Inter-Regional Co-ordination and Harmonization Mechanisms Harmonization of Air Navigation Systems Presented by MID Region.

Slides:



Advertisements
Similar presentations
Regional RAIM Prediction System – Progress Report
Advertisements

AMHS/SWIM Seminar Chiang Mai, Thailand 5-6 March 2012
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Technical Co-operation Challenges Why ? Capabilities of existing Brazilian Institutions.
ICAO EUR/NAT PBN Regional Implementation
Briefing on APANPIRG Priorities and Targets
Presented by United Arab Emirates MID ATM ENHANCEMENT PROGRAM (MAEP) MANAGEMENT PROPOSAL.
Global Air Navigation System ~ Planning Mechanisms ~ H.V. SUDARSHAN H.V. SUDARSHAN International Civil Aviation Organization International Civil Aviation.
H.V. SUDARSHAN H.V. SUDARSHAN International Civil Aviation Organization International Civil Aviation Organization Global Air Navigation System ~Interoperability.
49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8 – 12 October 2012 APANPIRG ACTIVITIES – OUTCOME OF APANPIRG/23.
International Civil Aviation Organization 5-6 MARCH 2012 AMHS/SWIM SEMINAR/WORKSHOP SP/13.
European Organisation for the Safety of Air Navigation Presentation to ICAO Workshop Kiev 28 July – 1 July 2010 EUR Regional Implementation of Flight Plan.
Information Management The ICAO Perspective
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
EURO-MEDITERRANEAN AIR TRANSPORT SEMINAR: AMMAN: OCT ICAO’S AIR TRANSPORT ACTIVITIES IN THE MID REGION By Evalou GNANG RO/AT.
Middle East Political Map. Countries 1. Afghanistan 2. Algeria 3. Bahrain 4. Cyprus 5. Egypt 6. Iran.
International Civil Aviation Organization European and North Atlantic Office ICAO EUR HLSC Preparatory Seminar 9-11 February 2010 Baku, Azerbaijan Theme.
DISTRIBUTED Multi-nodal ATFM Operational Trial project
Presented by the President of the Air Navigation Commission
1 Technical cooperation challenges National planning for CNS/ATM systems for India.
Presentation to: Name: Date: ICAO Asia-Pacific AMHS Activities & Status ICAO Asia-Pacific AMHS Activities & Status ATS Message Handling System (AMHS )
Introduction to PBN Seminar ICAO PBN Implementation 1.
COSCAP- North Asia Briefing to the NARAST Meeting 14 April 2004 COSCAP North Asia Cooperative Development of Operational Safety & Continuing Airworthiness.
International Civil Aviation Organization SAM Regional Seminar/Workshop Tom Brady ICAO Air Navigation Bureau May Flight Plan Implementation and.
International Civil Aviation Organization REGIONAL GNSS RELATED ACTIVITIES Secretariat ICAO APAC OFFICE GNSS IMPLEMENTATION SEMINAR 26 MARCH 2012.
AMHS WORKSHOP POLICY & DOCUMENTATION. AMHS WORKSHOP POLICY & DOCUMENTATION  Operational Requirements for facilities or services are established through.
1 Vince Galotti Chief/ATMICAO 26 March 2007 A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I FITTING THE PIECES TOGETHER.
Page 1 A brief on MIDANPIRG Hamad Alaoufi (Chair MIDANPIRG) PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013 PIRG/RASG GCM-2013/PPT-2 MIDANPIRG.
COSCAP- North Asia Briefing to the 4 th Steering Committee Meeting March 2005 COSCAP North Asia Cooperative Development of Operational Safety & Continuing.
28-31 October RASMAG STUDY ON THE EFFECT OF AIDC AND APANPIRG CONCLUSIONS Secretariat - APAC OFFICE 28 October 2014 SIP AIDC Seminar in Bangkok SP/01.
Bellwork  Name one country in SWC Asia. Pg 410. To Do  Go over test  Unit project  Start unit.
FAA Technical Support in the Asia Pacific January 14, 2004.
Use Page 772, 392, and 426 Countries and Capitals.
COG/TNG contribution to LPR Implementation Language Proficiency: a safety issue St. Petersburg May 24th 2011.
Service Enhancement AMHS Implementation Workshop Chennai, India 15 th – 17 th December 2008.
September 2003 ATN Middle East Airlines CNS Developments in the Middle East Captain Ousama Balaa, Head of Technical Department Middle East Airlines.
Cooperative Development of Operational Safety and Continuing Airworthiness Programme COSCAP South East Asia Program Progress Report Discussion Paper 2.
Cooperative Development of Operational Safety and Continuing Airworthiness Programme COSCAP South East Asia COSCAP-SEA Action on Decisions 16 th Steering.
OPPORTUNITIES SURVEY MIDDLE EAST FROM/TO NICE AIRPORT
Inter-Regional Co-ordination and Harmonization Mechanisms
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
Oceanic and International Operations
Presented by United Arab Emirates
Erwin Lassooij PBN Programme Manager 30 January 2014
Summary of discussions of the NGAP Implementation Working Group 6 and 7 December 2016 Mary Nelson – Implementation Working Group Chair 8th December 2016.
RASMAG STUDY ON THE EFFECT OF AIDC AND APANPIRG CONCLUSIONS
Presented by United Arab Emirates
AMHS/SWIM Seminar Chiang Mai, Thailand 5-6 March 2012
A brief on APIRG Eng. John Tusubira Kagoro
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Global Air Navigation System ~ Planning Mechanisms ~
Regional Meteorological Telecommunication Network for Region II (Asia)
APANPIRG ACTIVITIES – OUTCOME OF APANPIRG/23 DP/3/1
the International Civil Aviation Organization
Technical cooperation challenges
Briefing on APANPIRG Priorities and Targets
Political Features of Southwest Asia
IATA/ATDI Senior Civil Aviation Management Course
Briefing to the 3rd Steering Committee Meeting June 2004
Regional Training Seminar on GTS Techniques and Procedures
Regional RAIM Prediction System – Progress Report
COSCAP-SEA Work Programme Discussion Paper 3
Oceanic and International Operations
Oceanic and International Operations
Technical Co-operation Challenges
Briefing to the 5th NARAST Meeting May 2006
COSCAP – SOUTH ASIA 19th MEETING OF THE STEERING COMMITTEE
Performance Based Navigation –Civil Aviation Authority Actions
SAM Regional Seminar/Workshop
Language Proficiency: a safety issue
Presentation transcript:

Inter-Regional Co-ordination and Harmonization Mechanisms Harmonization of Air Navigation Systems Presented by MID Region

MID Accreditation Area AfghanistanAFG LebanonLEB BahrainBAH LibyaLIB CyprusCYPOmanOMA EgyptEGYPakistanPAK IranIRAQatarQAT IraqIRQ Saudi ArabiaSAU IsraelISRSudanSUD JordanJORSyriaSYR KuwaitKUWUAEUAE YemenYEM

15 MID Provider and Adjacent States KSA BAH IRK UAE OMNYEMERT CYP JOR ISR SYR IRN TKY AFG PAK IND SUD EGP TJK TUR LEB KWT QTR GRK ARM OUZ LYB ETP DJB

DAMAS ANKARA CYPRUS BEIRUT AMMAN JEDDAH BAHRAIN BAGHDAD KUWT UAE EUR MID INTERFACE ATHENS CAIRO TEL AVIV TEHRAN

EUR MID MIDASI INTERFACE ANKARA DAMAS YEREVAN TASHKENT TEHRAN BAGHDAD DUSHANBE KABUL BAKOU

TRIPOLI CAIRO KHARTOUM AMMAN JEDDAH SANAA MUSCAT DAMASCUS BEIRUT AFI MID INTERFACE ASMARA ADDIS ABABA

MID ATS Route Network 51 of 89 ATS routes implemented Europe - Middle East ATM Coordination Bureau (EMAC) 1st IRCM meeting: Revised ATS Route Structure proposed

RNP/RNAV Central Monitoring Agency to be provided by U.A.E No ICAO guidance material relating to airworthiness / operational approval for RNP5 ops. MIDANPIRG/6: Progressive introduction route by route

MIDDLE EAST REGION Major Traffic Flows LEGEND Major Traffic Flows Low density routes, seasonal high density Area covered by MID CNS/ATM Plan Flows are intended to show area of origin, destination, and approximate flight paths. They do not accurately portray ATS routes

RSVM MID Target date for RSVM: 2003 EUR/MID interface EUROCONTROL Implementations costs –Operators / ATS Providers –Funding Mechanism is needed MID RVSM Task Force WGS-84: 10 of 15 States utilizing standard reporting format MID Target date for RSVM: 2003 EUR/MID interface EUROCONTROL Implementations costs –Operators / ATS Providers –Funding Mechanism is needed MID RVSM Task Force WGS-84: 10 of 15 States utilizing standard reporting format

RSVM - Coordination with Asia/Pac Asia / Pacific RSVM TF/8 (Aug 00)Asia / Pacific RSVM TF/8 (Aug 00) –Proposed RSVM implementation South of Himalayas Route :Decision to be taken –Agreed to undertake data collection for readiness assessment –MID RSVM TF participation to be considered by MID –All MID States will be invited to ASI PAC RSVM Seminars

GNSS Not approved means of navigation in most MID States ICAO guidance material are needed, Some examples available Target date for en-route and non-precision approach: 2002 AIRAC date should be determined soon Not approved means of navigation in most MID States ICAO guidance material are needed, Some examples available Target date for en-route and non-precision approach: 2002 AIRAC date should be determined soon

GNSS Cont. States not having done so are urged to:States not having done so are urged to: –authorize GNSS for en-route and non-precision approaches –Establish multidisciplinary GNSS implementation teams –work towards filling requirements for GNSS for introduction in 2002 ISTB for MID Region: Demonstrations and trials tentatively scheduled for March / April 2001ISTB for MID Region: Demonstrations and trials tentatively scheduled for March / April 2001

Communications Transition to ATNTransition to ATN –AFTN-based AIDC procedure –to be replaced by ATN AIDC procedure Frequency Lists - under developmentFrequency Lists - under development VSAT - MIDANPIRG/6 encourages useVSAT - MIDANPIRG/6 encourages use AFTN Circuits - implemented;AFTN Circuits - implemented; Interface AFTN /CIDIN in MID Interface AFTN /CIDIN in MID

CONCLUSION Inter-Regional mechanism : PIRGs should support the interregional dialogue (inter- PIRGs) based on common goalsInter-Regional mechanism : PIRGs should support the interregional dialogue (inter- PIRGs) based on common goals Interregional activities are coordinated at the level of each of the sub-groups concernedInterregional activities are coordinated at the level of each of the sub-groups concerned