Accelerator Physics Department Meeting July 26, 2006 Jean slaughter1 Status Report APD Meeting July 26, 2007 Jean Slaughter.

Slides:



Advertisements
Similar presentations
Consoles and Hardware Status Erik Gottschalk. Overview Consoles will be installed Dec. 19 & 20 Network installation will begin Dec. 11 Installation of.
Advertisements

Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
R R R CSE870: Advanced Software Engineering (Cheng): Intro to Software Engineering1 Advanced Software Engineering Dr. Cheng Overview of Software Engineering.
Lecture 2b: Software Project Management CSCI102 - Introduction to Information Technology B ITCS905 - Fundamentals of Information Technology.
System Analysis & Design
J. Patrick - Major Challenges/MOPA021 – a new Remote Operations Center at Fermilab J. Patrick, et al Fermilab.
International collaboration in high energy physics experiments  All large high energy physics experiments today are strongly international.  A necessary.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
US CMS Collaboration Meeting: April 7-8, LHC Remote Operations Center Erik Gottschalk Fermilab.
Suzanne Gysin1 Software for the LHC Types of Software Current Prototyping Architecture Ideas Requirements Revisited WBS considerations.
LHC Accelerator Coordination Meeting: March 28, Remote Operations for CMS Erik Gottschalk.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
Advantages Cloud Computing. customers only pay for the access and interfaces that they need. The customer buys only the services they need Cost Advantages.
Fermilab User Facility US-CMS User Facility and Regional Center at Fermilab Matthias Kasemann FNAL.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Quality Program Roles Quality Council AVC/AVPs Quality Advisor
ATTRACT – From Open Science to Open Innovation Information Sharing Meeting Brussels, June 19, 2014 Markus Nordberg (CERN) Development and Innovation Unit.
US CMS/D0/CDF Jet/Met Workshop – Jan. 28, The CMS Physics Analysis Center - PAC Dan Green US CMS Program Manager Jan. 28, 2004.
Commodity Node Procurement Process Task Force: Status Stephen Wolbers Run 2 Computing Review September 13, 2005.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Recommissioning SLAC’s LINAC West for FACET Peter Schuh, August 9, 2012 Workshop on Accelerator Operations 2012.
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
P5 Meeting - Jan , US LHC The Role of the LHC in US HEP Dan Green US CMS Program Manager January 28, 2003.
Chapter 6 CASE Tools Software Engineering Chapter 6-- CASE TOOLS
Eric Prebys Accelerator Physics Center Program Director, LARP December 7, 2009.
Chapter 4 Decision Support System & Artificial Intelligence.
Group Science J. Marc Overhage MD, PhD Regenstrief Institute Indiana University School of Medicine.
F Drag and Drop Controls Display and Builder (Synoptic Display) Timofei Bolshakov, Andrey Petrov Fermilab Accelerator Controls Department March 26, 2007.
Planning for School Implementation. Choice Programs Requires both district and school level coordination roles The district office establishes guidelines,
 Presented by:  Dr.Cherry Steffen  Kennesaw State University.
Chapter 9 The People in Information Systems. Learning Objectives Upon successful completion of this chapter, you will be able to: Describe each of the.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Julia Andreeva on behalf of the MND section MND review.
State of Georgia Release Management Training
LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC Status Report E. Harms 28 March 2006.
Oman College of Management and Technology Course – MM Topic 7 Production and Distribution of Multimedia Titles CS/MIS Department.
Project Management Why do projects fail? Technical Reasons
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
INTRODUCTION: Project management involves the planning, monitoring, and control of the people, process, and events that occur as – software evolves from.
Remote Monitoring for Hardware & Beam Commissioning E. Harms/FNAL 7 April 2005 Port Jefferson, New York bnl - fnal- lbnl - slac US LHC Accelerator Research.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Projects, Tools and Engineering Patricia McBride Computing Division Fermilab March 17, 2004.
Advanced User Support in the Swedish National HPC Infrastructure May 13, 2013NeIC Workshop: Center Operations best practices.
 Accelerator Simulation P. Spentzouris Accelerator activity coordination meeting 03 Aug '04.
©© 2013 SAP AG. All rights reserved. Product Development Scenario Overview Open Legend Project Manager Scenario Description The following business roles.
11/3/2010 CM15 Controls for LARP and LAFS - 1 Terri Lahey LARP/LAFS/CERN and SLAC.
Fermilab LCLS-II Cryomodule QA/QC Model and Software Tools ESS Cryomodule Workshop, 16-Oct-2014 Jamie Blowers Head of Machine Shop and Quality & Materials.
CD Strategy Session/Briefing on Collaboration Tools: Sept. 12, Collaboration Tools Erik Gottschalk.
PROJECT MANAGEMENT Software Engineering CSE
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
Committee – June 30, News from CERN Erik Gottschalk June 30, 2005.
Eric Prebys Accelerator Physics Center Program Director, LARP Important material Contributed by Elliott McCrory (FNAL), Ryoichi Miyamoto (BNL), Alan Fisher.
H2LC The Hitchhiker's guide to LSA Core Rule #1 Don’t panic.
UEC Meeting: May 6, Remote Operations Center Erik Gottschalk.
Remote Operations Erik Gottschalk Fermilab
Remote Operations For High Energy Physics
Ian Bird GDB Meeting CERN 9 September 2003
The importance of project management
Erik Gottschalk for Jean Slaughter
Remote Operations Erik Gottschalk 5 October, 2005
Assessment of Our Status After 183 Days (6 months)
Remote Operations at Fermilab
Responsibilities & Tasks Week 2
Update Erik Gottschalk.
Remote Operations Erik Gottschalk 7 September, 2005
Operations Model Thursday, October 20, 2005 October 13, 2005 Jean Slaughter.
Tour VII: Change Management
Software Engineering I
Preliminary Project Execution Plan
Presentation transcript:

Accelerator Physics Department Meeting July 26, 2006 Jean slaughter1 Status Report APD Meeting July 26, 2007 Jean Slaughter

Accelerator Physics Department Meeting July 26, 2006 Jean slaughter2 Basic Question How can Fermilab people effectively participate in the LHC? Three distinct but related activities LARP McGinnis Proposal (new coherent and forceful formulation of “old” ideas)

Accelerator Physics Department Meeting July 26, 2006 Jean slaughter3 LARPLARP Collection of activities Magnets Accelerator Systems ( V. Shiltsev) Instrumentation (A. Ratti) Commissioning (M. Syphers) Collimation (T. Markiewicz Accelerator Physics (W. Fischer) U.S. Effort – BNL, FNAL, LBNL, SLAC

Accelerator Physics Department Meeting July 26, 2006 Jean slaughter4 Commissioning Activities Trips to CERN Build connections Investigate projects Research practical aspects Several documents in LARP DocDb larp, sevenon7 Participate in Instigated by Alvin Tollstrup E. Harms, E. McCrory, J. Slaughter from AD Other advisors (V. Shiltsev, J. Patrick,….

Accelerator Physics Department Meeting July 26, 2006 Jean slaughter5 Four types of collaboration 1.Deliverables - person builds something, visits to install, debug, etc., then leaves; may need remote access 2.On-site Commissioning - person has moved to CERN (for ~1 year, say) and works daily with LHC group 3.1-on-1 Contacts - person works with a particular person or group located at CERN, with occasional trips to CERN to participate in a study, etc. 4.Remote Participation - person is part of a group at Remote Site, participating daily for shorter time periods "Training” can be performed at the Remote Site; periodic, shorter trips to CERN working with the "On-site" commissioners; people can continue to work remotely upon return

Accelerator Physics Department Meeting July 26, 2006 Jean slaughter6 Model Four Commissioning Team at CERN LARP Team Member Remote Site Critical Mass: people, consoles, video/audio, eLogs, meeting space, coffee, etc. collaborative beam studies “real time” off-line analyses periodic shifts special responsibility for communication with Remote Site Issue – how to make it happen?

