Research activities at ITA for future accelerator M. C. Esteban.

Slides:



Advertisements
Similar presentations
ELECTROMAGNETIC COMPATIBILITY Dr. Donald Church Senior Staff Engineer International Rectifier Automotive Systems November 17, 2005.
Advertisements

SWITCH-MODE POWER SUPPLIES AND SYSTEMS Silesian University of Technology Faculty of Automatic Control, Electronics and Computer Sciences Ryszard Siurek.
5 th ILD Workshop Orsay, 23 rd -25 th May 2011 D. Moya, J. Duarte, I. Vila, A. Ruiz - IFCA (CSIC-UC) F. Arteche, C. Esteban - ITA Strip FTD Readiness for.
DC/DC Converters Markus Friedl (HEPHY Vienna) B2GM, 14 March 2012.
Development of a DC/DC converter for low voltage power distribution in LHC upgrades. Stefano Michelis Supervisor: Federico Faccio ELACCO mid-term review.
Designing a EMC Compatible Electronic Meter using AD7755 a.
FTD-ILD sub-detector power distribution system prototype based on Supercapacitors I.Echevarria, M. Iglesias, A. Pradas, FJ. Piedrafita, Dr. F. Arteche,
FHSS vs. DSSS Presented by Ali Alhajhouj. Presentation Outline Introduce the issues involved in the system behaviors for FHSS and DSSS systems used in.
Powerline Communications: Channel Characterization and Modem Design Yangpo Gao Helsinki University of Technology
Current research work and plans Zbigniew M. Jóskiewicz Wroclaw University of Technology Institute of Telecommunication and Acoustics Wybrzeże Wyspiańskiego.
EMC Technology Roadmapping: A Long-Term Strategy Marcel van Doorn Philips Applied Technologies EM&C Competence Center Eindhoven, The Netherlands, March.
Tullio Grassi ATLAS–CMS Power Working Group 31 March 2010 DC-DC converters and Power Supplies requirements for CMS HCAL Phase 1 Upgrade.
EMC review for Belle II (Grounding & shielding plans) Sub-systems ( XXXXX)
Chip tag A radio-frequency identification system uses tags readers send a signal to the tag and read its response RFID tags can be either passive active.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
ITAINNOVA TA: Scientific & Administrative issues Electromagnetic Compatibility Facility for electronics noise and grounding diagnostics (WP12 – Task 12.2)
DC/DC Converter Update Markus Friedl (HEPHY Vienna) B2GM, 22 July 2012.
Electromagnetic Compatibility of a DC Power Distribution System for the ATLAS Liquid Argon Calorimeter G. BLANCHOT CERN, CH-1211 Geneva 23, Switzerland.
Switched capacitor DC-DC converter ASICs for the upgraded LHC trackers M. Bochenek 1,2, W. Dąbrowski 2, F. Faccio 1, S. Michelis 1 1. CERN, Conseil Européen.
F. Arteche, C. Esteban Instituto Tecnológico de Aragón D. Moya, I. Vila, A. L. Virto, A. Ruiz Instituto de Física de Cantabria Powering requirements and.
Recirculation Concept - Cyclotron Radio frequency alternating voltage Hollow metal drift tubes time t =0 time t =½ RF period D-shaped.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
Origin of Emission and Susceptibility in ICs
ALICE DCS Workshop 28/29 May 2001 Vito Manzari, INFN Bari SSD (Silicon Strip Detector) SDD (Silicon Drift Detector) SPD (Silicon Pixel Detector) Detector.
Overview of the ATLAS Electromagnetic Compatibility Policy G. BLANCHOT CERN, CH-1211 Geneva 23, Switzerland 10th Workshop on Electronics.
MICAS Department of Electrical Engineering (ESAT) Design-In for EMC on digital circuit December 5th, 2005 Low Emission Digital Circuit Design Junfeng Zhou.
Power Distribution Existing Systems Power in the trackers Power in the calorimeters Need for changes.
Work Package 3 On-detector Power Management Schemes ESR Michal Bochenek ACEOLE Twelve Month Meeting 1st October 2009 WPL Jan Kaplon.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
