US 36 Commuting Solutions Northwest Rail Westminster Segment/Eagle P3 Oct. 14, 2014.

Slides:



Advertisements
Similar presentations
Piedmont Improvement Program NC Society of Engineers
Advertisements

National Utility Contractors Association of Colorado Wings Over the Rockies Air and Space Museum March 19, 2015.
RTD FasTracks Overview ColoRail Winter Meeting
D2 Roadway Discussion Sound Transit Board September 22, 2011.
An Advanced Transit Alternative for The Princetons Alain L Kornhauser 24 Montadale circle Board Chair Advanced Transit Association Founder ALK Transportation.
North Florida AACEi. Project History July 18, 2011 – Phase I FFGA signed at Florida Hospital ceremonies Nov. 3, 2011 – FDOT purchased the corridor from.
Duane Hill, District Engineer
Denver RTD and Its Role in TOD ULI Cleveland - Moving the Needle: A National and Local Perspective on Transit Oriented Developments June 26, 2013.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
Colorado Rail Passenger Association Spring Meeting June 1, 2013.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
HUDSON-BERGEN LIGHT RAIL TRANSIT SYSTEM HUDSON-BERGEN LIGHT RAIL TRANSIT SYSTEM Facts and Highlights Facts and Highlights.
Update of Downtown Rail Improvements DFWI & Chamber Stakeholders February 26, 2014 Alonzo Liñán, PE, PTOE City of Fort Worth.
INTERCITY PASSENGER RAIL NORTHEAST UPDATE AASHTO – FEBRUARY 29,
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
Silver Line: Coming Soon Serving Reston to Largo via the District of Columbia Washington Metropolitan Area Transit Authority October 19, 2013 Presentation.
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
ASSOCIATION OF AMERICAN RAILROADS Chicago Area Rail Infrastructure 16,000 acres, twice the area of O’Hare 78 yards, including 21 intermodal (rail-truck)
North Metro Rail Line FasTracks Citizens Advisory Committee September 18, 2013.
Presentation Overview Eagle Project Overview Key Participants & Organizational Structure Project Status, Approvals and Schedule Questions? Grandview Landscaping.
The Miami Intermodal Center September 23, 2009 Is Becoming a Reality!
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) November 28, 2012 Adopted: July 18, 2012 Item.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
North Metro Rail Line Request for Proposals (RFP) Commerce City Council August 19, 2013.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Interstate 95 Corridor Improvement Program June 20, 2012.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 15, 2009.
Winchester Medical Center Campus Expansion June 21, 2011.
Green Line Extension Environmental Impact Report Public Scoping Session Somerville High School October 19, 2006.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
McKellar Park Information Session
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
Eagle Project Update Eagle P3 Project Update FasTracks Monitoring Committee Feb. 4, 2014.
Eagle P3 Project Update FasTracks Monitoring Committee Sept. 3, 2013.
Eagle P3 Project Update FasTracks Monitoring Committee May 13, 2014.
Preliminary Gold & Northwest Corridors Service Plan 1.
North Metro Competitive Procurement RTD Board FasTracks Monitoring Committee October 8, 2013.
1 Eagle P3 Project Update FasTracks Monitoring Committee Dec. 2, 2014.
1 Eagle P3 Project Update FasTracks Monitoring Committee May 12, 2015.
Maintenance and Temporary Traffic Control
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
1 Commuter Rail Oversight RTD Operations and Customer Service Committee May 24, 2016.
1 Eagle P3 Project Update FasTracks Monitoring Committee September 1, 2015.
Transit Technology Hampton Roads Transit. Hampton Roads Transit (HRT) provides public transportation for six cities in the South Hampton Roads region:
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
2014 Annual Program Evaluation (APE) Status Update April 1, 2014.
2015 Annual Program Evaluation (APE) Status Update July 14, 2015.
Stage 2 Light Rail Transit Program “In the ground ready”
Inspection Davenport IA
Northwest Area Mobility Study FasTracks Monitoring Committee
Regional Roads Committee
Operations and Service Concept
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Highway 14 – Owatonna to Dodge Center District 6 Update
Safety Tip FQ18086 RHODE ISLAND AVENUE METRO STATION TRACK DECK AND PRE-CAST PANEL REHABILITATION Please use full fall Protection gear when using 6’ or.
“A P3 Success Story” RTD’s EAGLE P3 Project
25th Avenue Grade Separation
25th Avenue Grade Separation
M14A/D Select Bus Service
2014 Annual Program Evaluation (APE) Status Update
Harbour Island Force Main Replacement
Presentation to City of Palo Alto Rail Committee on Quiet Zones
AN INVESTMENT IN CALIFORNIA’S FUTURE
Presentation transcript:

US 36 Commuting Solutions Northwest Rail Westminster Segment/Eagle P3 Oct. 14, 2014

2 Economic Impacts Through August 2014, the RTD Eagle P3 Project added more than $1 billion to the local economy DTP Wages Paid$145 million Equipment, services and supplies$347 million Subcontractors$522 million DTP currently has more than 1,625 employees, with a total of 5,230 employees working on the project to date DTP has subcontracted to more than 620 firms that employ crews and purchase supplies locally DTP directly contracts with local certified Disadvantaged Business Enterprises (DBEs)/Small Business Enterprises (SBEs) – currently on track to exceed our 20% commitment to both DBEs/SBEs

3 Design Progress Design Civil design work almost 100 percent complete Typical design questions and issues continue to be raised during construction and are handled by DTP with RTD oversight Safety certification of the designs is progressing well Construction is 63 percent complete and on schedule for revenue service in 2016 Track crew works on crossover switch on approach to Denver Airport Station

4 Systems Progress Systems Traction power substation installation far along Energizing from the Xcel grid scheduled for fall Overhead wire installation nearly complete along East Rail Line Installation of train control equipment houses under way throughout the project in advance of other wayside equipment installations, including grade crossing equipment Track gantry (foreground) and RTD substation (background) at Sandown will feed power to the East Rail Line

5 Commuter Rail Vehicle All 50 car bodies from the base order are in Hyundai Rotem’s assembly facility in Philadelphia Six option car bodies to arrive in plant by October; 10 additional cars due in 2015 First cars completed, awaiting final inspection and shipment to Denver this fall Public viewing tentatively planned in mid-November; official announcement forthcoming

6 Maintenance Facility Building completed, Denver has issued Certificate of Occupancy Operations Control Center near completion Grading work for drainage continuing across the site OCS poles and yard light poles installed Ballast and track work well under way Separate train wash building closed in, wash system installation under way The building structure is complete; track and power installation under way

7 Northwest Rail Westminster Segment 6 miles from Denver Union Station to Westminster Station at 71st/Irving Three construction areas: –Denver –Adams County –Westminster Electrified Commuter Rail 6 major bridges (5 rail, 1 road) 11 minute travel time Opens 2016; current plan is to open after East and before Gold Westminster Station looking southwest

8 Northwest Rail Westminster Segment Construction Progress Platform construction Precast underpass installation Underdrain installation Water line relocations between Federal and 64th Avenue Clear Creek Bridge spans 7-8 and 9-12 Clear Creek Bridge looking southeast from 64th Avenue

9 Northwest Rail Westminster Segment Operations Plan* Northbound weekdays: –30 minute headways 5:43-8:13 am, 3:13-6:43 pm –60-minute headways off-peak until 10:13 pm Southbound weekdays: –30 minute headways 6:05-8:35 am, 3:35-6:35 pm –60-minute headways off-peak until 9:35 pm Northbound weekends: –60-minute headways 6:13 am-10:13 pm Southbound weekends: –60-minute headways 5:35 am-9:35 pm Gold Line/Northwest Rail Westminster Segment * Northbound trips stop at Pecos Junction Station; southbound trains do not stop; Northwest trains do not stop at 41st/Fox

10 Northwest Rail Westminster TOD Original plan was surface parking Westminster will build structured parking for 350 vehicles on opening day; expand to 1,000 in 2030 Station enhancements include connection to new Little Dry Creek park area Westminster Station looking northeast over new regional park

11 East Rail Line 40th Avenue between Blake to York streets reopened on June 30 after 18-month closure Platform concrete pours and canopy work underway Most corridor protection barrier construction nearing completion At-grade crossings well under way Work crew walks through Triple-Stack Underpass at DIA

12 Gold Line/NW Rail Gold Line grade crossings are being done one after another to minimize detour distances Moffat Bridge girders successfully installed Several water line relocations currently under way Track installation in progress on South Platte bridge, in Arvada and Wheat Ridge NW Rail Clear Creek bridge girders set on north side Pedestrian underpass at Arvada Ridge Station, July 29, 2014

13 Questions?