Review process 2008 Katarina Mareckova, CEIP - Centre on Emission Inventories and Projections TFEIP Tallinn, 27 May 2008.

Slides:



Advertisements
Similar presentations
TFEIP/EIONET meeting, May 2009, Vienna stage 3 centralised review, Country feedback, France perspective Chang Jean-Pierre, Gueguen Céline.
Advertisements

Katarina Mareckova, Robert Wankmueller, Michael Gager TFEIP 2 May 2011, Stockholm Review of emission data submitted under CLRTAP and NECD Reporting of.
Katarina Mareckova, Robert Wankmueller 14 May 2013, Istanbul Revision of Reporting Guidelines and its Annexes.
Reporting of Abatement Plans 7 th EIONET Meeting 19 March 2002 Juergen Schneider.
1 Emission data needs for international reporting and assessments Joint UNECE and EIONET workshop on emission inventories and projections 6-8 May 2002,
Emission of pollutants into the atmosphere Emission of pollutants into the atmosphere  Katarina Mareckova, EMEP Centre on Emission Inventories and Projections.
1 Introduction, reporting requirements, workshop objectives Workshop on greenhouse gas and ammonia emission inventories and projections from agriculture.
Climate Change Committee WG1 QA/QC procedures and – programme for the EC inventory process André Jol, EEA 2 September 2004.
Emission of pollutants into the atmosphere Emission of pollutants into the atmosphere  Katarina Mareckova ETC ACM, Umveltbundesamt 24 Sept 2012, Chisinau.
Review process 2010 Katarina Mareckova, Robert Wankmueller CEIP - Centre on Emission Inventories and Projections TFEIP Larnaca,10 May 2010.
EXPERT GROUP ON AMMONIA ABATEMENT: Expectations of WGSR Richard Ballaman, Chairman Working Group on Strategies and Review Seventh meeting April 2006,
Katarina Mareckova, Robert Wankmueller, Elisabeth Kampel, Michael Gager and Stephan Poupa TFEIP, ETC ACM 14 May 2012, Bern Review of Emission Data and.
Stage 3 Review: TFEIP/ETC-ACC Karin Kindbom, Martin Adams & Justin Goodwin.
Reporting of 2007 EIONET air emissions priority data flows, summary of country performance Reporting of 2007 EIONET air emissions priority data flows,
Review Work Plan for 2008 Karin Kindbom (IVL) and Martin Adams (EEA) Co-chairs of the Expert Panel on Review 8 th Joint TFEIP/EIONET meeting October.
1 Planning of the Stage 3 In-depth Review 2008 Joint TFEIP/EIONET air emissions meeting Tallinn, May 2008 Martin Adams Expert Panel on Review European.
An Update on Activities Under the Convention SB Meeting Sept 2010 EB Meeting Dec 2010 WGSR MeetingApril 2011 Chris Dore.
Katarina Mareckova, Robert Wankmueller, Marion Pinterits TFEIP, ETC ACM 14 May 2013, Istanbul Status of emission reporting Gridded Emissions and LPS.
Project on translation of EMEP/EEA Emission Inventory Guidebook and activities of EECCA Coordinating Group Olga Yusim Russia TFEIP May 2, 2011, Stockholm,
1 EMEP/CORINAIR Atmospheric Emission Inventory Guidebook Proposal to restructure and update Aphrodite Mourelatou (EEA), Eduard Dame (EC), Kristin Rypdal.
Quality assurance / Quality control system for the Greek GHG emissions inventory Yannis Sarafidis, Elena Georgopoulou UNFCCC Workshop on National Systems.
Sonja Vidič EMEP SB Chairperson Joint TFEIP/EIONET Meeting and Workshop May, Bern, Switzerland.
Draft Format for an Inventory Report to LRTAP. Why? One important conclusion from the review activities in 2003 and 2004 is that it is difficult to make.
8th meeting of the TFEIP’s projections expert panel, 15th May 2012 Bern, Switzerland. Emissions projections reported under the LRTAP convention and EEA.
Review of the Gothenburg Protocol: WGSR Conclusions Review of the Gothenburg Protocol: WGSR Conclusions 8th Joint TFEIP/EIONET Meeting Dublin, October.
GHG inventory submissions and review process under the UNFCCC 8 th Joint UNECE TFEIP & EIONET Meeting Astrid Olsson Reporting, Data and Analysis Programme.
Reporting and use of air pollutant emission data under the ECE CONVENTION ON LONG-RANGE TRANBOUNDARY AIR POLLUTION Krzysztof Olendrzynski ECE/Air Secretariat.
Katarina Mareckova, Robert Wankmueller, Marion Pinterits, Melanie Tista CEIP, ETC ACM TFEIP, 11 May 2015, Milan Status of emission reporting Review of.
Upcoming changes to the EMEP grid Katarina Mareckova, Robert Wankmueller TFEIP Workshop 4 May 2011, Stockholm.
The Swedish air emission inventory system Karin Kindbom IVL Swedish Environmental Research Institute Russian-Swedish bilateral cooperation project: “Development.
