Sussex Energy Group SPRU - Science and Technology Policy Research The Economics of New Nuclear Build Presentation at the Nuclear Consultation Group Westminster.

Slides:



Advertisements
Similar presentations
An Overview of the Development of a Renewable Energy Project And the 5 Major Milestones to Achieve Financing By Robert Hunter Director of Operations, Green.
Advertisements

ESRC SEMINAR THE INTRODUCTION OF THE UK RENEWABLES OBLIGATION University of Bath, 9 May 2008 Iain Todd Renewable Energy Consultant.
Leaders in the design, implementation and operation of markets for electricity, gas and water. Portfolio Generation Investment Under Uncertainty Michael.
The Single Electricity Market in Ireland
1 Capacity mechanisms - IFIEC position June 12 th 2012.
1 The Northern Ireland Energy Agenda Regulator’s Briefing 24 April 2008.
Dr Paul Dorfman Nuclear Consultation Group Helsinki, 8 May 2009 High Burn-up Radioactive Spent Fuel.
Electricity Price Breakdown Fix at premium or Pass Through.
1 AEP Perspectives on Development and Commercialization of CCS Technology for Natural Gas Power Generation Matt Usher, P.E. Director – New Technology Development.
Commonwealth Utilities Corporation Alan W. Fletcher Executive Director.
Licence lite – a new route to market for smaller electricity generators / suppliers Robert Tudway Decentralised Energy Project Delivery Unit Greater London.
Acumen7 1 Accelerating UK Nuclear New Build Tony Roulstone July 2006.
Kansas Renewable Energy and Energy Efficiency Conference Wind 2007 RFP Update John Grimwade - Sr. Director Strategic Planning and Development September.
Bringing about beneficial change... POLICY DIALOGUE ON CORPORATE GOVERNANCE IN CHINA Presentation by Patricia Leahy, Director, UK National Audit Office.
UNRESTRICTED Financing of Nuclear Power Ala Alizadeh Atomic Energy of Canada Limited Nuclear Infrastructure Milestones Workshop November 2007 IAEA - Vienna.
UK Nuclear Policy Andrew Beirne
David Schlissel and Cathy Kunkel When, Not If: Bridgeport’s Future and the Retirement of PSEG’s Coal Plant January 23, 2014.
Recent Trends in Energy Regulation IEA-FTS of Russia Workshop on Global Energy Market Scenarios Paris, 28 May 2009 Kieran McNamara Country Studies Division.
PRME Seminar “Responsible Management of GHG Emissions” Fri 14 October 2011 Gujji Muthuswamy Department of Management Faculty of Business and Economics.
“Mini Nuclear Reactors in Vietnam” The Babcock & Wilcox Company (B&W) James Dowd, Amol Kasbekar, Mark King, Michael Strosnider, & Tim Yee STRT International.
Regulatory Barriers to the Adoption and Diffusion of Stationary Fuel Cells in Ohio William M. Bowen Professor, Public Administration and Urban Studies.
What is killing the Nuclear Renaissance? Presentation at 10th IAEE European Conference Vienna, September 7-10, 2009 Steve Thomas
Clear Thinking on Nuclear: New Plant Construction Nuclear energy is dependable, affordable, and environmentally sound. Nuclear energy is needed to meet.
Financing new electricity supply in the UK market with carbon abatement constraints Keith Palmer 08 March 2006 AFG.
Cheap Affordable Coal? Case Study: Tata Mundra Justin Guay, World Bank AGM, 2013.
The Nuclear Option Dr Robert Hawley CBE, FRSE, FREng.
“NUCLEAR POWER IN UTAH: COSTLY, RISKY AND UNNECESSARY” By Matt Pacenza, Policy Director HEAL Utah.
Small Farm Profitability: Is Wind Energy the Answer? 1
R EPROCESSING S PENT N UCLEAR F UEL IN I NDONESIA : A N O VERVIEW OF A REVA ’ S O PPORTUNITY FOR FDI.
The California energy crisis Introduction (Wolak March ‘01) –Wholesale: averaged $33 MWH in 1999, $116 MWH in 2000, $310MWH Jan –Natural gas $3-$4.
1 03/19/15 | Philomathia International Energy Forum Science & Technology for Carbon-free Alternatives at the Right Price.
World Nuclear Association 38th Annual Symposium September 2013, Central Hall Westminster, London Nuclear Operation and Radioactive Waste Management.
Dr. Fatih Birol Chief Economist Head, Economic Analysis Division International Energy Agency / OECD WORLD ENERGY INVESTMENT OUTLOOK.