CLIC and ILC Power Distribution and Power Pulsing Workshop Summary Document 10/5/2011G. Blanchot1.
Electromagnetic Compatibility Test for CMS Experiment. Authors C. Rivetta– Fermilab F. Arteche, F. Szoncso, - CERN.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
D. Nelson October 7, Serial Power Overview Presented by David Nelson
Pixel Endcap Power Distribution Phase 1 Upgrade Plans Fermilab, University of Mississippi, University of Iowa Lalith Perera University of Mississippi CMS.
Prof R T KennedyEMC & COMPLIANCE ENGINEERING 1 EET 422 EMC & COMPLIANCE ENGINEERING.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
F. Arteche EMC issues for Tracker upgrade. 1 de 19 CMS / ATLAS Power working group Paris- France, 23 September 2009 OUTLINE 1. Introduction. 2. EMC strategy.
System implementation of a power distribution scheme based on DC-DC converters F.Faccio, G.Blanchot, S.Michelis, C.Fuentes, B.Allongue, S.Orlandi CERN.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
A common 400 Hz AC Power Supply Distribution System for CMS FEE. Authors C. Rivetta– Fermilab. F. Arteche, F. Szoncso, - CERN.
Compilation of Dis-/Advantages of DC-DC Conversion Schemes Power Task Force Meeting December 16 th, 2008 Katja Klein 1. Physikalisches Institut B RWTH.
F. Arteche, C.Esteban, (ITA) I.Vila(IFCA) Electronics integration studies for CMS tracker upgrade.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
DC-DC Conversion Studies – Status Report from Aachen Tracker Upgrade Power WG Meeting February 13 th, 2009 Lutz Feld, Rüdiger Jussen, Waclaw Karpinski,
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Preliminary conducted noise test results for LV power supplies Bruno Allongue CERN-PH-ESS Fernando Arteche Imperial College – CERN 21 January 2005.
Rd07 Conference th June 2007 Florence, Italy 1 High frequency stepdown DC-DC converter with switched capacitors This work is part of the INFN DACEL.
Power Supply & Electrical Engineering for sustainable science
F. Arteche EMC studies for CMS tracker upgrade Status & Plans.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
Power Working Group Summary Magnus Hansen. Introduction Most recent session at TWEPP11 TWEPP11 participant comments in the direction of: – Rather an extension.
Noise propagation issues in complex power cables for HEP detectors M. Iglesias, I. Echeverria,F. Arteche 12 th Meeting of the Spanish Network for future.
Dr.F. Arteche EMC DEPFET Project: A general overview.
Dr. F.Arteche Instituto Tecnológico de Aragón (ITA) Belle II: Grounding and Electronics Integration Issues.
PXD – DEPFET PS noise emission tests Mateo Iglesias Fernando Arteche.
EMC issues for cabling and racks layout design. (Belle II – Grounding) F.Arteche.
F. Arteche EMC: Electronics system integration for HEP experiments (Grounding & Shielding)
1 S. Michelis Inductor-based switching converter for low voltage power distribution in LHC upgrades S. Michelis, F. Faccio, A. Marchioro – PH/ESE/ME Twepp07.
EMC review for Belle II (Grounding & shielding plans) PXD system - July 2012 Dr. Fernando Arteche.
Piero Belforte, CSELT 1999: AEI_EMC_, EMC basics by Flavio Maggioni.
ILD Silicon Tracking Status Report
FTD Powering and technological Demonstrator manufacture
Vertex Detector Mechanical R&D Design Questions and Issues
AIDA WP12.2 : Detector Characterization Facilities EMC characterization Fernando Arteche.
EMI studies of different switched converters: setup and lessons learnt
Compilation of Dis-/Advantages of DC-DC Conversion Schemes
Powerline Communications: Channel Characterization and Modem Design
Authors C. Rivetta– Fermilab. F. Arteche , F. Szoncso, - CERN
Presentation transcript:

