Technical Workshop: Xayaburi HPP Requisites for Concession Agreement: Requirements of MRC-1995 Agreement By: Xaypaseuth Phomsoupha Director General Department.

Slides:



Advertisements
Similar presentations
Mekong River Commission (MRC) Impact Assessment Tools and Processes on Water and related Resources Regional Workshop to Review GEO/IEA Training Manual.
Advertisements

Success in Exporting BHA Annual Conference SME established in 1991 Engineering Consultancy with 30 Engineers We specialise in Hydraulic Steel Structures.
MRC SEA OF HYDROPOWER ON THE MEKONG MAINSTREAM LAO PDR
International Workshop on Institutional Capacity Development in Transboundary Basins November 2008, Bonn, Germany Le Duc Trung Acting Secretary.
DR. CARL MIDDLETON (International River) MR.SAM CHANTHY (NGO Forum) Chinese Involvement in Cambodia’s Hydropower Sector 18 January 2008 Royal University.
SCIENTIFIC RESEARCH INFLUENCES NATIONAL POLICY ON HYDROPOWER DAMS IN CAMBODIA SRP4: Managing river basin equitably for livelihoods and the environment.
By : Soukata Vichit The Feasibility of NCF The case of Environment Protection Fund, Lao PDR.
Doosti Dam on shared river of Harirood: A Friendship Bridge Between Iran and Turkmenistan Saeed Nairizi Head of the Board & Managing Director, Toossab.
The Mekong River - survival for millions Lake Tonle Sap Mekong Delta Mekong Delta Wetland.
OVERVIEW – SUNDANCE WIND PROJECT PROPOSED $600 MILLION INVESTMENT NEAR TUMBLER & CHETWYND Ron Percival Avro Wind Energy Inc. October, 2014.
1 The 2 nd Green Mekong Forum International Conference on “Green Mekong Initiative” Water Resources Management in Lao PDR By: Mr. Phousavanh Fongkhamdeng.
Making Aarhus work in international forums A workshop on promoting the application of the principles of the Aarhus Convention in international forums Geneva,
Mini-Grid Based on Renewable Energy (Biomass) Sources to Augment Rural Electrification Implemented by UNIDO.
1 Key issues framing the SEA scope Related to electricity demand and power trade development in the LMB and GMS Briefing to TNMC Based on the Presentations.
Merowe Dam: Details of Site & Engineering Design Suzanne Young February 19, 2004.
Second Sudan Consortium March 2007 Water Supply and Sanitation Service Delivery and Challenges in Southern Sudan Ministry of Cooperatives and Rural Development.
Law as a Tool for Cooperation and Sustainable Development of the Mekong River.
Asian region workshop on “capacity development for the clean development mechanism” October 2005, AIT, Bangkok, Thailand VIETNAM DNA INSTITUTIONAL.
DEVELOPMENT OF A REGIONAL ENERGY MARKET IN THE MEKONG AREA by Piyasvasti Amranand National Energy Policy Office, Thailand ENERGY WEEK April 1999,
The Mighty Mekong: Heart of Southeast Asia
1 Module 2 Mekong Resources, Benefits to people, and Planning Issues session 1 : The Mekong and its water resources.
Knowledge on HIA IN CAMBODIA Constructing a Caring and Sharing Community Roles of HIA 4-6 October 2012 Bangkok.
1 1 The Mekong basin development planning process Ton Lennaerts CTA Basin Development Plan Programme JRP training 8 June 2012.
IW: LEARN Case study:The Mekong Wetlands Biodiversity Programme Peter-John Meynell UNDP Team Leader 20 November 2004.
BUSINESS OPPORTUNITIES IN RENEWABLE ENERGIES FOR CHILE BUSINESS OPPORTUNITIES IN RENEWABLE ENERGIES FOR CHILE Javier García M. Deputy Head Investment and.
Presentation of the ESIA Inception Report (Poyry, May 2011) Rogun Riparian Information Sharing and Discussions World Bank Central Asia Regional Office.
REHABILITATION AND DEVELOPMENT OF NAVIGATION ON THE SAVA RIVER.
12Introducing Geographical Zones in the Mekong River and related Technical and Operational Requirements for Tankers Objective To assess, identify, define.
1.  Offshore Siting Process / Guidelines – Macro View  Offshore Siting Example – VA  Offshore Development Example – VA Virginia Offshore Wind Technology.
Overview of Thailand’s power demand and supply With reference to proposed mainstream dams in the Lower Mekong Basin The Development Context Discussion.
Development of Micro-Hydro Projects Stacey Simms Associate Director, Programs CREA Energy Innovations Summit.
