Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.

Slides:



Advertisements
Similar presentations
Electrical wiring for piezo movers piezo power supply strain gauges readout temperature probes 1 Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical.
Advertisements

19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
A. Ballarino, 21/11/2014 Wrap up from WP6 A. Ballarino for the WP6 CERN, Geneva KEK, 21 st November th Hi-Lumi LHC Extended Steering Committee.
Cold Powering of the HL-LHC magnet system WP6 Motivation Work Package description Tasks Partners & resources Amalia Ballarino HL-LHC Design Study – 3 rd.
R&D Plan on Clearing Electrode using the KEKB LER Y. Suetsugu and H. Fukuma, KEKB M. Pivi and L. Wang, SLAC at KEK.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
Prospects of SC Quadrupole Production at IHEP-Protvino The 2nd Institutes Meeting on International Construction of the FAIR Accelerator Complex Protvino,
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
E. Todesco PROPOSAL OF APERTURE FOR THE INNER TRIPLET E. Todesco CERN, Geneva Switzerland With relevant inputs from colleagues F. Cerutti, S. Fartoukh,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
Cryogenic Experts Meeting (19 ~ ) Cooling scheme discussion for 300 Tm High Energy Beam Transfer line (HEBT) with large inclination MT/FAIR –
Magnetic Shielding Roy Preece. Issues Cooling channel initially designed without return yolks. Current North and South shielding walls designed to encapsulate.
David Nisbet – LIUWG 17 th July 2008 LIUWG – Options for Powering Phase I David Nisbet Summary of points from LIUWG 7 Existing topology Future topology.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
1st LTEX 22 June 2009D.LACARRERE1 Protection of UX85 EDMS No IP8 Current Status & Plans  UX85 Expt Area  RB84 (8-7 sector)  RB86 (8-1 sector)
R2E Mitigation Project P5 Relocation Options - Discussion R2E Mitigation Project CMS Relocation Options Towards An R2E Baseline 1 M. Brugger for the R2E.
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
AT-MEI-PE, RD, LIUWG 31-JUL R. Denz AT-MEI-PE LHC Luminosity Upgrade Protection of the Inner Triplet, D1, Correctors and Superconducting Links/Leads.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
12th HL-LHC Parameter and Layout Committee meeting.
March 22,  Overview of Asian Civil Design  Previous Case Study  Feature of Beam Tunnel  Tunnel Typical Cross Section  Beam Tunnel.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Karl Williams Mechanical Engineer AD/MS Fluids Group Absorber RAW Cooling Systems.
R2E Point 5 mini safe room cooling / ventilation A. L. Perrot, 30 th April 2013.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
R2E-LHC Iterations Layout & Rack Locations – Collection of drawings – Inspection & Pictures – Review of monitor locations Review of Radiation Levels: –
1 ILD inner region integration meeting M. Joré – Introduction ILD inner region integration meeting Welcome words Charge of the meeting The current concept.
R. Ostojic, IRP1 CD Review, 31 July 2008 LHC IR Upgrade Phase I Goals and Constraints 1.Upgrade goals and milestones 2.Upgrade of IR systems: main constraints.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Teleconf ACS – FREIA 28th March 2017
Considerations from machine protection and the ELQA teams
HL-LHC IT STRING and Series test of SC link
STRAW TRACKER SYSTEM CAD STATUS :
MERcury Intense Experiment Experiment Layout
Update of MVD services and requests
Equipment simplified model SMR UR safety
The HL-LHC Circuits: Global View and Open Questions
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
News from Integration WG
cooling and supports of the forward endcap EMC
M. Alcaide Leon, Paolo Fessia
M. Alcaide Leon, Paolo Fessia
Arc magnet designs Attilio Milanese 13 Oct. 2016
Y. Muttoni - J.P. Corso TS Workshop Archamps
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
Test box for ProtoDUNE SP – Integration Test
Collimator Control (SEUs & R2E Outlook)
PROPOSAL OF APERTURE FOR THE INNER TRIPLET
LS3 Study & Readiness Meetings
IR Beam Transport Status
Polarized 3He target installation
RE3/1 & RE4/1 Parameter Space Services
Presentation transcript:

Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008

IRP1 Review - Y. Muttoni TS-ICC Summary Study inputs and limitations Equipment in place UJ14 Study implantation new equipment UJ14 Equipment in place RZ54-USC55 Equipment in place UJ56 Study implantation new equipment By-pass USC55 Conclusions 1/24/20162

IRP1 Review - Y. Muttoni TS-ICC Equipment (compared to existing solution). Add energy extraction (DQR-DQS). Electrical feed box outside beam. Cold D1 magnet. Limit Implantation studied around Pt1 in UJ14 (UJ16 symmetrical). Implantation racks studied inside by-pass near USC55. Electrical feed box like DFBL used. New electrical link. New DQR (mechanical or semiconductor). Study inputs and limitations 1/24/20163

IRP1 Review - Y. Muttoni TS-ICC Geographical location 1/24/20164

IRP1 Review - Y. Muttoni TS-ICC Equipment in place UJ14 5

IRP1 Review - Y. Muttoni TS-ICC Equipment in place UJ14 UJ14 IP1 UJ13 Space reserved for transport 1/24/20166

IRP1 Review - Y. Muttoni TS-ICC Equipment in place UJ14 1 st floor UJ14 1 st floor IP1 UJ13 UTA 1/24/20167

IRP1 Review - Y. Muttoni TS-ICC New equipment in UJ14 8 Transport area

IRP1 Review - Y. Muttoni TS-ICC New equipment in UJ14 DFBL 2x13KA 6x600A 2x120A 1/24/20169

IRP1 Review - Y. Muttoni TS-ICC New equipment in UJ14 1 st floor 10

IRP1 Review - Y. Muttoni TS-ICC New equipment in UJ14 Electrical link Routing link should be studied more in detail Existing holes through shielding wall 1 st floor 11

IRP1 Review - Y. Muttoni TS-ICC New equipment in UJ14 1/24/201612

IRP1 Review - Y. Muttoni TS-ICC New equipment in UL14 D1 cold Cryogenic link Electrical link 13

IRP1 Review - Y. Muttoni TS-ICC New equipment in US15 D1 cold Cryogenic link Electrical link 1/24/201614

IRP1 Review - Y. Muttoni TS-ICC New equipment in US15 D1 cold Cryogenic link Electrical link 1/24/201615

IRP1 Review - Y. Muttoni TS-ICC Geographical location USC55 1/24/201616

IRP1 Review - Y. Muttoni TS-ICC Equipment in place RZ54-USC55 17

IRP1 Review - Y. Muttoni TS-ICC Equipment in place UJ56 18

IRP1 Review - Y. Muttoni TS-ICC New Equipment Point 5 New rack layout symmetrical for each side Routing link should be studied more in detail Transport area 19

IRP1 Review - Y. Muttoni TS-ICC New Equipment Point 5 USC55 By-Pass Cross section 20 Transport area

IRP1 Review - Y. Muttoni TS-ICC New Equipment Point 5 1/24/201621

IRP1 Review - Y. Muttoni TS-ICC Conclusions New electrical link: Routing link should be studied in detail at point 5. Distance between DFB and Inner triplet is may be too far at point 5? New rack layout New cable (Control, power) routing required. New cooling water pipe routing required. Audit of rack use required with all owners (optimize space?). New position of control access is necessary at point 1. New energy extraction Required for space constraints Checking metallic structure in point 1. Electrical feed box New design or using DFBL? Implantation equipment Radiation issue. 1/24/201622