrument Testing to Date Michael Ludlam for EFW.
109-IDPU-Chassis-Donakowski 1 30 Sep – 01 Oct 2009DRAFT RBSP EFW ICDR 109-IDPU-Chassis-Donakowski IDPU Chassis Mechanical Design and Development Bill Donakowski.
13-1 MAVEN PFP ICDR, May 23 – 25, 2011 Particles and Fields Package Critical Design Review May , 2011 GSE Timothy Quinn.
FM2/FM3 IPSR AND FM4/FM5 IPERSYS - 1 UCB, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW SYSTEM OVERVIEW.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 535 IDPU Chassis Bill Donakowski Mechanical Engineer UCB/SSL.
THEMIS Instrument PDR 1 UCB, October 15-16, 2003 ESA & SST (ETC) Interface Board Preliminary Design Review Robert Abiad University of California - Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
THEMIS CDR 1 UCB, June 16, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 20, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
Timothy Edward Quinn FIELDS iPDR – GSE Solar Probe Plus FIELDS Instrument PDR GSE Timothy Edward Quinn UCB 1.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
FM2/FM3 IPSR AND FM4/FM5 IPERIDPU- 1 UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE-
Status 1 5/07/08 UCB RBSP EFW STATUS 5/07/08. Status 2 5/07/08 UCB Agenda Project Stuff Monthly Report Submitted Schedule Submitted  Milestones Upcoming.
THEMIS IDPU PDRPCB- 1 UCB, October 16, 2003 IDPU Power Control Board (PCB) Peter Berg University of California - Berkeley.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 647 Ground Support Equipment Will Rachelson University of.
Boom Electronics Board (BEB) Engineering Peer Review Oct
Acronyms 3-4 Sept DRAFT EFW INST+SOC PDR 483
An Unobtrusive Debugging Methodology for Actel AX and RTAX-S FPGAs
INSTRUMENT DATA PROCESSING UNIT (IDPU) REQUIREMENTS
Bill Donakowski Mechanical Engineer UCB/SSL
Spacecraft Interface and I&T
INSTRUMENT DATA PROCESSING UNIT (IDPU)
ESA GSE.
Instrument Data Processing Unit (IDPU)
Boom Electronics Board (BEB)
Preliminary Design Review
THEMIS FM4/FM5 INSTRUMENT SUITE
0.0 Instrument Suite Name Presenter’s name
Presentation transcript:

THEMIS Instrument PDRGSE- 1 UCB, October 15-16, 2003 IDPU Ground Support Equipment Preliminary Design Review F. Harvey University of California - Berkeley

THEMIS Instrument PDRGSE- 2 UCB, October 15-16, 2003 Overview GSE Requirements GSE Components IDPU GSE Traveling GSE Calibration GSEs “Gold Box” ETU board debug GSE Interface Board Defect Tracking Schedule Issues

THEMIS Instrument PDRGSE- 3 UCB, October 15-16, 2003 Requirements Evolving Roles ETU Board debug: digital test signals, instrument TLM… Instrument calibration: analog stimulus, fixtures… Flight Board test IDPU GSE: STOL/ITOS/Hashii Requirements Robust for travel No data loss or corruption introduced by GSE Able to create semi-realistic input conditions for tests Flight grade electronic and mechanical interfaces. Safety checks (like FSW) for HV and deployment. Longevity

THEMIS Instrument PDRGSE- 4 UCB, October 15-16, 2003 GSE Components Commercial GPIB-compatible power supplies GPIB-compatible waveform generator Firewire-compatible 333kSps ADC 19” 6U VME subrack Rugged traveling case Altera Stratix / Nios computer GSE computer Locally designed and built components GSE Interface Board, software and FPGA Power supply connection to backplane Motor, SMA, and load simulators. Cabling

THEMIS Instrument PDRGSE- 5 UCB, October 15-16, 2003 IDPU GSE Properties Spacecraft-like interface to IDPU, telemetry & power User interface is modeled on Hashii/ITOS/STOL. Provides digital test patterns for ESA & SST Provides analog waveforms for instrument(s)

THEMIS Instrument PDRGSE- 6 UCB, October 15-16, 2003 Traveling GSE Properties Robust enclosure Supports full IDPU GSE abilities, board regression testing. Does not easily support calibrations outside SSL.

THEMIS Instrument PDRGSE- 7 UCB, October 15-16, 2003 Calibration GSEs Properties Major parts –EFI “Boom Box”. 2 varieties, 2 copies each, 4 Meters long –Vacuum chamber and pumps –Ion gun –Manipulator –Manipulator controller References –Jim Lewis’ PDR PowerPoint talks on ESA & SST –J Bonnell’s paper “Themis EFI GSE Workstation Functional Requirements”, 9/30/2003

THEMIS Instrument PDRGSE- 8 UCB, October 15-16, 2003 “Gold Box” ETU board debug Properties Can supply digital “test patterns” for missing parts: FGE, SST, ESA Usually sends DUT’s telemetry to PC, not S/C telemetry. Small VME backplane. Shares boards with larger GSEs.

THEMIS Instrument PDRGSE- 9 UCB, October 15-16, 2003 GSE Interface Board Overview Altera Stratix Board, mounted as daughter board 6U parent has simple non-FPGA circuits borrowed from DCB design. FPGA has CDI transmit / receive, test pattern generation, TLM receive, UART, Spin Sync logic, S/C time circuit. Tristate logic and 100 ohm resistors allow test patterns when certain boards are missing.

THEMIS Instrument PDRGSE- 10 UCB, October 15-16, 2003 Defect Tracking NASA-compliant Defect Tracking Themis PFR (Problem Failure Report) Template file supplied with GSE software front end. Tracks suspected problems with Themis, FSW, GSE, interface boards, ITOS, MOC… Prioritized Cognizant Engineer is always assigned to an entry (until it’s resolved) Mission Assurance Holds Original & Tracks to Closure

THEMIS Instrument PDRGSE- 11 UCB, October 15-16, 2003 Schedule GSE-related target dates DFB breadboard 10/27/03 (no UCB GSE planned) EFI boom calibration 11/03 PCB ETU 12/08 DCB ETU 12/15 ETC ETU 12/15 BEB (actel) ETU 1/2/04 FGE ETU 1/20/04 (no UCB GSE planned) LVPS 1/23/04 IDPU ETU 4/13/04

THEMIS Instrument PDRGSE- 12 UCB, October 15-16, 2003 Schedule I&T Flow

THEMIS Instrument PDRGSE- 13 UCB, October 15-16, 2003 Issues Shared Facilities Configuration control Upstairs Vacuum chamber Downstairs Vacuum chamber Tight resources for building GSEs Layout personnel Technicians FPGA engineers GSE programmers