17.4.2009 TILC09 SCRF Session Global Design Effort 1 EU Status TILC09 SCRF Session Lutz Lilje DESY.

Slides:



Advertisements
Similar presentations
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Advertisements

RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
ILC-BCD: Cavity Package International Linear Collider - Baseline Configuration Document: Cavity Package DESY -MPY-
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
SCRF WebEx Meeting May 14, Report from PMs and APMs 2.Technical Design Phase R&D plan (rev. 3) 1.High Gradient R&D guideline 2.S1-global preparation.
Cavity performance vertical test → horizontal test → CM test C.M. Ginsburg On behalf of the ILC Database Group with special thanks to Detlef Reschke, Lutz.
TILC09 AAP Review Lutz Lilje Global Design Effort 1 Cavity Gradient R&D.
Needs of a European SCRF Facility - the BIG plan Lutz Lilje DESY -MPY- DESY 11/2006 Planning Resource needs.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
The ILCTA_MDB Horizontal Test Stand for SRF Cavities Andy Hocker FNAL-TD AEM, 25-JUN-2007.
Lutz Lilje DESY -MPY- Module Issues XFEL Linac Review R. Lange/L. Lilje Ongoing Tests Module Designs Future tests.
M. Ross, N. Walker, A. Yamamoto ILC Cost Review, (updated for TB) and Cost Drivers  Future R & D ILC Cost Review (M. Ross,
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
Summary of SRF WG, LCWS14 H. Hayano, A. Yamamoto.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
Lutz Lilje DESY -MPY- SCRF Infrastructure for ILC EGDE Meeting Lutz Lilje.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
Beijing ILC Workshop Global Design Effort 1 High-Gradient Module Test Lutz Lilje.
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Work Packages Lutz Lilje GDE.
SCRF Parallel Sessions at TILC09 GDE 活動報告 3月30日(月)10時~ 3号館7階会議 室 設楽 哲夫.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
ILC Global Design Effort 1 ILC S0 Strategy Proposal FNAL
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
CARE SC meeting August 2005 T. Garvey JRA1 – SRF (WP 7 – 11)
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
JRA1 – SRF report CARE Steering Committee meeting,
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
Lutz Lilje DESY -MPY- SCRF Infrastructure at CERN? Electron Accelerator R&D for the Energy Frontier Lutz Lilje DESY –MPY-
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross.
Report Working Group “Cavity design and construction” 1 SPL collaboration meeting Vancouver 8-9 May 2009revised by W. Weingarten on 30/4/2009  Status.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
Lutz Lilje XFEL Coupler Some Comments. XFEL Coupler WEBEX Lutz Lilje DESY Status TTF III Coupler  has shown full ILC performance  has not.
Beijing ILC Workshop Global Design Effort 1 Main Linac EDR: Cavity & Cryomodule Discussion Lutz Lilje DESY.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
A European SCRF Infrastructure DESY -MPY Goals of the Infrastructure – ILC – Other projects Timeline – Phasing of work Needs.
W. Singer. SRF2011, July 25 ‐ 29, 2011, Chicago, Illinois, U.S.A. XFEL Cavity Recipe for Mechanical Fabrication and Treatment Waldemar Singer/DESY.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Hans Weise, DESY TTC Meeting, Milano, February 28 – March 3, 2011 Technical Board Meeting TESLA Technology Collaboration Meeting Milano, February 28 th.
TTC Tech Board Report Dec 7, Frascati h edwards. Tech Board Topics to discuss 1) Cavity gradient issues. This is a critical issue and the TB meeting has.
Start of S2 Milestone Work H. Padamsee. Intro At KEK S2 meeting we decided to make a list of milestones and eventually cost S2 activities I tried to start.
ILC-HiGrade annual meeting - 22 November 2010 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
Strategy and Status of Reference Cavities for European XFEL
Status and plans for the 3.9 GHz section of XFEL
ILC-SCRF Test Facilities considerations
STF Plan of gradient improvement
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
Main Linac EDR: Cavity & Cryomodule Discussion
2. SCRF General Preparation for the AD&I Preparation for AAP Review
2nd TTC Topical Workshop on « SRF Cryomodule Clean Room Assembly »
Highlights from EU Global Design Effort
Degradation and possible sources Statistic of resonators
Performance of Superconducting Cavities for the European XFEL
Nick Walker (DESY) EU GDE Meeting Oxford
Retreatment of Superconducting Cavities for the European XFEL
Daresbury ESS In-Kind Contributions
Presentation transcript:

TILC09 SCRF Session Global Design Effort 1 EU Status TILC09 SCRF Session Lutz Lilje DESY

TILC09 SCRF Session Global Design Effort 2 Overview XFEL Preparation Cavity results Module Status HiGrade

TILC09 SCRF Session Global Design Effort 3 Preparation for XFEL –Preparation for Call for tender is an international effort INFN and CEA are involved in the process M. Champion and H. Hayano were taking part in Production Readiness Review –To be ready in May

TILC09 SCRF Session Global Design Effort 4 Cavity Status Evaluation (by D. Reschke) –Streamlining cavity process Put helium tank at early stage –Performance not changed Final preparation –EP still better than BCP Scatter in data still large –Mainly due to manufacturing issues –Results consistent with data from 4th production KEK/Kyoto-type optical inspection system is being put into operation –Ongoing test program Tests in TDP1 –20 – 30 tests to provide cavities for prototype cryostats

TILC09 SCRF Session Global Design Effort 5 EU Status D. Reschke, to be published SRF 2009

TILC09 SCRF Session Global Design Effort 6 Module Status –Re-assembly Module 8 Finished string roll-out –Test M3* finished –Cryostats from new vendors will be available for testing soon

TILC09 SCRF Session Global Design Effort 7

TILC09 SCRF Session Global Design Effort 8 M3* Warmup to excludes –magnetic flux –gas condensation –Preliminary conclusion Degradation could be a processed field emitter Module will be repaired –This (as well as the ongoing repair of M8) will block the DESY infrastructure for considerable time –Smaller number of tests with EP as final treatment

TILC09 SCRF Session Global Design Effort 9 XFEL Preparation: M3** D. Kostin Operational gradient low per request from beam dynamics

TILC09 SCRF Session Global Design Effort 10 XFEL Preparation: M3** D. Kostin

TILC09 SCRF Session Global Design Effort 11 HiGrade: Main Ideas Obtained EU funding for LC cavity program Proposed Objectives –Quality control XFEL process Select regularly (1/month?) a cavity from XFEL process –Test I –Validate ILC choice Horizontal EP + ethanol –Test II –Cost reduction Vertical EP + ethanol –Test III Open Questions –Manpower DESY and CEA –EP available at DESY vs. Cost of horizontal EP at company –Second sound development? –Fast bakeout?

TILC09 SCRF Session Global Design Effort 12 Proposed Model for ILC-HiGrade Cavity Production and Preparation: Part 1 – XFEL Production Quality Control Technical ChoicesLocationRemark FabricationXFEL-likeCompanyInclude optical inspection Rough Surface PreparationXFEL-likeCompany Optical Inspection IXFEL-likeCompany FurnaceXFEL-likeCompany XFEL Final Surface PreparationFinal BCP or EP, Choice left to XFEL Project CompanyIlC prefers EP XFEL Standard RF testWith fixed coupling and HOMDESY Preparation for T-MapDisassembly of HOM and fixed antenna Assembly of variable antenna CEA DESY? Transport under nitrogen? Test IT-map mandatoryDESYDESY Manpower? Second sound? Optical Inspection IICompare with T-mapDESYGuided repair option?

TILC09 SCRF Session Global Design Effort 13 Proposed Model for ILC-HiGrade Cavity Production and Preparation: Part 2 – Demonstration ILC Process Technical ChoicesLocationRemark Optical Inspection IICompare with T-mapDESYGuided repair option? ILC Final Surface Preparation IHorizontal EP and ethanolDESY, Company DESY capabilities? Which Company? Test IIT-map (or second sound) mandatory DESY, CEADESY Manpower ? Second sound at DESY or CEA available ? ILC Final Surface Preparation IIVertical EP and ethanolCEACEA Manpower Check Schedule with EP installation Test IIIT-map (or second sound) mandatory DESY, CEADESY Manpower ? Second sound at DESY or CEA available ? More Tests ?Unlikely due to schedule Tank weldingBladetuner with PiezosCompany, DESY Compatible XFEL Cav. ! Tuner from INFN Coupler assembly and Final rinse High-pressure water rinseDESY, CEACoupler from LAL High-power testDESY, CEACHECHIA, CryHoLab

TILC09 SCRF Session Global Design Effort 14 The end..