Accelerator Physics Department Meeting July 26, 2006 Jean slaughter7 Status Remote Access Center for both CMS and LHC Design approved by Director and money found Construction starts ~Aug 19, 2006 E. Harms is project manager Erik Gottschalk is in charge of consoles, computers, projectors, etc. Console furniture arrives Nov 1, 2006 Ready for (limited) use Jan 1,

Accelerator Physics Department Meeting July 26, 2006 Jean slaughter8 – LARP/LHC needs CCC Model the CCC at CERN speed assimilation prior to stays at CERN ease in remote participation in studies ‘service after the sale’

Accelerator Physics Department Meeting July 26, 2006 Jean slaughter9 – Floor plan

Accelerator Physics Department Meeting July 26, 2006 Jean slaughter10 – renderings

Accelerator Physics Department Meeting July 26, 2006 Jean slaughter11 – Floor plan

Accelerator Physics Department Meeting July 26, 2006 Jean slaughter12 – Isometric view

Accelerator Physics Department Meeting July 26, 2006 Jean slaughter13 – Consoles

Accelerator Physics Department Meeting July 26, 2006 Jean slaughter14 – view from Atrium

Accelerator Physics Department Meeting July 26, 2006 Jean slaughter15 – Wall display

Accelerator Physics Department Meeting July 26, 2006 Jean slaughter16 – Window display

Accelerator Physics Department Meeting July 26, 2006 Jean slaughter17 Integration Task Force Replaces Task Force Draft charge and membership sent to Pier Oddone for final approval Subgroups Engineering LHC CMS Outreach

Accelerator Physics Department Meeting July 26, 2006 Jean slaughter18 Integration Task Force Jobs coordinate ongoing activities to complete construction of Phase 1; develop a plan for hardware and software tool development; develop requirements and cost estimates for Phase 2; develop requirements for outreach; develop a plan to support CMS and LHC/LARP commissioning activities; produce a list of capabilities that will provide for CMS and LHC/LARP, and an explanation of how these capabilities have been, or will be, achieved; develop an operations model for CMS and LHC/LARP that integrates the three functions of develop a support model for infrastructure; and develop an organizational structure that identifies roles and responsibilities.

Accelerator Physics Department Meeting July 26, 2006 Jean slaughter19 Outreach Working Group Charge from Director Identify the scope of outreach Identify the audience Decelop requiremnts to be incorporated in Phase II Working group members Fred Ullrich, Kurt R. Marge Bardeen, Liz Quigg, Sue Sheehan Erik gottschalk, Alvin toollstrup Jean Slaughter(chair)

Accelerator Physics Department Meeting July 26, 2006 Jean slaughter20 Current OWG Activities Developing scenarios Tour related Conference related Middle School and High school tours VIP tours (President \Bush, etc.) Senior citizens Technical groups Non-tour related Accidental tourist – biker, birder, walker… Intentional tourist – science junkie Fermilab staff, technical, non-technical

Accelerator Physics Department Meeting July 26, 2006 Jean slaughter21 Will be Useful? Obvious “yes” for CMS. ROC is a prototype. Obvious remote monitoring activities “Maybe” for LHC Solve security issues Run applications in “read-only” mode Access to data Critical mass of involved people McGinnis proposal practical approach

Accelerator Physics Department Meeting July 26, 2006 Jean slaughter22 Dave McGinnis Initiative Fortuitous meeting at CERN of Dave and Suzanne Gysin Addresses many of the concerns I’ve had over the past year regarding LARP commissioning activities and the use of for LHC. Recognizes two important facts Software is vitally important to commissioning a machine We have to contribute useful stuff to CERN to be engaged.