Research activities at ITA for future accelerator M. C. Esteban

1 Outline Introduction ILC:FTD detector –Activities –Projects & contributions SLHC: CMS Tracker upgrade detector –Activities –Projects & contributions SuperKEKB: DEPFETdetector –Activities –Projects & contributions ITA HEP group

2 Introduction ITA has been working in HEP since 2008 Two main working areas: –Electromagnetic compatibility issues EM noise characterization of new technologies for HEP –Power supply distribution systems Several topologies has been studied –Serial powering & DC-DC powering (SLHC) –Power pulsing (ILC) Both issues (EMC & PS) have been tackle at the same time to ensure the correct integration of electronics at system level –It will help to implement a robust system by design

3 Introduction Our work has been focused on three future accelerators: –ILC: Sub-detector FTD (ILD) –SLHC : Sub-detector Tracker upgrade (CMS upgrade) –SuperKEKB: Sub-detector DEPFET (Belle II)

4 ILC: FTD detector The mstrip-FTD system is a silicon strip tracker located in the innermost part of the tracker region of the ILD. It constitutes of 10 disks.

5 ILC: FTD detector Main working areas : A. Power supply distribution design: Power estimation B. Analysis of power pulsing effects in the power supply distribution system: Transients EMI The analysis of both powering aspects will define the optimal power supply topology

6 ILC: FTD detector - Main Power design parameters A. Power consumption : –The total number of strips is higher than a million Non –uniform distribution –Total current consumption of FTD is around 650 A Currents consumption of FTD per power group MIDDLE PITCH FTDFTD3FTD4FTD5FTD6FTD7 TOPBOTTOPBOTTOPBOTTOPBOTTOPBOT I2.5 (A) per PG I1.25 (A) per PG Power Groups44444 TOTAL FTD Power groups 40

7 ILC: FTD detector - Main Power design parameters B. Analysis of power pulsing effects in the power supply distribution system: The ILC accelerator has a duty cycle of 0.5% –1 ms bunch train every 200ms If the power demanded by the FEE is synchronized to the bunch train, it helps to save energy – Energy dissipated will be lower However several important issues have to be considered during the design of the power system: –Transient phenomena –EMI phenomena All these phenomena have an impact in the design of the power supply distribution system –Topology –Cooling and material budget

8 ILC: FTD detector - Main Power design parameters Transients Voltage Voltage compensation may be required –Cable resistance Over-voltages and Voltage dips may be present –Cable inductance Power consumption 1 ms bunch train every 200ms V= 1,25 V; I= 12 A

9 ILC: FTD detector - Main Power design parameters EMI The synchronization of the FEE power operation with the bunch crossing introduces a current periodic signal with a spectra content in the power supply system. The spectra content varies between few Hz up to several hundreds of kHz LF- Problematic due near field : Magnetic field –Every 5 Hz a pulsing magnetic field higher than 0.2 A each Itotal = 40 x 0.2 A = 8 A –It may cause mechanical problems Vibrations – wire bounding degradation

10 ILC: FTD detector - Power supply topology There are several topologies that may be implemented in the FTD. –DC-DC based power distribution –Local LV RAD-hard regulators –Remote power supply Each of them has advantages and disadvantages We consider DC-DC as the first option of analysis: –To absorb transients associate to power pulsing system. Keep transients locally at FEE level. Low currents before DC-DC due to converter ratio –Low transients –Synergy with SLHC and new DC-DC hard-rad design. HF noise & Rad issues

11 ILC: FTD detector - Power supply topology

12 ILC: FTD detector – Projects & Contributions FTD detector studies since 2011 Projects –I+D en Detectores para Futuros Colisionadores: FPA C02-01 (Ip: I.Vila) Estudios de EMC en nuevos detectores –ITA HEP activities ( ) Contributions –Linear Collider Power Distribution and Pulsing workshop May in Paris (LAL Orsay). “Powering requirements and constraints of the Mstrip-FTD detector” –Oral presentation

13 SLHC: CMS Tracker upgrade New FEE requirements forces to install DC-DC converters close to FEE (inside sub-detector modules). –The high current demanded by each power channel Low voltage : 2.5 V change to 1.1 V (Power is ≈ constant) It is defined by chip technology (250nm → 130 nm) However DC-DC converters are a very noise source –It is necessary minimize the noise coupling between FEE – DC-DC units –It is necessary to minimize the total noise inside sub-detector volume A large R&D effort is planned and taking place to develop a DC-DC switching converter to operate under high magnetic field with low noise emissions inside tracker volume –However a EM noise studies at system level are required Today Upgrade / Future detectors

14 SLHC: CMS Tracker upgrade Main working areas : Electromagnetic compatibility issues (EMC) Grounding & shielding issues (G&S) Power aspects (PS) –Serial & DC-DC converters evaluation

15 SLHC: CMS Tracker upgrade Working line details –Study and analysis of noise generation and distribution at the system level and define critical points of the system integration strategy. Power network impedance effects on noise emissions of DC- DC converters Study of noise propagation effects in power network. Noise immunity test in FEE prototypes. –Definition of FEE immunity levels »New and/or old FEE Radiation effects on EM noise emissions of DC-DC converters The main goal of these studies is to establish the EMC rules to be applied during the design and integration of the tracker sub-system up-grade. –Define a robust topology of Tracker upgrade system by design

16 de 27 SLHC: CMS Tracker upgrade – EMC characterization of FEE SIMULACION MEDIDAS MATLAB COMSOL 16 EMC characterization of FEE Old Tracker

17 SLHC: CMS Tracker upgrade – PN impedance effects Power network impedance effects on noise emissions The aim is to define and characterize the impedances connected to the DC-DC power converter It defines the noise (conducted and radiated) levels emitted by the DC-DC power converters AT SYSTEM LEVEL Characterization of the electromagnetic environment –Impedances ( FEE & Power Bus) –Multiple units

