NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.

Slides:



Advertisements
Similar presentations
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
Advertisements

04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.
Tullio Grassi ATLAS–CMS Power Working Group 31 March 2010 DC-DC converters and Power Supplies requirements for CMS HCAL Phase 1 Upgrade.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
Susanne Kersten, Wuppertal University November 21/22, 2013.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
ELMB miscellanea Dr Zhige (Gary) Zhang. ELMB miscellanea 1)Over voltage protection for analog input 2)Hardware resetting 3)Allocation for RICH2 4)Configuration.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Plans for the 2015 Run Vito Palladino Straw Working Group 2/2/2015.
15/12/10FV 1 Common DCS hardware. General ideas Centralized system: o Common computers. Detector dedicated computers (with detector participation) only.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
ATLAS MDT Power Supply DCS Anastasios Iliopoulos 15/08/2006.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Status of NA62 straw electronics Webs Covers Services Readout.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
ISEG HV power supplies for NA62 R. Fantechi 6/4/2011.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
André Augustinus 16 September 2002 Muon tracker URD summary or, what we understand from the URD.
ATLAS DCS ELMB PRR, CERN, March 2002Fernando Varela ELMB Networks CAN/CANopen Interoperability of the ELMB Usage of the ELMB in ATLAS ELMB Networks Full.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
Straw electronics status  Signal generation and formation in straw  Webs + Cover  Backend  TTC  Services + DCS  New engineer on VIA program Georgios.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
S. K. PalDCS WORKSHOP 17 JUN 2002 FRONT VIEW PMD Layout and Design Two planes: Veto + PreShower Gas detector with hexagonal cells Cell cross section: 0.22.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
22/03/11FV 1 NA62 DCS CAN bus lines. Short reminder General properties of CAN bus o Up to 64 nodes on one bus o Different devices need different buses.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
D. EliaALICE week / DCS workshop - Sept 20, SPD Power Supply System DCS status Domenico Elia INFN Bari.
10/09/10FV 1 News and observations from Brussels' meeting.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
09/09/10FV 1 NA62 common crate project. Crates survey result VF2 09/09/10 VME High populated TELL1 High populated TELL1 (Spare) Low populated TELL1 Low.
TOF Low Voltage and High Voltage Systems Vahe Ghazikhanian UCLA Department of Physics and Astronomy V. Ghazikhanian July 21, 2005.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
LKr status R. Fantechi.
Pierluigi Paolucci - I.N.F.N. Naples
The IFR Online Detector Control at the BaBar experiment at SLAC
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
RPC HV-LV project Introduction System requirements and description
RPC HV-LV project Introduction System requirements and description
Presentation transcript:

NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas gain monitoring/control Gas system distribution?

NA62

NA62 straw tracker Tracker consists of – 4 chambers, each chamber consists of – 4 views, each view consists of – 30 covers (basic element for readout, services, etc), each serves – 16 straws In total ~7600 straws (~480 per view) In DCS and readout we also work with ½ view unit – ½ view can be ‘real’ 30/2=15 covers (mainly for readout) – Or 14/16 covers (mainly for power and gas distribution) Power requirements LV – Basic unit is cover, 5-8V/1A (+ safety 0.2A=1.2A) – Basic distribution unit is ½ view which requires 16*1.2A= ~20A minimum – Patch panel receiving bulk power supply line is serving 16 covers (only 1 PP type used also for 14 covers) HV – Basic unit is cover, 2kV – Basic distribution unit is ½ view which requires 2kV/2(4)mA – Patch panel receiving bulk power supply line is serving 16 covers (only 1 PP type used also for 14 covers)

NA62 straw tracker To be controlled/monitored HV system – Bulk PS – HV patch panel LV system – Bulk PS – LV patch panel VME crates housing readout modules Thermo-sensors – Part of LV patch panel Gas system – not in this talk Gas gain control/monitoring

Bulk power supply Wiener MPOD – Each chamber has 1 MPOD crate equipped with 1HV and 4/8 LV modules – New system extensively tested in PH/ESE – HW exceptional performance – SW numerous crashes – Continue collaboration with Wiener CAEN – Currently no suitable system – Offered new crate compatible with current LV+HV modules – Should arrive to CERN for evaluation in Feb/March If none proves working close to end 2012 – Combination of current reliable supplies – LV Wiener – HV CAEN For test beam and technical runs we use available PS

LV patch panel Purpose – To distribute and control (on/off) LV power supply for 16 covers (1/2 view) – To monitor 1.2, 2.5, 3.3 and incoming voltages for every cover – To measure current for every cover – To measure temperature on every cover (single ADC channel with current source for PT1000) – To measure temperature on few places on the detector (double ADC channel with pt100 as used other places in NA62) ELMB based 2pcs/view; 8pcs/chamber served by 1 CANBUS link Design finished; layout proceeding Production starts in January 2012; available in March Would like to test it in ‘dry’ technical run in summer

HV patch panel Purpose – To distribute and control (on/off) HV power distribution for 16 covers (1/2 view) ELMB based – ELMB’s serial link used to control EPLD with triplicated logic to control HV relays – Need to check HV relays in magnetic field 1 PP serving 16 covers (1/2 view) Share CANBUS link with LV PP Design should start in January Available in April Would like to test/participate in ‘dry’ technical run

VME crates We have 1pc of 9U VME crate per chamber (4 total) and 1pc 6U TTC crate Need to control and monitor standard functions – On/off – Power – Temperature – Fans? – System reset Share CANBUS link with LV and HV PPs? TEL62 crate?

Gas gain monitoring (control?) Chamber 1 equipped with small vacuumed chamber for 4 pcs short (30 cm?) straws Fe55 (other source?) Each straw equipped with preamp, shaper, peak- sensing ADC Gas gain monitored (or controlled through HV) with multichannel analyser Results stored in DCS Time scale not really decided – End 2012 or beginning 2013

Requirements All measurement values (currents, voltages, temperatures, gas gain, humidity, etc) stored with reasonable interval ~1min ? (even more?) – Can be compressed/zero-suppressed Possibility to define ‘region of interest’ with much higher speed for tuning voltages, etc. – Usually ½ view – Update ~1s basic view for shift operator is chamber (1 out of 4) – Zooming to view – Up to single cover Out of limits (current, voltage, temperature, gas gain) marked in red and giving warning (?) to the shift staff