Maintenance Nov 28, 2007. Accelerator Access LINAC will remain on RA. It is not yet running. LINAC will remain on RA. It is not yet running. Booster-

Slides:



Advertisements
Similar presentations
AGS Status and Plans RHIC Spin Collaboration Meeting 2/4/11.
Advertisements

Maintenance and Accelerator Support RHIC Run 12. RHIC species change completed: Major works in RHIC: Major works in RHIC: Power supply reconfigure (DO.
WAO Travis Shrey RHIC Machine Specialist Collider-Accelerator Dept Brookhaven National Laboratory 10/30/2014.
July 01, Shutdown Machine Status:  NTF Treatments and Dosimetry as scheduled  Proton Source Commissioning and Studies RFQ Injector.
Outages During the Run Coping with the Power Company August 9, 2012.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
Accelerator Support and Maintenance Run 14. Maintenance/Changeover Day Major efforts RHIC: Major efforts RHIC: Access hrs. Access hrs.
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow Major efforts RHIC: Major efforts RHIC: Access hrs. Access hrs. RA.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
Take 5 for Safety Conduct of Operations – Control of Equipment and
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Maintenance and Accelerator Support RHIC Run 12. Accelerator Status: Complex is running for Physics. Complex is running for Physics. Checkout for NSRL.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Shutdown 2012 ES&H Friday April 27, 2012J. Anderson Jr. Page 1 Draft Schedule Beam off to Experiments 0000 Monday April 30 th Linac continues operations.
Maintenance and Accelerator Support RHIC run10. Last Wednesday: Nice recovery Nice recovery Good work all especially: Good work all especially: HP, RF,
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
AGS pp Status Mar. 17, 2015 Time Meeting Haixin Huang.
TS, Length of YETS EYETS LIU & CONS Project
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow AGS hrs CA Specific Jobs only. AGS hrs CA Specific Jobs only. RHIC.
RHIC Run th Time Meeting Tuesday 5 June 2012 WELCOME ! Safety first SP's slide Experiments and Machines, status 1 06/05/2012 Time Meeting, Run 12.
Maintenance and Accelerator Support RHIC Start Up 12.
2015 Shutdown Joe Compton 3/11/2015. RIL PIP Work  Install operational laser notcher  5 days  Dave Johnson & Todd Johnson.
Maintenance and Accelerator Support RHIC StartUp10.
Maintenance and Accelerator Support RHIC Start Up 12.
May 06, 2013 Photo by Greg Vogel. Thursday, April 18, some tunnel work had to be suspended and many planned jobs had to be postponed due to the flooding.
AGS/Booster Status March 11, 2014 Time Meeting Haixin Huang.
Polarized source upgrade. Source upgrade project Main component delivery: Atomic Beam Source- August 2011 Superconducting solenoid- March-2012.
Proton Improvement Plan: View from the Directorate (and the DOE) Stuart Henderson PIP Meeting Jan 3, 2012.
1 AGS RSVP Review 4-5 November 2004 Upgrade and Operations Cost & Schedule Summary Philip Pile Collider-Accelerator Department 4 Nov 2004.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
PEP-II Reliability and Uptime Roger Erickson 13 October 2003 With thanks to C.W. Allen, W. Colocho, P. Schuh, M. Stanek, and the Operations staff members.
Machine Status  Proton Source Commissioning and Studies 8/13-8/14: Linac & Booster Maintenance Period  Main Injector MI30 vacuum ○ Work continues to.
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
 Safety  Schedule: Past, Present and Future  RHIC and Experiments Reports  Machine and Systems Reports  AOB.
July 15, 2013 Photo by Greg Vogel. Shutdown Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster.
Lead from the front Texas Nodal 1 EDS Market Call Weekly Update Jan 30, 2009.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
F All Experimenters' Mtg - 6 Jan 03 Week in Review: 12/30/02 –1/05/03 Ron Moore – FNAL Store Summary – Best week! > 7 pb -1 Machine Studies/Maintenance.
March 4, 2013 Photo by Martin Murphy. Shutdown 2012 Machine Status: Linac running with NTF Treatments, RFQ and Linac commissioning Booster beam commissioning.
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
All Experimenters’ Meeting November 4, Accelerator Operation Summary Calendar Week # 44 NuMI Weekly Integrated Intensity 5.97 E18 protons BNB.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
Accelerator Support and Maintenance Startup for Run 13.
Time Meeting March 29, W. Christie Blue Ring Magnet String issue: -on Friday morning 7am (18 March 2016) a problem developed in the RHIC Blue ring.
Accelerator Support and Maintenance Startup13. Access LIPA work Friday LIPA taking feed for Booster MMPS down for emergency repair. LIPA taking feed for.
5/15/ meeting. -21 work days to shutdown -31 calandar days to shutdown -Today is May 15 th all Jobs are supposed to be entered in the work list.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
Injector Status Jan. 26, 2016 Time Meeting Haixin Huang.
Maintenance and Efficiency
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
YETS & LS2 Works EN-EL / Power distribution
YETS & LS2 Works EN-El on LHC / Power distribution
CUB Outage Schedule April 21, 2006.
Injector De-cabling Project
YETS & LS2 Works EN-EL / Power distribution
Alexander Herlert, CERN (PH-SME-IS)
در تجزیه و تحلیل شغل باید به 3 سوال اساسی پاسخ دهیم Job analysis تعریف کارشکافی، مطالعه و ثبت جنبه های مشخص و اساسی هر یک از مشاغل عبارتست از مراحلی.
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
Experimental Areas – LS2 planning
Isotope Readiness Review Run Plans
Presentation transcript:

Maintenance Nov 28, 2007

Accelerator Access LINAC will remain on RA. It is not yet running. LINAC will remain on RA. It is not yet running. Booster- No Access. Booster- No Access. AGS- RA hrs. AGS- RA hrs. RHIC Experimental and select areas on RA. RHIC Experimental and select areas on RA. RHIC RF area on 1004b control am. RHIC RF area on 1004b control am.

Schedule: Injectors off at 0600hrs. Injectors off at 0600hrs. RHIC off at 0800hrs or dump. RHIC off at 0800hrs or dump. AGS Swept secured at 1400hrs. AGS Swept secured at 1400hrs. RHIC areas swept as work is completed or 1500hrs. RHIC areas swept as work is completed or 1500hrs. Experiments Swept at 1600hrs. Experiments Swept at 1600hrs. RHIC secured by 1700hrs. RHIC secured by 1700hrs.

Major impact jobs Power outage at 4B panel P4BRP5. Power outage at 4B panel P4BRP5. Substation R, building 929 RF equipment affected. Substation R, building 929 RF equipment affected. AGS vacuum chamber at L5 replacement. AGS vacuum chamber at L5 replacement.

Reminders: Approved jobs only. Approved jobs only. Testing period after jobs completed. Testing period after jobs completed. Affected groups input for job closeout. Affected groups input for job closeout. Personnel available until systems prove operational. Personnel available until systems prove operational.