Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008
IRP1 Review - Y. Muttoni TS-ICC Summary Study inputs and limitations Equipment in place UJ14 Study implantation new equipment UJ14 Equipment in place RZ54-USC55 Equipment in place UJ56 Study implantation new equipment By-pass USC55 Conclusions 1/24/20162
IRP1 Review - Y. Muttoni TS-ICC Equipment (compared to existing solution). Add energy extraction (DQR-DQS). Electrical feed box outside beam. Cold D1 magnet. Limit Implantation studied around Pt1 in UJ14 (UJ16 symmetrical). Implantation racks studied inside by-pass near USC55. Electrical feed box like DFBL used. New electrical link. New DQR (mechanical or semiconductor). Study inputs and limitations 1/24/20163
IRP1 Review - Y. Muttoni TS-ICC Geographical location 1/24/20164
IRP1 Review - Y. Muttoni TS-ICC Equipment in place UJ14 5
IRP1 Review - Y. Muttoni TS-ICC Equipment in place UJ14 UJ14 IP1 UJ13 Space reserved for transport 1/24/20166
IRP1 Review - Y. Muttoni TS-ICC Equipment in place UJ14 1 st floor UJ14 1 st floor IP1 UJ13 UTA 1/24/20167
IRP1 Review - Y. Muttoni TS-ICC New equipment in UJ14 8 Transport area
IRP1 Review - Y. Muttoni TS-ICC New equipment in UJ14 DFBL 2x13KA 6x600A 2x120A 1/24/20169
IRP1 Review - Y. Muttoni TS-ICC New equipment in UJ14 1 st floor 10
IRP1 Review - Y. Muttoni TS-ICC New equipment in UJ14 Electrical link Routing link should be studied more in detail Existing holes through shielding wall 1 st floor 11
IRP1 Review - Y. Muttoni TS-ICC New equipment in UJ14 1/24/201612
IRP1 Review - Y. Muttoni TS-ICC New equipment in UL14 D1 cold Cryogenic link Electrical link 13
IRP1 Review - Y. Muttoni TS-ICC New equipment in US15 D1 cold Cryogenic link Electrical link 1/24/201614
IRP1 Review - Y. Muttoni TS-ICC New equipment in US15 D1 cold Cryogenic link Electrical link 1/24/201615
IRP1 Review - Y. Muttoni TS-ICC Geographical location USC55 1/24/201616
IRP1 Review - Y. Muttoni TS-ICC Equipment in place RZ54-USC55 17
IRP1 Review - Y. Muttoni TS-ICC Equipment in place UJ56 18
IRP1 Review - Y. Muttoni TS-ICC New Equipment Point 5 New rack layout symmetrical for each side Routing link should be studied more in detail Transport area 19
IRP1 Review - Y. Muttoni TS-ICC New Equipment Point 5 USC55 By-Pass Cross section 20 Transport area
IRP1 Review - Y. Muttoni TS-ICC New Equipment Point 5 1/24/201621
IRP1 Review - Y. Muttoni TS-ICC Conclusions New electrical link: Routing link should be studied in detail at point 5. Distance between DFB and Inner triplet is may be too far at point 5? New rack layout New cable (Control, power) routing required. New cooling water pipe routing required. Audit of rack use required with all owners (optimize space?). New position of control access is necessary at point 1. New energy extraction Required for space constraints Checking metallic structure in point 1. Electrical feed box New design or using DFBL? Implantation equipment Radiation issue. 1/24/201622