NCSX Data Management Plan Peer Review Bob Simmons March 31, 2003.

Slides:



Advertisements
Similar presentations
AWARENESS OF ISO 9000 (2000) By C. Das Additional Director
Advertisements

Archiving NCSX Construction Information Using the PPPL Windows Based Server.
Quality Assurance U. S. ITER Project Office U.S. ITER Project 1 November 15, 2006 U. S. ITER QUALITY ASSURANCE Gail Okulczyk, Presenter U. S. ITER Quality.
Contracting for Laboratory Services Ann Mullin Cleveland US Geological Survey Presented to the Environmental Protection Agency Science Advisory Board April.
CATIA V4 Software Deployment Project Proposal
MODELING THE TESTING PROCESS Formal Testing (1.0) Requirements Software Design Risk Data Approved, Debugged, Eng. Tested Code Automated Test Tools Tested.
EMS Development Course for Government Agencies Class 7: Communication, Document Control, Records, and Emergency Preparedness and Response Winston-Salem,
More CMM Part Two : Details.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
Quality Management System
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Management Adrian Marshall.
ISO 9000 Certification ISO 9001 and ISO
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
Framework for the Service Acquisition Process Conduct Historical Analysis Define Stakeholder & Customer Needs 2. Review Current Strategy 3. Market Research.
4. Quality Management System (QMS)
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
Announcements Homework 1 Due 9/15 Project: Step 1 Due 9/17 Reading for Wednesday –2.6 – 2.8.
1/18/2005Module 41 How the NCSX Project Does Business Work Planning & Design Review Processes.
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
From Research Prototype to Production
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
10/16/2015 Roles and Responsibilities of Principal Investigators/ Program Directors/ Project Directors.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
Current and proposed changes to the NCSX drawing release process Tom Brown – 4/16/04.
Project Management Models
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
Release Management Configuration management. Release Management Goal Coordinate the processes through the project development life cycle Ensure the.
NCSX NCSX Design Review Guide May 27, 2005 Wayne Reiersen NCSX.
Continuing Analysis and Surveillance System (CASS) 03/06/59 1 AIRCRAFT MAINTENANCE Section 10.
12/2/04Module 2D1 The NCSX Engineering Web – An Overview Part IV Engineering Management & Systems Engineering and Other.
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
12/2/2004Module 2A1 The NCSX Engineering Web – An Overview Part I Work Planning, Project Files, Management Plans and Procedures.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
NSTX Response to the Lessons Learned Report NSTX TF Coil Repair Review September 3-4, 2003 Al von Halle.
11/23/2004Module # 11 The NCSX Project Web An Indoctrination and Overview.
How the NCSX Project Does Business
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
September 10, FY 2003 Plans Bob Simmons. September 10, Introduction Overview of Project and Engineering Plans Project Plans Engineering Plans.
12/2/04Module 2C1 The NCSX Engineering Web – An Overview Part III Design Data, Fabrication, Assembly, and Installation Plans.
Review of the processes released in the framework of the MMP Goran Perinić.
NCSX Document and Records Plan Peer Review Bob Simmons March 14, 2003.
Preparations for working on Station 1 November 22, 2005.
Introduction to Project Management Darren Trofimczuk.
NCSX VVSA / MCWF FDR A Systems Engineering Perspective Wayne Reiersen Bob Simmons NCSX VVSA / MCWF FDR May 19-20, 2004 PPPL.
Managing TDM Drawings Lifecycle WorkFlow Created: March 30, 2006 Updated: April 10, 2006 By: Tony Parker.
An Overview Of The MBP CM Leadership Manual Presented by: Robert J. Carter, CCM Robert M. Pfeiffer, CCM.
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Data Coordinating Center University of Washington Department of Biostatistics Elizabeth Brown, ScD Siiri Bennett, MD.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
PROJECT COMMUNICATION PROCEDURE AND DOCUMENT MANAGEMENT
Agenda Item 2: Catch up session 15 May 2017
Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations.
Software and Systems Integration
TechStambha PMP Certification Training
2K CB FDR Overview:  Agenda, Charge, Review Process
Chapter 3 Managing the Information Systems Project
4.5 Checking and Corrective Action Monitoring and Measurement
Guidance notes for Project Manager
DOE Review of the LCLS Project October 2006
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

NCSX Data Management Plan Peer Review Bob Simmons March 31, 2003

2 NCSX Data Management Plan Peer Review Review Committee – Judy Malsbury, Chair – Bob Simmons, Cog – Tom Brown – Wayne Reiersen, RLM

March 31, Review Objectives Have the appropriate systems been established for the storage and management of the NCSX documents and records specified in the NCSX Documents and Records Plan? Do these systems provide an appropriate level of protection from change and protection from damage, loss, and deterioration, as required by P-015? Do these systems provide an appropriate level of access to the documents and records so that NCSX personnel and suppliers can obtain current and accurate information in a timely fashion?

March 31, Relationships to Other NCSX Plans and Procedures The DMP implements the documents and records requirements specified in the NCSX Documents and Records Plan. The DMP supports the following NCSX Project Plans – Project Execution Plan (PEP) – Systems Engineering Management Plan (SEMP) – Quality Assurance Plan (QAP) – Configuration Management Plan (CMP) – Pro/INTRALINK Users Guide

March 31, Seven Electronic Data Storage Sites Project Web – General project information, external design review data, physics meeting records, PAC meeting records, publications, and the project directory Engineering Web – All other project documentation, excluding models and drawings, including cost and schedule information, design criteria, internal design review data, engineering and project meeting minutes, memoranda, analysis reports, controlled documents not otherwise posted, and work plans

March 31, Seven Electronic Data Storage Sites Pro/INTRALINK Data Base – CAD drawings and models for project use – Six Drawing Release Levels Work in Progress Conceptual Design Preliminary Design Prototype Final Design Fabrication Manufacturing Web – All project documentation required for suppliers with awarded contracts to execute their scope of work Procurement Web – All documentation required for potential suppliers to develop proposals

March 31, Seven Electronic Data Storage Sites Project FTP Server – Large data files primarily used in physics analyses Supplier FTP Server – CAD drawings and models for use by suppliers Other Hard Copy Files Will be Maintained as Necessary – PPPL Operations Center – QA Files

March 31, Technical Documentation Defined in the NCSX Documents and Records Plan Models and Drawings – Pro/E or AutoCad as primary drawing software packages – INTRALINK is the data management system – Pro/INTRALINK Users Guide lays out process for developing, changing, and approving drawings and models Technical Documents – Specifications – ICDs – Non-Conformance Reports (NCRs) – Supporting Design Documentation

March 31, Other Project Documentation Cost and Schedule Documentation Plans and Procedures Miscellaneous Documents – WBS Dictionary – Procurement Documents – Training Records

March 31, Data Management Process

March 31, Data Management Process

March 31, Data Management Process

March 31, Four Pre-Peer Review CHITs Dispositioned

March 31, Four Pre-Peer Review CHITs Dispositioned

March 31, Four Pre-Peer Review CHITs Dispositioned

March 31, Four Pre-Peer Review CHITs Dispositioned

March 31, Questions?