International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 1/11 ILC-Americas FY08-09.

Slides:



Advertisements
Similar presentations
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
Advertisements

JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
ILC Polarized Electron Source Annual DOE HEP Program Review June 5 – 8 International Linear Collider at Stanford Linear Accelerator Center A. Brachmann,
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Recent developments for the LCLS injector Feng Zhou SLAC Other contributors: Brachmann, Decker, Ding, Emma, Gilevich, Huang, Iverson, Loos, Raubenheimer,
AS Diagnostic Collaboration Mark Boland
Polarized photoemission
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
Summary of issues. RF-Gun cavity – Disk and washer (DAW) : very fast RF ageing, 2 MeV is not enough. – Quasi travelling wave side couple structure : Lower.
1) Source Issues 2) SLAC’s ITF Jym Clendenin SLAC.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
1 st October Linear Collider workshop The CLIC/ILC common work plan progress J. Clarke and L. Rinolfi.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Summary of Accelerator System (WG2) 김귀년 경북대학교. Presentations for WG2 -Polarized Electron Source for ILC in Korea - ( 김귀년 ( 경북대 ), 박성주 (PAL)) - ILC Bunch.
R&D, Collaborations and Closeout Fulvia Pilat MEIC Collaboration Meeting March
Key luminosity issues of the positron source Wei Gai.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Global Design Effort 1 Sources Parallel Session Summary Jim Clarke STFC Daresbury Laboratory.
Polarized Photocathode Research Collaboration PPRC R
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
9/24-26/07 e- KOM Slide 1/20 ILC Polarized e- source RDR Overview A. Brachmann.
Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 Updates G0 Tiger Laser High Polarization Photocathodes Mott polarimeter.
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
Recent Polarized Cathodes R&D at SLAC and Future Plans Feng Zhou Axel Brachmann, Jym Clendenin (ret.), Takashi Maruyama, and John Sheppard SLAC Workshop.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
Global Design Effort 1 Polarized electron source update Axel Brachmann, John Sheppard, Feng Zhou, Takashi Maruyama, -SLAC- Matt Poelker -Jlab- LCWS/ILC.
EIC Users Meeting, SBU, 6/27/14 Polarized Electron Beams in the MEIC at JLab Fanglei Lin for MEIC Study Group EIC Users Meeting, Stony Brook University,
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
Review of e- source for the low power Option and status update Axel Brachmann, John Sheppard BAW2, SLAC 1/18/2011.
October 25, 2007 A. Brachmann Slide 1 ILC polarized Electron Source EDR Work Packages ALCPG/GDE Meeting Fermilab, October 25, 2007 Axel Brachmann.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Undulator based polarized positron source for Circular electron-positron colliders Wei Gai Tsinghua University/ANL a seminar for IHEP, 4/8/2015.
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
Axel Brachmann, John Sheppard, Vinod Bharadwaj SLAC Particle Sources Efforts Review/Status and Plans SLAC HEP Program Review June 13 th, 2007.
September 10-14, 2007 XIIth International Workshop on Polarized Sources, Targets & Polarimetry, Brookhaven National Laboratory (BNL) 1 Polarized Electron.
POSIPOL Berlin ILC/CLIC e + generation working group Wei Gai, ANL Louis Rinolfi, CERN Thanks to Omori-san for the coordination of the Webex meetings.
November 20, 2008 A. Brachmann Slide 1 Sources Session Summary LCWS 2008 A. Brachmann, J. Clarke.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
CEBAF Polarized Electron Guns Marcy L. Stutzman for the Jefferson Lab Polarized Source Group.
김 귀년 CHEP, KNU Accelerator Activities in Korea for ILC.
Page 1 Polarized Electron Sources for Linear Colliders October, 2010 A. Brachmann, J. C. Sheppard, F. Zhou SLAC SLAC October 18-22, 2010.
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
TILC Electron Source Update A. Brachmann, J. Sheppard, F. Zhou -SLAC – M. Poelker - Jlab - TILC, Tsukuba, April 2009.
CEBAF Source and Injector Status PREx-II Collaboration Mtg Feb. 26, 2016 Matt Poelker and Joe Grames Center for Injectors and Sources.
1 Gamma Gamma Collider Physics Report Tim Barklow SLAC Apr 18, 2009.
November 17, 2008 A. Brachmann Slide 1 ILC polarized Electron Source R&D Update LCWS 2008 A. Brachmann, J. Sheppard, F. Zhou - SLAC National Accelerator.
AIP and Large Projects Arne Freyberger OPS 2015 StayTreat.
Polarized e- Source Design and R&D 10/24/05
Polarized Electron Source for eRHIC (the ring-ring option)
R&D Topics for FOA Funding Proposals
ILC/CLIC e+ generation working group
Introduction to Jefferson Lab
Electron Source Configuration
ATF 120 Hz Photocathode RF Gun Injection System Design Studies
Summary for the Sources working group
ELIC Injector Working Group High-P, high-I source issues (DC)
SLAC ARD Test Facilities
Andrei Seryi Materials for discussion TILC-08
A. Brachmann and J. C. Sheppard SLAC April 4, 2006
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Electron Beam Systems ETC and Methodology
INJECTOR (WBS 1.2.1) Jym Clendenin, SLAC April 23, 2002
EIC Collaborations EIC Collaboration Workshop, JLAB Oct 28-Nov 1st
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Update on the JLEIC pCDR
Presentation transcript:

International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 1/11 ILC-Americas FY08-09 Planning Polarized Electron Source WBS 2.3 / 3.3 A. Brachmann J. Clendenin, T. Maruyama, K. Ioakeimidi, F. Zhou

International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 2/11 Introduction For FY07, e - sources at SLAC received 25 % of proposed budget. It is uncertain if budget will improve in FY08/09. Most projects will be continued at a low level. Emphasis will be placed on laser development. Priority in FY08/09 is work needed for TDR.

International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 3/11 Projects Overview and Outlook for Work at SLAC based on anticipated FY07 Support WBS 2.3.1PES Design Study WBS 3.3.1Photocathode R&D WBS 3.3.2Source Laser Prototype WBS 3.3.3Polarized Gun Prototype –Currently not funded at SLAC (or elsewhere) –Even for SLC engineering/design work is needed for TDR, mainly: HV, Vacuum design Load-Lock design –Desirable to optimize SLC gun for ILC parameters –Improved HV performance  simplified bunching, cost savings –It is unclear where this project can be done (in US, options are SLAC, Cornell, JLab). –Expertise and critical resources are available at SLAC –Issues are manpower and budget

International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 4/11 FTE Distribution in FY07 and outlook for FY08/09 FTE 07FTE 08/09 WBS (design) (add. Engineer – TDR work) WBS (cathode) WBS (laser) WBS (gun)00 Sum For FY07 we anticipate a total of ~ 1 M $ for Sources Program, FY08/09 will be funded at this level, the R&D program is adjusted accordingly.

International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 5/11 WBS (Design) in FY 08/09 Continue simulations of beam dynamics and beam line component layout Continue options studies for cost reduction Beam line components / tunnel layout and integration Engineering support needed for drawings, details, etc. Dogleg SC Booster LINAC (5 GeV) eLTR

International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 6/11 WBS Photocathode R&D Redesign of SLC/NLC (E158) polarized photocathodes has potential of increasing polarization by up to 5% (~ 85% to ~ 90%). Current funding and anticipated funding level allows: –Maintaining know how and equipment –Very modest R&D activities to advance photocathode technology –Significant progress is uncertain with given current funding level Projects funded at a low level through ILC, SBIR’s and other sources (e.g. collaboration with University of Wisconsin) –Improve QE and polarization (new materials, application of cathode bias) –Improve robustness protective coatings Low temperature surface cleaning  Atomic Hydrogen cleaning –Improve experimental capabilities such as Faraday rotation experimental system and CTS upgrade (add. MOTT polarimeter) –Study of electron spin transport and depolarization mechanisms

International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 7/11 WBS Source Laser Prototype Overview Existing hardwareFY 07 FY 08 FY 08 upgrade

International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 8/11 WBS Laser R&D Highest priority project at SLAC – ‘Proof of Principle’ for TDR New facility allows connection of laser system and gun to produce electron beam with ILC bunch structure (majority of FY05/06 investments (~ 300k$ ILC k$ SLAC budget = 600 k$) Current # of FTE is minimum needed Required M&S for laser development: –FY07 (~ K$)  Pulse Train Generation Pulse Stretcher and Shaper Amplifier Pump –FY08 (~ 350 k$)  Pulse Train Amplification Upgrade to cavity dumped mode-locked Oscillator Cryogenically Ti:Sapphire Amplifier –FY09 (~ 350 k$)  Generate ILC e - bunchtrain System Integration, Hardware TBD (additional amplification)

International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 9/11 WBS Laser R&D – Injector Test Facility

International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 10/11 FY05/06 ITF Investment

International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 11/11 Summary Emphasis for FY08/09 is Preparation of TDR WBS Design –Beam optics simulations to support technical specification of source components –Continue work with technical/global and other area systems to a level sufficient for TDR WBS Photocathode R&D –R&D program continued at low level, current status is ok for TDR, large potential for improvement of Physics at ILC, machine reliability –Combination of Photocathode and Laser R&D will reveal needs for injector R&D and design needs WBS Source Laser R&D –Priority at SLAC, at the end of FY09 we expect to have accomplished ‘Proof of Principle’ – sufficient for TDR WBS Gun Development –Outcome unclear. Currently, level of detail for TDR will be: ‘We will use the SLC gun’