f LHC Software at Fermilab Goal  Fermilab wants to be involved in the commissioning and operations of the LHC.  For example, we are making a substantial investment in remote operations  It is difficult for outside visitors from other labs to make important contributions once beam commissioning has started. Unfamiliarity with the control system Critical problems are assigned to in-house staff.  Fermilab will be much more welcomed at CERN if it:  Can bring real resources to the table  Has the ability to solve operational problems

f LHC Software at Fermilab Accelerator Software  One possibility is to develop a suite of software products to enable Fermilab accelerator physicists to make key contributions to the beam commissioning of the LHC.  Fermilab has a wealth of experience in the software issues of running a collider complex  Comparable to the LHC, a significant portion of the Fermilab control system is based on Java  Fermilab has a large pool of software expertise to draw on.  A number of LARP hardware deliverables will require substantial software investment to make them useable. It might be unlikely that the software effort needed for these projects will receive a high priority from CERN

f LHC Software at Fermilab Lessons Learned from Run II  The importance of flexible “control room” software during Run 2 cannot be overstated.  It is impossible to foresee all the software applications necessary for commissioning before commissioning begins.  A framework is required that permits quick and flexible application development by machine physicists.  A mature shot data analysis framework must be available on Day 1 of LHC beam commissioning.  There is little need to diagnose the accelerator when things are working well.  It is difficult for outside visitors from other labs to make important contributions once beam commissioning has started.  Unfamiliarity with the control system  Critical problems are assigned to in-house staff.

f LHC Software at Fermilab Software Product Types  Specific programs needed by CERN  Developed in cooperation with CERN and under the leadership of CERN  Gives Fermilab access to the LHC control system  Programming environments and operational tools  Developed for the CERN control system  Aimed for use by Fermilab accelerator physicists initially CERN will initially be reluctant to use software developed from the outside  Designed for the eventual use by CERN staff once CERN realizes the benefit of the software  Accelerator Physics Modeling Code

f LHC Software at Fermilab Possible Software Products  Specific programs needed by CERN  SDA and OSDA  Role Based Access  Sequencers  Programming environments and operational tools  Synoptic Displays  GUI Application Builder  Accelerator Physics Code  CHEF, OPTIM

f LHC Software at Fermilab Software Products  SDA and OSDA  The most important products.  CERN has already expressed a strong interest in collaborating with Fermilab on SDA  Fermilab’s SDA and OSDA are written Java and might be straightforward to adapt to the CERN control system  Will have to develop the concept of “states” or “cases” at CERN  Role Based Access  This software is crucial for any outside collaboration to work on the LHC  As CERN begins to realize how vulnerable the LHC is to external settings, this software will become critical to maintain central control of LHC while still preserving the flexibility of remote monitoring and diagnostics.

f LHC Software at Fermilab Software Products  Synoptic Displays  Replace the Fermilab practice of “personalized” parameter pages with easily personalized synoptic displays Easy to use and personalize for both operators and engineers Takes advantage of high level data pool management. Avoid the pitfalls of using “LABVIEW”-like front ends  GUI Application Builder  Provides a graphical and menu based development environment for rapid application development by machine physicists  Similar to Visual Basic or Visual C++  Has access to a library comparable to CLIB for gathering accelerator data (BPMs, magnet settings, etc..)

f LHC Software at Fermilab Software Products  Accelerator Physics Code  CHEF, OPTIM, etc.. Graphical user interfaces to lattice calculations Advance calculation tools Interface to control system

f LHC Software at Fermilab LHC Software Team Composition  Computer Professionals  1.5 FTE’s from AD  1.0 FTE’s from CD  Operational Experts  Can write code  1.0 FTE’s from AD  Accelerator Physicists  Can write code  FTE’s  With 0.5 FTE as the team leader  This project would last 2-3 years  At least until the LHC is commissioned  The workload will change as LHC commissioning progresses  Demand for computer professional effort will be high at the beginning of the project.  Demand for operational specialist and accelerator physicist effort will increase as the LHC commissioning matures

f LHC Software at Fermilab Initial Team Tasks  Develop expertise on the CERN control system  CERN is pleading for experienced Java programmers to assist them with their current programming loads see last LHC-Mac presentation by P. Charrue  We should assign at least 1.5 FTE’s to help CERN Spend 35% of their time at CERN  These FTE’s in return become the liaisons with CERN Knowledgeable on the CERN control system Knowledgeable on CERN needs Builds good will with CERN  Further define:  software products  scope of work  resources required