OCTOBER 2, 2013 Maine 2013 Outage Coordination Redacted Copy.

Slides:



Advertisements
Similar presentations
Piedmont Improvement Program NC Society of Engineers
Advertisements

Project Management An Electric Utility Perspective Michael Jackovich President and Owner Project Management Plus, Inc. May 18, 2009 Copyright 2009 Project.
Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
What’s Inside / Coming Attractions
Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
CenterPoint Energy Houston Electric 2011 Response to Contamination Conditions John Kellum Director of Transmission Operations August 3, 2011.
Cleco Transmission Planning Summit 2011 Coughlin Transmission Operations Center April 15, :00 – 11:00am.
Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power.
Presentation to Maxwell Place Homeowners Association 1.
Nelson Hydro Downtown Conversion July 26, 2010 Project Overview.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
MARCH 31, 2014 Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
Midwest Energy, Inc. Transmission Planning and Expansion
Customer Meeting April 28, 2010 Torrington, WY. Agenda Introductions Accomplishments Update on Torrington Area PVVC Overview PVVC Schedule and Cost Estimates.
Stakeholder Information Update Edmonton-Calgary 500 kV Transmission Development December 14, 2005 Introduction Neil Millar, vice-president, Transmission.
OPERATING IN THE EAGLE FORD SHALE
NOVEMBER 11, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
AUGUST 19, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
Africa Geospatial Forum Geospatial Empowering Utilities.
Dayton Power and Light Patrick Slone EMS Safety Coordinator.
INTERNATIONAL RIGHT OF WAY ASSOCIATION | MARCH 20, 2015 STAKEHOLDER MANAGEMENT SOLUTIONS.
George Bartlett Director, Transmission Operations Economic Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
1 1 1 Central Maine Power Company Local System Plan Presentation Planning Advisory Committee Meeting October 21, 2010.
Potential Transmission Construction Scheduling In Southern Minnesota--- Fall Spring 2006 Xcel Energy has posted Significant Transmission construction.
Special Protection Systems - Market Rule Amendment Submission Presentation to: Market Operations Standing Committee Barbara Reuber, Regulatory Affairs.
Water System Planning Study
ISO Exhibit 13 Federal Energy Regulatory Commission Technical Conference on Connecticut Infrastructure Reliability and Operability Committee Update Hartford,
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting December 16, 2009.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
1 Transmission Line Projects in Maryland – an Overview Sandra S. Patty PPRP - Manager, Transmission Projects PPRAC Meeting Country Inn & Suites, Annapolis,
1 1 1 Central Maine Power Company Local System Plan Presentation Planning Advisory Committee Meeting November 17, 2011.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Jump Starting ITS Deployment in Los Angeles County using Wireless Communications Lessons Learned.
September 26, East Side Access Status Report to CPOC September 26, 2011.
1 1 1 Central Maine Power Company Local System Plan Presentation Planning Advisory Committee Meeting November 17, 2011.
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
Lee County Electric Cooperative 2007 Hurricane Preparedness Activities.
Business Data Communications, Fourth Edition Chapter 11: Network Management.
ISO Comparison – CAISO Alex Lee (ERCOT)
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
ATC Planning Zone Meeting Teresa Mogensen Director, Transmission Planning & Service Scott Barnhart Manager, Transmission Planning.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
AEP Corpus Christi TDC Advance Outage Scheduling Initiative.
Utility Engineers, PC.  Generation  Transmission  Distribution.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Response to TAC Questions on PGRR031 TAC– January 28, 2014 Jeff Billo, ERCOT 1.
Expanded Shave and Pave Program Roads and Parks Maintenance Department Development & Infrastructure Division October 23, 2012.
Maryland Public Service Commission 2006 Summer Reliability Status Conference May 16, 2006 Baltimore, MD.
BPA Pacific DC Intertie (PDCI) Upgrade Project WECC Path Rating Process PDCI 3220 MW North to South Phase 1 Kick-off Meeting October 23, :00-4:00.
SEMINAR PRESENATATION ON WIDEAREA BLACKOUT (AN ELECTRICAL DISASTER) BY:Madhusmita Mohanty Electrical Engineering 7TH Semester Regd No
Agenda Provide a recap of primary northern route alternatives for the MPRP Describe basis for selected route N5 Overview of analyses performed Description.
2007 Hurricane Season Preparedness Briefing
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

