Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, 20021 SLAC EPICS Projects Yesteryear, Today, and Tomorrow.

Slides:



Advertisements
Similar presentations
LCLS Control System Overview Mike Zelazny SLAC ICD Software Department Accelerator Directorate.
Advertisements

SPEAR Upgrade – EPICS Status
Stephanie Allison Integration with the SLC Control April 7, 2005 Introduction PNET Receiver VME Module SLC-Aware IOC Existing.
Tom Himel Linac Controls Upgrade Nov SLAC National Accelerator Laboratory 1 Linac Controls Upgrade Status Tom Himel.
Brian Martlew 6 th June 2006 Controls Ground Rules Brian Martlew.
Stephanie Allison LCLS Integration with SLC October 12, 2004 Integration with SLC LCLS Facility Advisory Committee Oct 12, 2004 Introduction.
1 Tom Himel 1 Status of the Linac Controls Upgrade LCLS FAC review Status of the Linac Controls Upgrade Tom Himel June 8, 2009.
Stephanie Allison Integration with the SLC Control Oct 27, Introduction Demo SLC-Aware IOC Plans for Next 12 Months.
LCLS Control Group FAC - Controls April 7, 2005 Controls Overview April 7, 2005 Outline ES&H Goals FAC Responses.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Oct. 30, 2007 LCLS FAC D. Fairley MATLAB Feedback Phase II Commissioning.
Patrick Krejcik LCLS November 11-12, 2008 SLAC National Accelerator Laboratory 1 Post-commissioning Controls Enhancements.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
Integrating Acquired Subsystems Bob Dalesio 09/21/99.
Stanford Linear Accelerator Center Next Linear Collider Test Accelerator EPICS Support S. Allison, R. Chestnut, M. Clausen, K. Luchini.
Argonne National Laboratory is managed by The University of Chicago for the U.S. Department of Energy P0 Feedback Project: Merging EPICS with FPGA’s Nicholas.
R. Lange, M. Giacchini: Monitoring a Control System Using Nagios Monitoring a Control System Using Nagios Ralph Lange, BESSY – Mauro Giacchini, LNL.
SPEAR 3 Upgrade SSRL/SLAC January 2001  Computer Control System  Beam Monitoring and Feedback Systems  Timing System  Machine Protection Systems 
Elder Matias Canadian Light Source University of Saskatchewan CLS – Control System Overview.
BPM DAQ for KEK Linac EPICS IOC using WindowsXP-based Oscilloscope for BPM DAQ System in KEK e-/e+ Linac Masanori Satoh (KEK Linac) June 13-16, 2011 EPICS.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN The status of PLS EPICS application EPICS collaboration.
1 Progress of the Controls for BEPCII EPICS Seminar Presented by J. Zhao 20 August, 2002.
EPICS in SLAC Controls Ron Chestnut, SLAC Beijing, 2001.
CLS: Control System E. Matias, R. Berg, G. Wright, T. Wilson, T. Johnson, R. Tanner and H. Zhang Canadian Light Source University of Saskatchewan Invited.
Update on FPGA/IOC applications and RTEMS developments at the APS W. Eric Norum
Dayle Kotturi Lehman Review May 10-12, 2005 Low Level RF Outline Scope Local feedback loop requirements Solutions Costs How this.
Dec 8-10, 2004EPICS Collaboration Meeting – Tokai, Japan MicroIOC: A Simple Robust Platform for Integrating Devices Mark Pleško
Running EPICS on NI CompactRIO Initial Experience Eric Björklund (LA-UR )
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.
March 2008EPICS Meeting in Shanghai1 KEKB Control System Status Mar Tatsuro NAKAMURA KEKB Control Group, KEK.
K. Luchini LCLS Controls, July 1, 2005 SLAC Aware IOC EPICS Magnet Functional Requirements Introduction Magnet Functions.
Operational SNS Karen S. White Controls Group Leader 10/11/10.
Operations, Test facilities, CF&S Tom Himel SLAC.
EPICS Control Software Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 LLRF Outline System Concept Review Requirements.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Booster Top-off Computer Controls System C. Timossi November 22, 2004.
LCLS Control Group EPICS Collaboration April 27, 2005 Controls Overview April 27, 2005 Outline Goals Status update.
Fast Fault Finder A Machine Protection Component.
The recent history and current state of the linac control system Tom Himel Dec 1,
BIC Issues Alan Fisher PEP-II Run-4 Post-Mortem Workshop 2004 August 4–5.
Stephanie Allison SLC-Aware April 5, 2005 Introduction Description Issues Progress Plans for 2005 SLC-Aware IOC LCLS Collaboration,
Managed by UT-Battelle for the Department of Energy Kay Kasemir Jan Experimental Physics and Industrial Control System.
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg June 18-20, SLAC Tune Tracker/Feedback Mike Laznovsky.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
JLab Accelerator Controls Matt Bickley MaRIE discussion April 26, 2016.
Magnet Low Current PS Upgrade Kristi Luchini,Sandeep Babel, Till Straumann, Mitch D’Ewart, Briant Lam, Dave MacNair May 19, 2016 VME to Emedded Industrial.
Fermilab Control System Jim Patrick - AD/Controls MaRIE Meeting March 9, 2016.
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
ATF/ATF2 Control System
LLRF Controls Outline Requirements External Interfaces Schedule Design
LLRF and feedback Outline Scope LLRF Requirements
LLRF and Beam-based Longitudinal Feedback Readiness
The IFR Online Detector Control at the BaBar experiment at SLAC
LLRF Control System Outline Scope Requirements Design Considerations
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
Next Linear Collider Test Accelerator and EPICS
LLRF Control System Outline Scope Requirements Options considered
Linac Coherent Light Source (LCLS) LLRF Preliminary Design Review LLRF Monitor and Control System September 26, 2005 Ron Akre.
Low Level RF Design Outline Scope Requirements Options considered
EPICS: Experimental Physics and Industrial Control System
EPICS at SLAC EPICS/SLC Controls Co-existence LCLS Injector Support
EPICS status and future at KEK Control Group / Commissioning Group e-/e+ Injector Linac, KEK, Japan Masanori Satoh.
LCLS Control System Personnel Linac & BC2 Controls progress
Presentation transcript:

Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow

Ron ChestnutEPICS Collaboration Mtg May 21-23, Present ESD EPICS PEP-II RF – 8 VXI-based stations Bunch Injection Damping Ring RF – Allen Bradley support Bucket-wise luminosity monitor NLC Test Accelerator – 2 VME IOCs — 60/120 Hz pulsed operation PEP-II Tune tracker Other SLAC EPICS Projects — Longitudinal Feedback – John Fox’s group — SPEAR III upgrade (Ongoing) — BaBar – Slow control – many IOCs.

Ron ChestnutEPICS Collaboration Mtg May 21-23, EPICS Tools and Applications StripTool is now a sine qua non of the control room Channel Archiver being mated to Oracle for speed and flexibility VDCT (newest Database Configuration Tool) now treated as a reliable tool. EDM (newest Display Manager) now available at SLAC for test Alarm Handler in use Strong core of EPICS developers, growing as we speak.

Ron ChestnutEPICS Collaboration Mtg May 21-23, Fill and luminosity data

Ron ChestnutEPICS Collaboration Mtg May 21-23, NLC Test Acc. Upgrade Veetest & Labview ( ½ Hertz) EPICS replacement — Two new IOCS — 60 Hz RF control Scanning ADC fault data Complex subroutine records

Ron ChestnutEPICS Collaboration Mtg May 21-23, PEP-II Tune Tracker

Ron ChestnutEPICS Collaboration Mtg May 21-23, ESD EPICS Devices Allen Bradley – DCM-based GPIB – ethernet LAN and Industry Pack Shared Memory – Bit3 Many SLAC-specific RF VXI-based modules CAMAC hardware and drivers from TJNAF VSAM (Slow analog)– BaBar and NLCTA ADC, TDC, DAC, Dig. I/O – NLC Test Accelerator

Ron ChestnutEPICS Collaboration Mtg May 21-23, Current ESD Epics Projects NLC 8-Pack Support (Due end of Autumn) — Next Step for the NLC Test Accelerator — New ADCs, RF Control General GPIB support (Wishlist) — Replacing HPUX-based GPIB support PEP-II RF upgrade (Due end of Summer) — More RF stations, enhanced VXI RF modules

Ron ChestnutEPICS Collaboration Mtg May 21-23, Current EPICS Plans Upgrade PEP-II RF IOCs from niCpu030 to PPC VXI Controllers Move all production to during the summer Provide SNL/SEQ support Continue to coordinate SLAC-wide EPICS Look seriously at RTEMS Switch to VDCT Keep abreast of 3.14 readiness Provide SLAC EPICS training

Ron ChestnutEPICS Collaboration Mtg May 21-23, Linear Coherent Light Source Just passed CD-1 Lehman review SLAC/LLBL/LLNL/Argonne collaboration 270 Million dollar project Construction start 2006/ready 2008 — When do we get first real money? EPICS to be used wherever reasonable

Ron ChestnutEPICS Collaboration Mtg May 21-23,

Ron ChestnutEPICS Collaboration Mtg May 21-23,

Ron ChestnutEPICS Collaboration Mtg May 21-23, LCLS Injector in EPICS SLC Timing Injector IOC Klystron 1 Klystron N MPG Beam Codes BGRPS Etc. Timing slave to SLC Timing master for Klystron IOCs Evaluate APS / SNS timing systems All Klystrons either fully SLC or fully EPICS! ANL EPICS for Undulator

Ron ChestnutEPICS Collaboration Mtg May 21-23, LCLS Site Plan

Ron ChestnutEPICS Collaboration Mtg May 21-23, LCLS Undulator Controls Supplied by Argonne APS - lock, stock, and barrel — Employs and extends designs from LEUTL (Low Energy Undulator Test Line) — All EPICS, 16 VME IOCs Argonne and SLAC EPICS groups will coordinate efforts during the whole project — Timing — Machine Protection — Networking — Global Feedbacks — EPICS Details VME Crates, CPU types Naming Convention Database and screen design — Commissioning and integration