A Guide to Time & Material Projects Beginner
Agenda Overview – intended use Set-up Processing – invoice vs. progress billing Reporting – report generator codes, Detailed Cost Ledger
Construction Management System Profile
Job Profile
Cost Types
Unit of Measure – used for charging weekly or monthly amounts for project managers Non-recoverable – any items or types that you will use to track costs, but cannot charge back to the customer Cost Items – mark-up not used as often as types, but can indicate that same % charged on all types in that item
Labor
Equipment
Prepare Billings Edit/Cancel Billings Add Lines
Edit/Cancel Billings
Add Lines
Print Billing Report
Detail vs. Summary Cost & Billings vs. Billings Only Show/Suppress Labo(u)r cost Show Mark-up as % or $
Prepare Invoices You must fill in the Sales Category or it will not create an invoice H/B – S/Y/N Style – D/S
Edit Billing Flag Used to switch a line from Never Bill it to Bill it & vice versa
Flag Unbilled Job Postings Used to mark a posted item as having been billed on an invoice Normally used when one chooses to “Add Lines” in Edit/Cancel Billings to bill early for an item that is posted at a later date Indicate on which invoice this was billed so reports are correct
Reports Billing History Report Detailed Cost Ledger – show Construction Management Billing information Report Generator – codes DCMBM, DCMDT, DCMBW