Beamline Conceptual Design Overview and Interface Management

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring - Conventional Facilities Interfaces Erik Johnson, Accelerator Systems Interface Manager Accelerator Systems.
Advertisements

11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Necessity of Moving from Green Book to White Book M. Hadi Hadizadeh Yazdi International Scientific Meetings Office Iran October 26, 2002 Amman, Jordan.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to ASAC R. Casey Radiation Shielding: Assumption and Design April 24, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Damping Wiggler Beamline: XAS Preliminary Design Summary Paul Northrup January 16th,
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
1 Roger Erickson 1 Coordination with Accelerator Systems NEH Accelerator Readiness Review Coordination with Accelerator Systems.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Accelerator Installation Plan Gregory Fries Project Engineer, Accelerator Systems Division CFAC Review of NSLS-II.
BROOKHAVEN SCIENCE ASSOCIATES Radiological Design Considerations of Synchrotron Radiation Facilities P.K. Job Radiation Physicist National Synchrotron.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Update Aesook Byon NSLS-II Deputy Project Director CFAC October 5, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Steve Hulbert, for John Hill CFAC May 8, 2007 Experimental Facilities Update.
1 BROOKHAVEN SCIENCE ASSOCIATES John Hill PAC May 24 th 2007 Initial Beamline Suite and Beamline Development.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Role in NSLS-II Operations Marty Fallier Conventional Facilities Advisory Committee Review October 5-6, 2009.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
1 BROOKHAVEN SCIENCE ASSOCIATES Lonny Berman and Dario Arena, NSLS Summary The present built-out NSLS-II design includes: 30 bending magnet ports, each.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
Electromagnetic radiation sources based on relativistic electron and ion beams E.G.Bessonov 1.Introduction 2.Spontaneous and stimulated emission of electromagnetic.
SR Vacuum Systems and Front Ends
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Nanoprobe Beamline K. Evans-Lutterodt November 8th, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Experimental Facilities Overview Qun Shen Director, Experimental Facilities Division NSLS-II Experimental Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview John Hill Experimental Facilities Division Director NSLS-II XPCS/SAXS workshop Jan 10 th 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Hard X-Ray Wiggler Sources at NSLS-II Oleg Chubar X-ray source scientist, XFD, NSLS-II Workshop on Preparation of High-Pressure.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Overview Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: the Accelerator System Briefing Conventional Facilities Advisory Committee May 8 - 9, 2007 Satoshi Ozaki Director,
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review – May 11, 2007 S. Sharma NSLS-II Frontends and Canted Wigglers Options Sushil Sharma.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Beamlines Qun Shen NSLS-II Experimental Facilities Director NSLS-II Project Advisory Committee Meeting.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Status & Charge to ASAC Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director.
1 BROOKHAVEN SCIENCE ASSOCIATES Experimental Facilities John Hill CFAC review October 18 th, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES John Hill EFAC May 10 th 2007 Experimental Facilities Overview.
1 BROOKHAVEN SCIENCE ASSOCIATES User Access and Beamline Development John Hill Director, NSLS-II Experimental Facilities Division NSLS-II User Workshop.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Experimental Facilities John Hill Director, NSLS-II Experimental Facilities Division NSLS-II User Workshop July 17, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Experimental Facilities J.P. Hill Experimental Facilities Division Director PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-to-NSLS-II beamline transition plan Outline Reasons, Scope, Criteria, Further input, Timeline Transition plan, Beamline.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: Accelerator System Overview NSLS II Advisory Committees October 18/19, 2006 Satoshi Ozaki.
1 BROOKHAVEN SCIENCE ASSOCIATES Redundancy Requirements for Critical Devices R. Casey August 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Insertion Devices: Wigglers and Undulators Session 6 Insertion Devices Group 11/1/12.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
ELECTRON MOVING AT CONSTANT VELOCITY
1 BROOKHAVEN SCIENCE ASSOCIATES Experimental Facilities Trust Fund and Cost Estimate.
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review Conventional Facilities Update Marty Fallier Director for Conventional Facilities May 10, 2007.
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview John Hill Experimental Facilities Division Director NSLS-II Nanoprobe Workshop February 15 th 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Strategic Planning John Hill Experimental Facilities Division Director NSLS-II EFAC May 5 th 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beamline Development John Hill NSLS-II Experimental Facilities Division Director PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting March 29-30, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Summary of Shielding Calculations for NSLS2 Accelerators P.K. Job Radiation Physicist Peer Review 2007 March
1 BROOKHAVEN SCIENCE ASSOCIATES A Wiggler Beamline for XAS at NSLS-II Paul Northrup NSLS-II Project and Environmental Sciences Department Brookhaven National.
1 BROOKHAVEN SCIENCE ASSOCIATES Beamline Development and Facility Usage.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director NSLS-II PAC Meeting.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Overview Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Experimental.
Experimental Facilities Planning
LCLS Ultrafast Science Instruments
X-Ray Transport, Optics, and Diagnostics WBS Alan J
Instrument Readiness Review at NSLS II
LCLS Photon Systems Overview
Presentation transcript:

Beamline Conceptual Design Overview and Interface Management Andy Broadbent Experimental Facilities Division, NSLS-II Experimental Facilities Advisory Committee Meeting April 23-24, 2009

Activities Since Last EFAC Meeting Beamline selection and design iteration; CD-3 reviews (and approval); BAT Meetings (reports provided); Front End Design Progress (with ASD); Beamline standard utilities and hutches specified; XBPM workshop.