OCTOBER 2, 2013 Maine 2013 Outage Coordination Redacted Copy

Agenda Welcome, Introductions and Safety Expectations and Goals for Meeting MPRP Project Update Other CMP/BHE Projects Specific Outage Discussion, Key Fall 2013/Spring 2014 outages Questions Redacted Copy 2

Expectations/Goals Communicate significant planned 2013 Maine transmission equipment outages that could impact generation constraints Communicate specific outage coordination changes to limit impact on potential generation constraints Respond to outage coordination questions from the audience Redacted Copy 3

MPRP Project Statistics 452 miles of new or rebuilt 345kV and 115kV Transmission 183 miles of new 345kV Transmission 105 miles of new 115kV Transmission 5 miles of Rebuilt 345kV Transmission 140 miles of rebuilt 115kV Transmission 8 miles of rebuilt 34.5kV Sub Transmission 11 miles of 345kV and 115kV line terminations 5 new Greenfield Substations Albion, Coopers, Monmouth, Larrabee, Raven 6 Major Substation expansions Maguire, South Gorham, Surowiec, Gulf Island, Belfast, Livermore Falls 50 Remote end substation expansions or modifications 60 - Transmission line crossings Redacted Copy 4

Northern Loop Construction Construction Status – Albion Road Substation energized – All 115kV lines terminated into station – Construction of new 345kV line from Orrington to Albion Road – Various 115kV rebuilds Near term construction activities – Continued rebuild of two new 115kV lines and construction of a new 115kV line – Mechanical completion of Coopers Mills Road Substation Future construction activities – Completion of 115kV construction – Construction of new 345kV line – Energization of Coopers Mills Road Substation 5 Redacted Copy

Central Loop Construction Construction Status – Larrabee Road Substation energized – Construction of new 345kV line from Larrabee Road to Surowiec – Various 115kV rebuilds Near term construction activities – Continued rebuild of two new 115kV lines and construction of a new 115kV line – Energization of Gulf Island Substation – Energization of Livermore Falls Substation – Mechanical completion of Coopers Mills Road Substation Future construction activities – Completion of 115kV construction – Construction of new 345kV line – Energization of Coopers Mills Road Substation Redacted Copy 6

Southern Loop Construction Status – Raven Farm Substation mechanical completion – Various 115kV rebuilds Near term construction activities – Continued construction of 345kV line from Surowiec to Raven Farm – Energization of Raven Farm Substation – Mechanical completion of Maguire Road Substation – Energization of Surowiec Substation expansion Future construction activities – Completion of new 345kV line – Energization of Maguire Road Substation – Final energization of Eliot Substation Redacted Copy 7

CMP/BHE Capital and Maintenance Work Other Non-MPRP CMP Capital and Maintenance Work that affects the transmission system – Transmission Line Structure Replacements both Capital and Maintenance – System Planning related Substation rebuilds or expansions to support future reliability needs – Substation equipment replacements or upgrades to address maintenance concerns – Transmission Line re-rates or rebuilds to increase capacity – Substation maintenance equipment inspections and relay testing – Regulatory required relay and equipment trip checks Redacted Copy 8

CMP Outage Applications Central Maine Power had 1,200 outage applications in 2012 There have been 1,244 transmission (>34.5kV) and 641 sub- transmission (34.5kV) outage applications in 2013 The MPRP Project has submitted 761 outage applications for the project through October 2, 2013 The outages range in duration from a few hours to eleven months in length The MPRP team anticipates that there will be an additional 500 – 600 outages needed to finish the program Redacted Copy 9