Task Force on Emission Inventories and Projections Revision of LRTAP Emission Reporting Guidelines.
The Swedish air emission inventory system Karin Kindbom IVL Swedish Environmental Research Institute Russian-Swedish bilateral cooperation project: “Development.
CEIP the new EMEP centre Katarina Mareckova, Robert Wankmueller CEIP - Centre on Emission Inventories and Projections TFEIP/EIONET Tallinn, May 2008.
UNITED NATIONS ECONOMIC COMMISSION FOR EUROPE Keith Bull UNECE secretariat Keith Bull UNECE secretariat CONVENTION ON LONG-RANGE TRANSBOUNDARY AIR POLLUTION.
Information update: EB 26 decisions (December 2008) on emissions Review/revision of the Protocols Information update: EB 26 decisions (December 2008) on.
The Convention on Long-range Transboundary Air Pollution: Emission reporting obligations and outputs Brinda Wachs Secretary, Task Force on Emission Inventories.
European Union emission inventory report 1990–2011 under the UNECE Convention on Long-range Transboundary Air Pollution (LRTAP) EU LRTAP inventory team.
Naturvårdsverket | Swedish Environmental Protection Agency 1 The National Inventory System: An Overview of Sweden’s Informative Inventory Report (IIR)
Norwegian Meteorological Institute met.no 7 th Joint UNECE Task Force & EIONET WS on Emission Inventories and Projections, Thessaloniki 31 Oct – 2 Nov.
UNITED NATIONS ECONOMIC COMMISSION FOR EUROPE EMISSION DATA REPORTING UNDER LRTAP Task Force on Emission Inventories and Projections: Oct. 2004,
UNECE Reporting Guidelines Approval – impact on future reporting Katarina Mareckova, 11 May 2009, Vienna TFEIP/EIONET meeting.
Type the subject in footer (View|Header and Footer) 1 28/01/2016 EU CLRTAP Emissions Inventory Compilation 2015 TFEIP Meeting, 11/12 May 2015, Milano ETC/ACM.
E-PRTR data review May 2010, TFEIP/EIONET meeting, Larnaca, Cyprus Katarina Mareckova, Stephan Poupa, Nicole Mandl, Katrin Seuss, ETC ACC (Umweltbundesamt,
European Topic Centre Air and Climate Change (ETC/ACC) Priority EIONET data flows and EEA reference centre Manfred Ritter 10 May 2001.
Assessment of the CLRTAP Stage 1,2 & 3 Reviews Dr Chris Dore 11/05/2015.
1 Emission data needs for assessments and international reporting Joint UNECE and EIONET workshop on emission inventories and projections 9-11 May 2001,
Review of national submissions 2006 Stage II Elisabeth Rigler, Michael Gager, Bernd Gugele, Elisabeth Kampel, Katarina Mareckova ETC-ACC (UBA-V) Thessaloniki,
Gap-filling of the EU-27 CLRTAP inventory Sabine Göttlicher, Katarina Mareckova and Michael Gager ETC/ACC (Umweltbundesamt, Austria) Martin Adams European.
Emep Co-operative programme for monitoring and evaluation of long-range transmissions of air pollutants in Europe Convention on Long-range Transboundary.
1 EIONET Reporting and EEA Priority Dataflows Keimpe Wieringa EEA European Topic Centre on Air and Climate Change 31 October th Joint TFEIP & EIONET.
Gap filling process for the EC CLRTAP inventory B.Gugele, K.Mareckova, ETC-ACC TFEIP EIONET workshop, Vienna, 11 May 2009.
EEA priority data flow review of national submissions 2007 preliminary results EEA priority data flow review of national submissions 2007 preliminary results.
How official national inventory data is used as input data for EMEP models Katarina Mareckova, Robert Wankmueller CEIP - Centre on Emission Inventories.
STREAMLINING CLIMATE CHANGE AND AIR POLLUTION REPORTING REQUIREMENTS TFEIP – Dublin 23 – 24 October2007.
Key activities and results 2016 workplan 2017
Recommendations from the Stage 3 Trial Review
Review of CLRTAP and NECD inventories 2016
Review process in 2009 Status of reporting under NECD (2008) and CLRTAP (2009) Katarina Mareckova, Robert Wankmueller, Michael Gager TEFIP / EIONET.
Experiences from the 2006 Stage 3 trial centralised review
Jessica Sully, Secretariat
Gap-filling of the EU-27 CLRTAP inventory Sabine Göttlicher, Katarina Mareckova and Michael Gager ETC/ACC (Umweltbundesamt, Austria) Martin Adams.
Mandate & Outputs expected for 2004
Services to support the update of the EMEP EEA Emission Inventory Guidebook, in particular on methodologies for black carbon emissions.
Outline of the EU greenhouse gas emission trend report
TFEIP – 11th meeting of the Projection Expert Panel
Sweden’s Experience from the Stage 3 in-Depth Review
Projections expert panel agenda
2008 Stage 3 centralised review– lead reviewer perspective
Revised emission reporting Guidelines – Projection issues
Presentation transcript:

Review process 2008 Katarina Mareckova, CEIP - Centre on Emission Inventories and Projections TFEIP Tallinn, 27 May 2008

Main objective of review process The technical review of national inventories will check and assess Parties' data submissions with a view to improve the quality of emission data and associated information reported to the Convention. The review also seeks to achieve a common approach to prioritizing and monitoring inventory improvements under the Convention with those of other organizations with similar interests such as the United Nations Framework Convention on Climate Change (UNFCCC) and the European Union National Emission Ceilings (NEC) Directive. The review of data reported under CLRTAP is performed jointly with those reported under the amended National Emissions Ceilings Directive (2001/81/EC) and the process is supported by the European Environment Agency (EEA). National Emissions Ceilings DirectiveEEA

Technical Review Process To standardize review process, TFEIP elaborated review guidelines Methods and procedures for the technical review of air pollutant emission inventories reported under the Convention and its protocols EB.AIR/GE.1/2007/16. EB.AIR/GE.1/2007/16 The three stages of the annual technical review, covering quantitative and qualitative aspects of data, are:  Stage 1: An initial check of submissions for timeliness and completeness;  Stage 2: A synthesis and assessment of all national submissions with respect to consistency and comparability of data with recommendations for data quality improvement;  Stage 3: In-depth reviews of selected inventories, by pollutant, country or sector, as in the work plan agreed by the Executive Body At each stage, Parties will have the opportunity to clarify issues or provide additional information. Results of the review will be made publicly available

Stage 1 Responsibility with CEIP Automated test of submitted inventories (NFR tables) checking:  timeliness,  completeness, and  formats Results provided in country Status reports (pdf) to every Party by 10 th March Summary results presented at TFEIP meeting in May

Stage 2 More detailed checks of comparability and consistency, performed jointly with EEA  trends, KCA, indicators  recalculations,  comparison of NECD, CLRTAP and UNFCCC submissions Data (inventories as xml files) from UNFCCC are needed to cover more countries than EU27 and work efficiently Annual country specific Synthesis & Assessment reports are planed for 31 May. Format – excel file. Countries will have 4 weeks to provide comments Summary results of review Stage 1 and 2 will be presented in Technical Review Report (SB meeting Sept 2008).

Stage 3 (NEW) Centralized review of quantitative and qualitative information of selected inventories (in 2008 planed 5) Sept-Nov 2008 Joint responsibility (set up in review guidelines Annex III)  EMEP SB set up (legal) frame for the process (and approve the summary reports)  Parties; nominate and support expert reviewers and volunteer for review  UNECE secretariat ; communicate with the Parties and with CEIP maintain roster of experts  TFEIP panel on Review; develop relevant documents Review Guidelines Guidance for reviewers, Templates,…  CEIP technical support of review process  EEA volunteered to provide facilities and technical support  Expert review teams (ERT), review the inventories and compile review reports (within 6 weeks after the review) Country Review reports will be posted on the web (Dec 2009?) and summary results reported to EMEP SB (Sept 2009?).

