Buoy mooring at Stockholm ström. Wind restrictions anchoring at Strömmen.

Slides:



Advertisements
Similar presentations
AIS Advanced Identification System VHF Transponder Target Name – Official Number Speed Range CPA – Closest Point of approach TCPA – Time of CPA.
Advertisements

5 Insurance Coverages Every Harbor Master Should Know.
Waves.
Anchoring in Designated Position
No Runners On Hit to Infield Base Umpire: When the ball is hit, move parallel to the baseline toward 1B without taking your eyes off the ball to a position.
Place nozzle on hose and fold over about 4 to 6 inches past each end of pack. High-rise Pack Loading.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
® 1 Seamanship Chapter 6 Anchoring, Mooring and Rafting.
Mooring of ships - forces
The Evolution of a New Mooring System for Ultra-Deep Waters By Charles N. White Strategic Offshore Solutions – Houston Fall.
Emergency Response Service IASST Safety Seminar September the 20 th 2010 Alexis CARAUX Head of Emergency Response Service.
USS Abraham Lincoln CVN-72 Everett, WA preparing for next cruise < 20mm Phalanx CIWS MK29 Sea Sparrow SAM Launcher > A private tour with Vern.
ECE 201 Circuit Theory I1 Maximum Power Transfer Maximize the power delivered to a resistive load.
Chapter 5 : Effect of the Wind. Ch5. Effect of wind mostly experienced when proceeding at slow speeds can create major problems when: -During river passages.
Terms you need to know on the water!
Anchor Handling Changes. Basic Idea Barge with HYPACK SURVEY Tug 1 Tug 2 Tug 3 Home Office GPS & HDG WEBIF Or SURVEYVIEWER All vessels can see each other.
TRACKBACK rescues 22 ton digger from the mud. We got an anxious call from a contractor. His digger was stuck and he had heard about some innovative equipment.
OBJ: SWBAT: Model with Vectors HW: 5.4 Modeling with Vectors Part Vectors (Part 4) Unit 1.
Rudyard Lake Sailing Club Towing & Being Towed. Fault Finding – Can we fix it? Engine Won’t Start / Has Cut Out Engine Won’t Start / Has Cut Out – Have.
Adapted from Skračić,T., „Waypoint”
OPERATING YOUR BOAT SAFELY OPERATING YOUR BOAT SAFELY.
Boating Vocabulary Aft – towards the back of the boat.
Page 1 CONSULTANCY AND RESEARCH IN AQUACULTURE AND THE AQUATIC ENVIRONMENT A Company in the NIVA-group Methodology for Environmental monitoring of aquaculture.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
1 IRPCS Rules, lights, shapes and sounds. 2 Rules - Lookout Sight, sound, VHF, Radar, AIS Sight, sound, VHF, Radar, AIS Watch blind spots Watch blind.
Industry Fundamentals and Occupational Safety Unit 6
1 “ U.S. Aids to Navigation – Road Signs of the Waterways”
Petroleum Engineering 406 Lesson 9b Station Keeping.
Objective: Review. Warm up 1. An average classroom measures 20 ft X 30 ft X 10ft. If the maximum capacity of a room this size is 45 students, what is the.
 LOCATION: -Located on the left side of Thi Vai river, 5 km from the confluence of Cai Mep Thi Vai and 29.7km (18 NM) away from the “ zero” bouy of Vung.
Sail Course ® Section 19, Docking and Anchoring. Sail Course ® Figure 19–1 Docking under Sail.
At about 0615H in pos. Lat N E while the ship was at Alexandria Anchorage, M/V UNION BIENVENIDO Majuro Flag Call sign V7XR3 was observed.
Projectile Motion. What Is It? Two dimensional motion resulting from a vertical acceleration due to gravity and a uniform horizontal velocity.
Mechanics of Materials – MAE 243 (Section 002) Spring 2008 Dr. Konstantinos A. Sierros.
Boating and Safety Boating safety- describe Alabama’s boating laws, basic vessel operation, required boating equipment, and possible hazards involved in.
ELECTRICAL DESIGN GUIDELINE STEPS Maria C. Gonzalez.