Maine 2013 Transmission Outages Changes to plan typically result in increased construction cost – Costs include overtime, additional contractor resources, expedited material, additional engineering and outage coordination resources, environmental mitigation, schedule and remobilization costs, permitting, etc. Outages that have the potential for significant impact to generators in 2013 will be discussed – Long (greater than one week) duration outages – Significant potential generation constraints Redacted Copy 10

TRANSMISSION SYSTEM LIMITATIONS All facility in and single facility out conditions Redacted Copy

Transmission System Limits Impact On Generation Constraints Redacted Copy 12

Transmission System Limits Impact On Generation Constraints Redacted Copy 13

2013 Maine Major Outages 115 kV Outage Condition B Western Maine – 3 rd Qtr 2013 – 4 th Qtr 2013 ~ 3 month duration – 1 st Qtr 2014 ~ 2 week duration 115 kV Outage Condition C Western Maine – 3 rd Qtr 2013 ~ 3 week duration 345/115 kV Outage Condition F Northern Maine Area – 4 th Qtr 2013 ~ 1 week 345 kV Outage Condition G Northern Maine Area – 3 rd Qtr 2013 ~ 1 week 345 kV Outage Condition H Northern Maine Area – 4 th Qtr 2013 ~ 2 weeks Redacted Copy 14

2013 Maine Major Outages (cont.) 345 kV Outage Condition I Northern Maine Area – 3 rd and 4 th Qtr 2013 ~ 4.5 weeks 345/115 kV Outages Condition J Southern Maine Area – 3 rd Qtr 2013 – 4 th Qtr 2013 ~ 2.5 months 115 kV Outages Condition K Central Maine Area – Multiple outages – 4 th Qtr 2013 ~ 3 weeks – 1 st Qtr 2014 ~2.5 months – 2 nd Qtr 2014 ~ 3 weeks 345 kV Outage Condition L Northern Maine Area – 1 st and 2 nd Qtr 2014 ~ 7 weeks Redacted Copy 15

115 kV Outage Condition B Western Maine – Original Plan – 1 st Outage Redacted Copy 16

115 kV Outage Condition B Western Maine – Alternatives – 1 st Outage Purchase additional ROW to eliminate/reduce duration of outages – Too expensive for project – Siting and permitting delays Utilize more expensive construction techniques to reduce duration of Outage Condition B by 2 months – Implemented Utilization of a temporary SPS to increase limits for both outages – Eliminated Western Maine Export Interface limit – Increased Inner Rumford Export Interface limit – Increased Outer Rumford Export Interface limit – RPA could operate – Implemented RPA installed a Power System Stabilizer – Increases interface limits that are a limited by damping Do not take outages during the summer months – System operational capacity needs Re-sequence work in order to implement alternatives – Outage was delayed more than 12 months Updated generator dynamic models received Redacted Copy 17

115 kV Outage Condition B Western Maine – Current Plan – 1 st Outage Redacted Copy 18

115 kV Outage Condition B Western Maine – Original Plan – 2 nd Outage Redacted Copy 19

115 kV Outage Condition C Western Maine Redacted Copy 20

115 kV Outage Condition C Western Maine Redacted Copy 21

345/115 kV Outage Condition F Northern Maine Redacted Copy 22

345 kV Outage Condition G Northern Maine Area - Original Plan Redacted Copy 23

345 kV Outage Condition G Northern Maine Area - Current Plan Redacted Copy 24

345 kV Outage Condition H Northern Maine - Current Plan Redacted Copy 25

345 kV Outage Condition H Northern Maine - Current Plan Redacted Copy 26

345 kV Outage Condition I Northern Maine Redacted Copy 27

345 kV Outage Condition I Northern Maine Redacted Copy 28

345/115 kV Outage Condition J Southern Maine Redacted Copy 29

115 kV Outage Condition K Central Maine Redacted Copy 30

345 kV Outage Condition L Central Maine Redacted Copy 31

Redacted Copy 32