Schedule Baseline: Beamline Design Plans CD-3 Review Remaining design time prior to procurement start: 18 months. Completion of design of other items: 13 months. Procurement start EF beneficial occupancy

Beamline Conceptual Design Activities Initial conceptual layout of beamline optics; Analysis of heat load on optics; Heat load analysis to XFD Director (review); Revised conceptual layout of beamline optics; BAT technical review of beamline conceptual layout; Initial comprehensive beamline layout (CAD model); Ray tracing for synchrotron and Bremsstrahlung radiation; Initial safety assessment of beamline layout; Shadow ray tracing for performance characteristics; List of major beamline components by sub-system; Revise cost estimate for beamline; Draft beamline CDR; Safety review of beamline conceptual design; BAT technical review of beamline conceptual design.

Beamline design refinement (in progress) BAT meetings held, now incorporating recommendations Some extremely detailed (eg SRX, despite late start), and all very useful. Optimization of the insertion Devices Analysis of optical configurations (started working with vendors to ensure they can meet our requirements – see later talk by Qun) Visits to other facilities to discuss technical solutions Engineering design activities (eg Brem and SR ray tracing) Vibration measurements and modeling (N Simos, CFD) Weekly meetings to discuss technical aspects.

Elements of a Typical Beamline WBS Enclosures * Generic SOW written and reviewed. Beam transport Utilities ** RSI document completed and signed-off. White beam components Work in progress (allied to FEs). High heatload optics *** FEA work in progress. Beam conditioning optics Some estimates made for mirror specifications. PPS EPS End station Significant R&D work in progress. Beamline controls Beamline control station Beamline management Insertion device (SRX only in XFD) Much analysis performed.

List of Project Beamline Insertion Devices Comment IXS IVU, (probably) custom Requirement to maximize flux at 9.1 keV. HXN IVU, standard 3m U20 CHX CSX EPU custom pair Optimization work on period (~49mm) in progress. SRX IVU, custom U21, 1.5m proposed as optimized choice. XPD DW, standard 7m

Insertion Device Optimization Example Detailed work by Oleg Chubar. 3. Calculate allowable IVU device length from gap vs length constraints, due to accelerator and space for canting magnets. 2. Plot gap required to get 4.7keV on third harmonic against period. 1. Calculate fundamental minimum energy against gap for different IVU periods. 4. Select spectrum!

Typical Front End Configuration Ratchet Wall Collimator Individual Beamline Front End Designs are ~70% Complete. Safety Shutter (second if required) Fast Gate Valve Photon Shutter XBPM XBPM Fixed Aperture Mask Slow Gate Valve Bending magnet photon shutter Safety Shutter Collimator X-Y Slits Courtesy of L Doom, B Gash, PK Job, V Ravindranath, S Sharma, ASD Collimator

Front End Design Progress

Front End Adjustable Slits Significant value engineering performed on the slits; these will also be used on the beamlines, outside the shield wall.

Beamline Standard Utilities Pack Requirements, Specifications and Interfaces document defines: The beamline interfaces to conventional facilities and accelerator systems; The beamline utilities at the point of usage. Extensively reviewed and approved. Reference document for design of beamlines.

XBPM Workshop: 26/27th Feb 2009 Important interface area between XFD and ASD. Experts from APS, BNL, Cornell, Diamond, SLS, DESY. Detailed report written, with recommendations and some possible collaborations to pursue. Conclusions and detailed recommendations in report (many are no-, or low-cost).

Follow up actions from previous EFAC meetings – see handout. All closed out. Example, checking of “fit” of IR Front End.

Technical Issues: Power Quality and UPS Systems Facility emergency power only provided for life safety systems. No facility-wide UPS or back-up generators. Discussion at recent CR review considering merits of UPS systems, particularly for cryocoolers; Laboratory power quality data obtained Assess the annual frequency – outages of >5 minutes number ~2 per annum Average 1 storage ring trip/month at NSLS (~1 hr to restart). Minimize the impact Modern cryo-coolers more tolerant of outages and are single phase devices, substantiating data from recent customers Recent direct cooled crystal seal designs are more tolerant of thermal cycles Small UPS systems can be specified into high impact systems Currently revisiting this topic …. goal to conclude (report) by June…

Interface Management – the Practicalities VERY regular interaction with the CFD staff and the architects. Careful review and checking of the building design submissions: written summary of issues at 80% and 100% design submissions. Much advice taken from other facilities. Careful Interface Management, and co-operation of the interface managers to: informally work with project team members from other divisions; collaborate with Erik to setup and use sharepoint ; this is a wonderful facility resource to improve collaboration in a large team; make effective use of meetings - set up when needed; Arrange workshops (eg XBPM), as needed; Hold specific working group meetings (eg IDs for long straights).

Cost Baseline. Cost baseline for 1.04.05 (User Instruments) is $65.8M with escalation and burdens. Project initial scope is within the CD-2 baseline budget. Refined cost estimates of high value components prior to CD-3 eg hutches, HXN remote station and tunnel, and some optics. Will continue to refine costs and produce a cost range for CDR. Experimental Facilities (XFD) $65,824,486 Powder Diffraction Beamline $9,897,480 SRX Beamline $10,707,772 Soft X-ray Coherent Beamline $11,239,960 Hard X-ray Coherent Beamline $10,041,839 Inelastic X-ray Scattering Beamline $10,435,753 Nanoprobe Beamline $13,501,681

Issues and Coming Activities Re-budgeting exercise; As designs iterate this becomes more important; Check prices and scope; complete by end Sept 09 and include with CDR. Completion of CDR; Still a lot of work to do, but SRX has made up for late start; Continued Engineering design and analysis: Heat load analysis of optical elements; Insertion device optimization.

Conclusions Work on the Beamline CDR documents progressing well; End of September 2009 deadline. Taking advice from other facilities on specific topics. Proactive management of interfaces with CFD and ASD; Insertion devices, Front ends, Building and systems.