 What financial sources are used to securing financing to start/operate a business? ◦ Personal Savings ◦ Bank Financing ◦ SBA Loans ◦ Venture Capital.
The PBMR, Nuclear Power and Climate Change Thomas Auf der Heyde Technikon Witwatersrand.
Having an independent Non- Executive Director on your board is essential for growth Bryan Foss Independent Non-Executive Director, Risk & Audit Chair,
1 Rudolph/Libbe Solar. 2 Our Perspective on Solar in Ohio  Ohio has the foundation for rapid solar growth (distributed generation) – Existing electrical.
U.S. REC Market Insight RPS and Voluntary Market Interaction Alternative Energy Conference LSU March 2-3, 2004 Jason Tournillon Environmental Market Services.
1 An economist and energy regulation Pippo Ranci Professor of economic policy, Università Cattolica, Milano Director, Florence School of Regulation Course.
Electric Restructuring In Pennsylvania Sonny Popowsky Pennsylvania Consumer Advocate May 10, 2007 Institute for Regulatory Policy Studies Transforming.
GB Electricity Market Reform: The implementation challenges ahead IAEE International Conference Stockholm, June 20 – Dorcas Batstone
Sussex Energy Group SPRU - Science and Technology Policy Research Climate change mitigation and transforming the UK energy system Jim Watson Director,
The University of Greenwich Teaching excellence for 100 years Is new nuclear build justified? Press Conference on the need for an Independent Inquiry March.
STRUCTURE OF PRESENTATION 1. Energy Policy goals and Review remit 2. Key challenges 3. Conclusions and Impact 4. Next Steps/Issues 1.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
Context, Principles, and Key Questions for Allowance Allocation in the Electricity Sector Joint Workshop of the Public Utilities Commission and Energy.
UK Parliamentary Committee Report on PFI (PPP) August 2011 All PFI projects have to complete a Value for Money (VfM) assessment of the PFI option compared.
Commercial Matters Dublin Waste to Energy Project.
DO ELECTRICITY MARKETS INTERNALISE SUPPLY RISK? DAVID PEARCE.
Advise | Design | Integrate | Deliver Subcontractor fee structure – FND Phase 1 Manchester 8 th June 2009.
Integrated Used Nuclear Fuel Management Regulatory Information Conference U.S. Nuclear Regulatory Commission March 11, 2009 Steven P. Kraft Senior Director.
Structuring Electricity Markets Lester B. Lave Electricity Industry Center Carnegie Mellon University January 10, 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
E8-GEF-UNDESA-UNESCAP Financing Sustainable Electrification HCB Initiative South-East Asia Dialogues, September 8-10, 2009, Bangkok, Thailand e8-GEF-UNDESA-UNESCAP.
Nuclear power: A cheap option? Westminster Keynote Seminar October 19 th 2009, Portcullis House Steve Thomas PSIRU (
Economic Environment of Business Privatisation and Deregulation: The case for and against.
Finding a Reasoned Path Forward in an Uncertain Environment William H. Downey, President & COO June 2010.
The PIU Energy Review and the Energy White Paper.
Infrastructure planning in the UK – old and new stories November 2010.
FUEL POVERTY – NATIONAL PRIORITIES FOR ACTION Maria Wardrobe Acting Director of Communications NEA.
GETTING ENOUGH COAL: MORE THAN A THREE LEGGED STOOL DAY ONE KEYNOTE: NOVEMBER 2, 2006 COAL NEEDS POWER COMPETITION TO SUCCEED John E. Shelk.
Extra electricity slides
It Is a Moral Issue – Why We Should Say ‘No’ to Nuclear Andrew Blowers Presentation at Thornbury, November 2010.
Westminster Energy Environment & Transport Forum Nuclear Energy 27 Oct 2010, Princess Alexandra Hall London Dr Paul Dorfman Continuing concerns: safety.
Construction & property consultants A Journey through EXTRA CARE Breakout Session – Procurement – Best Practice and Innovations Chris Bovis, Douglas BeckwithApril.
Nuclear Power Economics and Project Structuring 2017 Edition
The cost of nuclear power plants l
Sustainability-oriented EU Taxes: A European Nuclear Power Tax
Time to cancel Hinkley Point C
14th September 2018 Caroline Kuzemko Assistant Professor IPE
Presentation transcript:

Sussex Energy Group SPRU - Science and Technology Policy Research The Economics of New Nuclear Build Presentation at the Nuclear Consultation Group Westminster Keynote seminar, Wilson room, Portcullis House 19 October 2009 Professor Gordon MacKerron Director, SPRU, University of Sussex

Sussex Energy Group SPRU - Science and Technology Policy Research The old economics of new build (pre-1990) Monopoly utilities built reactors – costs over-ran Electricity prices were determined by utility costs So extra costs were passed straight through to customers …..and customers bore all the financial risks

Sussex Energy Group SPRU - Science and Technology Policy Research The economics of new build c.2008 Privatisation also brought liberalisation = (some) competition Electricity price now fixed in a market, independent of utility costs So if a nuclear plant has a cost over-run, and its costs exceed market price of electricity, it loses money this is why the City told new generators not to build new nuclear plant – collapse of the ‘small family’ of 4 (originally 10) PWRs …..and why no-one was interested for next 15 years or so

Sussex Energy Group SPRU - Science and Technology Policy Research The economic risks now: construction Any proposed reactor for the UK (EPR or AP) will be the first-of-a-kind here Its precise design/safety features are for UK regulatory determination Costs of construction will vary substantially depending on the number of reactors to be built Costs will also vary depending on construction time, which may be affected by public opinion/pressure For all these reasons, vendors will not be willing to offer fixed-price contracts Overall conclusion: we do not know how much new reactors will cost, with risks much greater on the side of over-runs

Sussex Energy Group SPRU - Science and Technology Policy Research The economic risks now: market risks To make a case for nuclear, you have to know your revenue stream = future price of electricity for years ahead In GB market, suppliers (retailers) of electricity unwilling to commit to long-term contracts Even where the supplier is also the generator, no-one knows the market price in years’ time, so revenue stream is indeterminate BUT this could be fixed by changing the market rules – and note that both OFGEM and the Climate Change Committee have recently argued that current market needs radical overhaul to suit both nuclear AND renewables

Sussex Energy Group SPRU - Science and Technology Policy Research The economic risks now: waste Waste and decommissioning historically very expensive (£70bn. - £100bn.) Future waste management simpler if, as assumed, no reprocessing But radical cost uncertainty, as long-term management route not clear Hence Government proposal for ‘fixed unit price’ at which Government takes ownership of waste - potentially a subsidy Waste costs unlikely to to a show-stopper for new build

Sussex Energy Group SPRU - Science and Technology Policy Research Waste: the politics Potential show-stopper in relation to waste not economics but politics CoRWM recommended eventual geological disposal for legacy waste Government has conflated this with strategy for new build waste New build waste raises different political, social and ethical issues – question is not ‘least worst’ but ‘what are the alternatives to creating new waste’? No debate along these lines In any case we have not yet met the ‘Flowers criterion’ from not to agree to new build until a clear route for final management of [any] waste exists

Sussex Energy Group SPRU - Science and Technology Policy Research Conclusions New build remains a risky proposition Everyone agrees that it needs ‘support’ – question is when does ‘support’ turn into ‘subsidy’ Note Aldersgate view that need is for “instruments that reduce investor risk” Rule of thumb: if risks are simply transferred – usually to customers – then it’s subsidy Long and tortuous debates ahead about support and subsidies