Status of reporting & review 2008 (Stage 1 and 2) Katarina Mareckova, Robert Wankmueller CEIP - Centre on Emission Inventories and Projections TFEIP Tallinn, 27 May 2008

Reporting requirements CLRTAP  Parties are requested to send data to the CEIP and send Notification form to the secretariat. Parties may also use CDR. The submission should contain emissions and data on: SOx, NOx, NMVOCs, NH 3, CO, HMs, POPs and PMs  The deadline for submission of inventories 15 February, (inventory report (IIR) 6 weeks after the inventory)  Gridded data (for the years 1990, 1995, 2000 and if not already reported), and  LPS data (reported on a 5-yearly basis) were due 1 March NECD  The deadline for submission of inventories SOx, NOx, NMVOCs, NH 3, (2005 and 2006) and projections 2010 for EU MS was 31 Dec 2007 All submissions should be reported using the Nomenclature for Reporting (NFR) formats in accordance with the EMEP 2002 Reporting Guidelines

Timeliness - CLRTAP inventories in Parties submitted inventories, 30 inventories submitted on time (28 inventories in 2007)

Completeness - CLRTAP 2008 as of 15 May 51 Parties to the Convention, 40 Parties signed at least one protocol  35 Parties + Georgia, Malta, and Poland submitted inventories  34 Parties notified secretariat of their data submission to CEIP  Completeness per pollutant: Main pollutants-38; Cd, Hg, PB-34, additional HM 2 -28, PM s - 31, POP s – 31 Parties  13 Inventories resubmitted 4 Parties no submissions in 2008: Luxembourg, Island, Lichtenstein, Russian Federation and EC Not Parties to the Protocols; Albania, Armenia, Azerbaijan, Bosnia & Herzegovina, Kazakhstan, Kyrgyzstan, Montenegro, and Turkey, are invited to submit inventories

Completeness – example SO x, NO x maps (Time Series from 1980 – 2006)

Completeness – example PM 2.5, PM 10 maps (Time Series from 2000 – 2006)

Completeness cont. CLRTAP IIR sent by 24 Parties 17 Parties sent projections 2010, only 12 Parties also for year 2020Consistency 37 inventories provided as NFR tables, 5 in other format Completeness per protocol (Included only Parties to the particular protocol) –15 March

Consistency; Trends - CLRTAP

Inventory comparisons CLRTAP-NECD (CLRTAP = 100%) Plus value indicates that CLRTAP is higher Minus value indicates that NECD is higher

Inventory comparisons CLRTAP-UNFCCC (CLRTAP = 100%) Plus value indicates that CLRTAP is higher Minus value indicates that UNFCCC is higher

Gridded data – differences in distribution: example CO [Mg] the same national totals submitted in 2008 distributed with base grid 2007 and base grid Parties provided new gridded data, 6 Parties new LPS data base grid 2008 was calculated with new (2008) submitted gridded and LPS data

Timeliness – NECD (from 27 due) inventories submitted on time (16 from 25 inventories in 2007)

Completeness & consistency NECD 2007 Deadline 31 Dec 2007  26 MS submitted data, 19 inventories on time  Luxembourg no data Completeness  Inventory - 24 MS (2005 and 2006), Greece and Poland only 2006 inventory  Projections – 24 MS (not reported by Luxembourg, Portugal, Hungary) Consistency  18 inventories in non consistent format (modified NFR, other excel tables..) Recalculations – minor

Summary / follow up Timeliness of reporting and completeness of reported inventories is improving Standard formats remain problem particularly for NECD submissions and years before 2000 IIR are getting more and more voluminous but less transparent, often no summary in English - explanatory information is difficult to find CRF tables (xml files) of non-EU MS posted on CDR would enable to include these Parties in IEF tests CEIP/ETCACC is working on automation of the review process to the extend possible, but Stage 1 and 2 review still remain resource demanding activity.  Highlite outliers without comments  Provide questions