18 Introducción SIMULACION MEDIDAS MODELO REAL SLHC: CMS Tracker upgrade – PN impedance effects

19 SLHC: CMS Tracker upgrade – Project & Contributions S LCH detector upgrade studies since 2008 Projects –I+D en Detectores para Futuros Colisionadores: FPA C02-01 (Ip: I.Vila) –EMC immunity studies for CMS tracker upgrade - CMS9.04: Ip (F.Arteche e I.Vila) – ( ) –I+D en detectores y estudios fenomenológicos para el colisionador Lineal Internacional : FPA2007 – (Ip: I Vila) - ( ) –ITA HEP activities ( )

20 SLHC: CMS Tracker upgrade – Project & Contributions Conferences TWEPP 2008, September, Naxos (Greece) –“Detector noise susceptibility issues for the future generation of High Energy Physics Experiments”. TWEPP 2009, September, Paris (France) –“Interference coupling mechanisms in Silicon Strip Detector – FEE - CMS tracker “wings”: A learned lesson for SLHC”. –“DC-DC switching converter based power distribution vs Serial power distribution: EMC strategies for tracker upgrade TWEPP 2010, September, Aachen (Alemania) –EMC studies for CMS tracker upgrade.Status & Plans JCR paper –Global noise studies for CMS Tracker upgrade, Journal of Instrumentation Dec Workshops –CMS power task force meetings –ATLAS & CMS upgrades meetings –Tracker upgrade meeting – Power group

21 SuperKEKB : DEPFET detector – Belle II FEE (Sensor, DCD,DHP,DHH) –It may be sensitive to EM noise –It may radiates ( HF clocks and signals) Power supplies –It emits EM noise Cable & connectors –It may propagate EM noise inside/outside FEE area

22 SuperKEKB : DEPFET detector – Belle II Main working lines are: –To systematically approach the grounding design –To quantify the immunity /emission of the electronic systems. The main goal is: –Conduct studies and measurements to establish a map of EM emissions and susceptibilities of sensitive electronics. Safe DEPFET electronics integration. This is the first time that this kind of mapping will be implemented in a pixel detector –Studies conducted previously in Trackers and calorimeters

23 SuperKEKB : DEPFET detector – Belle II Main activities: –Grounding and shielding strategy for DEPFET: Coordination & Policy –Immunity issues of DEPFET FEE: Susceptibility curves of DEPFET system. –Noise emissions of PS units: FEE noise immunity and PS noise emission coordination –Noise coupling path characterization between FEE and Power units: Noise propagation issues

24 SuperKEKB : DEPFET detector – Immunity issues of DEPFET System The main goal of this activity is to define the susceptibility level of DEPFET FEE to –Radio frequency perturbation –Transient perturbation. A set of test will be performed in an EMC unit –Immunity test to RF disturbances –Transients immunity test

25 SuperKEKB : DEPFET detector – Immunity issues of DEPFET system This EMC unit is defined by the minimum structure that may obtain good results to extrapolate results for the whole detector (same topology) CMS Tracker: 1Petal (6000 channels) CMS HCAL: 1RBX (12 channels) …¿¿DEPFET ??... 1 Module /half ? Power supply DAQ system.. Test set –up preparation complex

26 SuperKEKB : DEPFET detector–Projects & Contributions DEPFET project since 2010 Projects –I+D en Detectores para Futuros Colisionadores: FPA C02-01 (Ip: I.Vila) –EMC studies for DEPFET pixel detector, Research project – Max-Planck Institute & ITA ( ) –ITA HEP activities ( ) Contributions –4th International Workshop on DEPFET Detectors and Applications, Ringberg Castle,- 2-5 May 2010 Grounding & Shielding: Main issues (Oral presentation) –7th International Workshop on DEPFET Detectors and Applications, Ringberg Castle, May 2011 EMC DEPFET Project: A general overview (Oral presentation)

27 ITA - HEP group The HEP studies at ITA are carrying out by Electrical engineering group. –Electromagnetic compatibility characterization & electronics integration. –Developing new solutions to optimize the energy efficiency and performance of systems mixing new technologies. Team coordinator: –Dr. Fernando Arteche Close collaboration with other groups involved in HEP detectors designs –SPAIN CNM & IFCA –Abroad Max-Plank Institute, CERN, Aachen, FERMILAB & SLAC

28 ITA - HEP group EMC - Facilities –Faraday cage –One semi-anechoic chamber –Spectrum analyzers –Current probes & Antennas –Surge & Burst & ESD generators –Amplifiers (kHz-GHz) Electronic Lab - Facilities –Boards designs –Power supplies –Programming controllers Sofware –Pspice –Matlab –COMSOL

29 ITA - HEP group FUTURE …. New 10m Semi- Anechoic Chamber !!!! (Inves. 1.5 M€- 2012) – APPROVED