Chapter 4 MOTION IN TWO DIMENSIONS. Two dimensions One dimension Position O x M x x y M Path of particle O x y.
United States Power Squadrons ® B B Getting Underway Wind Toward The Pier.
Power Practice Problems
SERPENTINE COURSE Develop relationships to fixed objects while maneuvering to port/starboard. Become familiar with the steering capabilities of the vessel.
Henry "Bo" Edwards John Truong Tran Phong Ngo Huy Nguyen Brian Hoffman Ben Aune Midterm Presentation July 12, 1999.
Applying Safety Rules can save your life and the lives of others Csm15 jun 03 1 Vehicle Towing Incident 27 May 2003 at Hawqa A briefing pack for drivers.
Anchoring (wind over tide) 1.Pick a safe place – protection, tides (clearance), holding (anchor type –v- sea bed); room (swing gets larger as sea level.
QM-8 QuartermasterAnchoring Instructors: George Crowl.
Homework Questions. Applications Navigation and Force.
ALOKRAJ. V - NA07B004. General All deck machinery and construction equipment are to be supplied and installed to meet classification, intended operational.
1.A ladder is leaning against a wall. The top of the ladder is 15ft up the wall. If the angle between the base of the ladder and the ground is 43 degrees,
Basic Boat Handling 1. Can undertake appropriate pre-start checks on the engine and hull. 2. Can start and stop the engine. 3. Can steer the boat ahead.
Calculations D. Smargianaki 29/04/2015 LBNF. Outline D. Smargianaki(CERN) 2 29/04/2015 Comparison between Single Beam & Beam with Spliced connections.
VESSEL SETTINGS. Vessel Functions Each mobile can have separate settings for each Area Map. Main Vessel (designation) Display Shape (toggle) Select Shape.
Goddard Sailing Association Hunter 27 Cruiser Qualification Course 1.
International Maritime Organization Polar Code
Duct Design Basics Lesson 4. Knowledge & Skills for Manual D 4.1.
Contact Point Agent:Operating company: Stevedore:Harbor Master: Liner:Japan Coast Guard: Tug Company:Other: Earthquake, Tsunami is occur r red !! Earthquake.
Snag Boat Final Presentation
Mooring operation at Strömmen
Mooring operation at Strömmen
LOOK AT THIS PICTURE FOR FIVE SECONDS
Your Boat’s Wake You are responsible for damage caused by your wake
PRESENTATION TITLE – 32 pts
كار همراه با آسودگي و امنيت
Solving Systems of Equations
High-rise Pack Loading
Unit 3 Review (Calculator)
Mooring operation at Strömmen
Instructors: George Crowl
Ch-4 Help-Session.
Shin Tape.
Calculate 9 x 81 = x 3 3 x 3 x 3 x 3 3 x 3 x 3 x 3 x 3 x 3 x =
8-2B: Vectors Name:_________________ Hour: ________
Presentation transcript:

Buoy mooring at Stockholm ström

Wind restrictions anchoring at Strömmen

The positions for the anchors are calculated from the mooring bouy´s positon in the chart and can be presented in the chart and/or given to the mooring boat for an optical heading

At certain wind and current conditions, the ship drift southward during the approach Connect the tugboat aft with tugs line

Manoeuver towards the mooringboat Before the anchor drops, the mooringboat will move toward the other anchor position

After the first anchor has been dropped, move the ship to the other anchor position. 7.5 shackles will be used to reach second anchor position.

Max two lines at the same time for the mooringboat The mooringboat will avoid working under tight lines When the other anchor has been dropped, the tugboat will assist/tow the ship to the buoy

Maximum 6 lines can be used for mooring The bouy is equipped with AIS and quick release hooks maximum work load for the bouy is 220 tons, the anchor chain is the limitation for the bouy

Well moored at Strömmen 5 Schackels Distance buoy – Ship 30-40m Drift of buoy 45 m The bouy will pitch when the lines are tighted