1 Potential Project Betterments to be studied further during Relicensing June 20, 2006 Stakeholder Meeting Middle Fork American River Hydroelectric Project.
By Charles K. Miller VPA Support Unit Mamba Point, Monrovia, Liberia West Africa Forest Governance Forum Held at: Grand Royal Hotel Monrovia, Liberia A.
Dam of the Day Bonneville Dam Duffy Dessalines September 27, 2001.
2 International efforts to coordinate Mekong water development started in 1920s – Series of international agreements mainly for navigation and boundary.
Drought Management in Lao PDR Department of Water Resources (DWR) Ministry of Natural Resources and Environment (MONRE) Lao PDR ASEAN Drought Workshop.
Work package 3 Analysis of international MSP Instruments Sophie Jacques 3E Support by: Offshore Wind Power in Italy SEANERGY 2020 project Andrea Marchisio.
Boun ma Luang amath Coordinator of WWF Department of Livestock and Fisheries Tel : Fax : Mobile MRC / SEA WORKSHOP.
2 HISTORY OF MEKONG COOPERATION IRBP Course PP 2.4.
Nam Ton Watershed Group 2 SangHuyToe Cost and Benefit analysis of Irrigation and Agriculture Development.
The Mekong River Commission Presented by Mr. Detsada Soukhaseum, Mekong River Commission Secretariat, 16 November 2015.
Opportunities and Challenges of Water Resources Management in Lao PDR
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
1 Experience from Finland Christian Llull, Ho Chi Minh City, 23rd November 2015 ? Cooperation & Partnership in Wind Project Development.
Columbia River Treaty Past, Present and Future Status of Columbia River Treaty Discussions: a BC government perspective October 7, 2015 Osoyoos, BC Kathy.
The Mekong River Commission: Challenges, Mission, and Strategies.
Mekong River Commission Meeting the Needs - Keeping the Balance MRC Water Utilization Programme: GEF International Waters Project (GEF/World Bank)
Photo: David Brazier/IWMI Photo :Tom van Cakenberghe/IWMIPhoto: David Brazier/IWMI Water for a food-secure world Mekong Transboundary Water.
Regional Action Plan for Sustainable Transport of Dangerous Goods along the Mekong River Final Regional Workshop, October 2014 Bangkok, Thailand.
6 June 2007 Dias 1 Peter Furu DBL – Centre for Health Research and Development, Charlottenlund, Denmark WHO Collaborating Centre for Health and Environment.
Mekong River – Negotiations Kamran Soomro Shabeena Faraz Zareen Fiza Qureshi.
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
By Ms. Pakawan Chufamanee Director of Mekong Affairs Division, Bureau of International Cooperation, Department of Water Resources, Ministry of Natural.
Update to Proposition 1E – Early Implementation Project (EIP) Application and Local Share Reclamation Board Sub-Committee Meeting September 11, 2007.
1 PP 2.3 Development Potentials of LMB Water Resources PP 2.3 Development Potentials of LMB Water Resources.
The Mekong River Commission: Challenges, Mission, and Strategies.
Erdeneburen HPP Project Implementation Unit
Mekong River Commission, Tools to Implement the 1995 Agreement - Dr Choomjet Karnjanakesorn, WUP Team Leader 28-Apr-17 Mekong River Commission (MRC) Water.
11th November 2007 by Eng. Martin O. Ogada Financing of Small-Scale Hydropower Projects & Risks Mitigation for Tea factories A Case for Unilever Tea Kenya.
Hydropower development of Bulgaria: current state and future outlook Valentin Ivanov Deputy Minister Ministry of Economy and Energy.
1 Hydrological Regime of the Mekong River Hydrological Regime of the Mekong basin depends on climatic conditions of the wet and dry seasons. High water.
Mekong River Policy China’s Perspective “Dam it now.”
Our goal for today To gather broad, values-based input to inform future decisions about fish passage at Mactaquac Generating Station. Your feedback today.
Presentation title 9. Defining a country-specific NAP process: rapid stocktaking using a sample NAP process to identify building blocks, workstreams and.
MHI Products © 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.
strengthening the elements of governance in Tajikistan
Lao People Democratic Republic
Renewable Energy Projects in Georgia
SOUTH-SOUTH WATER MANAGEMENT WATER RESOURCE PLANNING
Day 1: Business Case and Concept for a Sound ESMS
Presentation transcript:

Technical Workshop: Xayaburi HPP Requisites for Concession Agreement: Requirements of MRC-1995 Agreement By: Xaypaseuth Phomsoupha Director General Department of Energy Business Donchan Palace Hotel Ministry of Energy and Mines Vientiane, 15 July 2015

Projects on Lower Reach of Mekong River 1. Pak Beng1,230 MW 2. Luang Prabang1,410 MW 3. Xayaburi1,285 MW 4. Pak Lay1,320 MW 5. Sanakham570 MW 6. Pak Chom1,079 MW 7. Ban Koum2,000 MW 8. Phou Ngoy800 MW 9. Don Sahong260 MW 10. Stung Treng980 MW 11. Sambor460 MW Total11,394 MW

Xayaburi HPP Situated in the Lao sovereign territory Developed on the mainstream of Mekong River Project in the PDP of Laos Run-off-river scheme with no reservoir 1930 km to Delta

Configuration Main Dam Navigation Locks Spillway Power House Intermediate Block Fish Passage Transmission Line

Commercial Details Installed capacity: 1,285MW, energy: 7,370Gwh/year Domestic/export IPP project with BOOT mode Investment cost (original) around USD3.6 billion Jointly Public-private financed (equity) Limited recourse financing (debts)

Qualifications of Xayaburi HPP Despite the location inside the Laos’ territory, Xayaburi HPP is required to meet international standards Be subject to Notification/Prior Consultation Agreement Prior Consultation process to apply to Xayaburi HPP To meet MRC Preliminary Guidelines

MRC Requirements Mekong Agreement Notification Prior ConsultationAgreement A.Tributaries Wet & Dry Season XXX B. Mainstream 1. Wet Season - Intra-basin UseXXX - Inter-basin Div.XXX 2. Dry season - Intra-basin UseXayaburi HPP - Inter-basin Div.XXX

2007 MOU signed between the Government of Laos and CK Group (Thailand) Feasibility study (FS) and environmental-social impact assessment (EIA) studies started 2008 Pre-FS completed by Colenco Preliminary EIA completed by TEAM Project Development Agreement (PDA) signed Negotiation on CA and PPA started 2010 Final FS and EIA finalized Prior Consultation Process initiated CA and PPA signed Road to CA Signing & Effectiveness

2011 Feedback from MRC member countries/stakeholders received Prior consultation process completed on 22 April Post-consultation process works incorporated in Xayaburi HPP Construction ongoing 2015 Concession Agreement effective Construction officially started on 7 November 2012 Engagement GOL Poyry and CNR to carry out studies and designs of additional works Project Development

Post-Consultation Works The completion of PNPC has left additional works (post-consultation) for GOL and HPP Post-consultation process works to address concerns of MRC member countries and stakeholders Accepting works after the consultation process additional to Xayburi HHP’s original design means complying with the MRC guidelines/requirements

Additional Works of Xayaburi HPP Additional fish passages: fish ladder, fish lift, fish lock including fish-friendly turbines A space provisional for the second navigation lock in addition to the first one in the original design Deeping and widening bottom outlets in order to flush sediment Installing additional bottom outlets

Addressing MRC Member Countries’ Concerns Concerns include potential impacts on inter alias, Mekong Delta area, water flow, fish migration, sediment flow, and navigation. Additional works to address all concerns Accepting additional works, GOL incurs nearly USD200 million; more than USD200 million absorbed by XPCL

Refection of Xayaburi HPP Overall construction progress achieved at 45% All construction activities are going on smoothly Being the first mainstream project-versatile, transparent, and inclusive Requirements of 1995 agreement deemed completely satisfied Other mainstream projects like Don Sahong and others to follow suit

Thank you very much for your attention For more information: Tel: Fax: Mail: Web: