A Traditional vs. Ecosystem Services Approach to Surface Water Management September 16, 2010 PRESENTED BY Carol Murdock, Clackamas County WES Mark Anderson,

Slides:



Advertisements
Similar presentations
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Advertisements

 Threats to Water Resources: Polluted Stormwater Water Resource Congress October 2014.
Nutrient Trading Framework in the Coosa Basin Alabama Water Resources Conference September 6, 2012 A Feasibility Study of Nutrient Trading in Support of.
Best Local Land Use Practices A Project of the Ohio Lake Erie Commission The Countryside Program, Levin College of Urban Affairs Kirby Date, AICP Coordinator.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Leah Johanson, Water Environment Services
Low Impact Development Overview  Alternative to end of pipe approach to SWM  Maintain hydrologic function of local ecosystem  Treat stormwater close.
Wake County Stormwater Workshop Guidance on the New Stormwater Ordinance and Design Manual August 29, 2006.
Federal Realty Investment Trust (FRIT) Eastgate Shopping Center Chapel Hill, NC September 9, 2008.
Watershed Forestry Initiative Ellen Kohler Attorney & Policy Specialist Funded in part by Michigan Department of Natural Resources and Environment, Urban.
Smarter Stormwater Management Kelly Schmitt Rose Stenglein An example of Low Impact Design.
1 Options for Estimating BMP Performance (Load Reductions)
Sustainable Water Infrastructure Ivy Anderson Andey Nunes.
Ground Water and Ecosystems Restoration Division Assessing the Effectiveness of Restoration Technologies Elise Striz and Joe Williams.
Bay Area IRWMP Public Workshop #1 July 23, OBJECTIVES I BAIRWMP-Goals and Objectives II. DWR Guidance- “Measures” III Process IV. Proposed.
Bernie Engel Purdue University. Low-Impact Development (LID) An approach to land development to mimic the pre-development site hydrology to: 1)Reduce.
Northwest hydraulic consultants 2NDNATURE Geosyntec Consultants September 11, 2007 Urban Upland / Groundwater Source Category Group (UGSCG) Overview Presentation.
Center for Watershed Protection USDA Forest Service, Northeastern Area, State and Private Forestry How to estimate future forest cover in a watershed.
How do Wetlands Factor into New Infiltration Policies?
Ohio Balanced Growth Program New Resources for Watershed Planning and Best Local Land Use Practices Kirby Date, AICP, Cleveland State University.
Introduction to PA Act 167 Stormwater Management Planning Little Juniata River Watershed April 21, 2005.
Integration Of Stormwater Master Plans with Watershed Plans The Link between Flooding and Development September 23, 2008 Bob Murdock, P.E., CFM.
Ohio Balanced Growth Program Best Local Land Use Practices Development Incentives Kirby Date, AICP, Cleveland State University.
Loudoun Watershed Watch “ Restoring Loudoun Streams” LCSA Water Forum Presented by: Darrell Schwalm Loudoun Watershed Watch Loudoun Wildlife Conservancy.
Compact for a Sustainable Ventura County A project of the Ventura County Civic Alliance and the Ventura Council of Governments.
Balancedgrowth.ohio.gov Ohio Balanced Growth Program Kirby Date, AICP, Cleveland State University Chris Riddle, Ohio Lake Erie Commission.
Agua Hedionda Watershed Management Plan Watershed Planning Group Meeting June 5, 2008 Carlsbad, CA.
Bras d’Or Lakes Land-Use Planning Standards: Options for Municipal Government Consideration Presented by: The Bras d’Or Stewardship Society.
Building a Legacy: Integrated Water Resource Management in Damascus, Oregon Oregon Water Conference May 25, 2011 WBG PDX GS
ODOT 2015 Geo-Environmental Conference
ESValue-SWF Valuing Ecosystem Services on Public Lands in Southwest Florida.
Municipal GIS Applications JOHN C. CHLARSON, P.E. UNIVERSITY OF TENNESSEE MUNICIPAL TECHNICAL ADVISORY SERVICE FURE.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Bernie Engel, Larry Theller, James Hunter Purdue University.
Hydrograph Modification Management in Contra Costa County Dan Cloak, P.E. Dan Cloak Environmental Consulting.
Low impact development strategies and techniques jennifer j. bitting, pe the low impact development center, inc. june 2008.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Urban Water Research Todd Rasmussen Associate Professor of Hydrology The University of Georgia, Athens and Pending Director, Urban Water Research Institute.
Best Local Land Use Practices A Project of the Ohio Lake Erie Commission The Countryside Program, Levin College of Urban Affairs Kirby Date, AICP Coordinator.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Chagrin River Watershed Partners, Inc. Chagrin River Balanced Growth Plan Amy Brennan (440) , Newbury Township.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
Stormwater and GIS Eastern Panhandle WV GIS User Group Meeting September 2, 2015 Jennifer Klages - Sebastian Donner -
AHSS Council September Initial Recovery Strategy Deliverable Due to PSP in early October Focused on documenting / describing our work to date Will.
Oregon Natural Treatment Systems for Wastewater Natural Treatment Systems – A Water Quality Match for Oregon’s Cities and Towns June, 2014 Oregon Department.
Christie Beeman and Jeff Haltiner Philip Williams & Associates Hydrograph Modification: An Introduction and.
Kitsap County Department of Public Works CRAB – November 04, 2015 Bioretention Stormwater BMP Benson Burleson Design Engineer
Riparian Buffers And Their Role In Coastal Georgia By Jackie Jackson & Bethany Jewell Water Resource Planners.
California Water Plan Update Advisory Committee Meeting January 20, 2005.
One Water LA is a collaborative approach to develop an integrated framework for managing the City’s watersheds, water resources, and water facilities in.
Highlights  Describe Our Missoula Growth Policy Project  Relationship to Rattlesnake Neighborhood Plan  Next Steps.
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
COMPREHENSIVE PLAN UPDATE MEETING 3 – NATURAL & CULTURAL RESOURCE ELEMENTS 1/09/2014.
Module 5: Solutions – Sustainable Urban Communities MPP 655: Policy Making for Sustainable Urban Communities 1MPP Module 5.
GIS M ETHODOLOGY Swearing Creek Watershed Restoration Plan 8/26/2015 Piedmont Triad Regional Council.
Chagrin River Watershed Partners, Inc. January 19, 2008
LOW-IMPACT DEVELOPMENT
L-THIA Online and LID Larry Theller
PENNSYLVANIA STORMWATER BEST MANAGEMENT PRACTICES MANUAL
Liana Prudencio and Sarah E. Null
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
Sacramento County Stormwater Quality Program
Anne Arundel County Maryland
Cedar Ridge Estates Application for Comprehensive Permit
Sacramento County Stormwater Quality Program
Presentation transcript:

A Traditional vs. Ecosystem Services Approach to Surface Water Management September 16, 2010 PRESENTED BY Carol Murdock, Clackamas County WES Mark Anderson, CH2M HILL WBG PDX GS kk

Introduction / Context Ecosystem Services Approach to Facilities Planning – City of Damascus, OR How are we defining Ecosystem Services? Could an ES services approach be cost effective in the long-term? Business Case Evaluation – cost/benefit analysis – Environmental benefit – regulatory compliance – Community – livability, healthy environment – Economic – lower long-term cost to ratepayers, economic growth WES - Intent of BCE – inform policy decisions; develop implementation mechanisms; provide information on long-term cost savings

Clackamas County, Oregon – Rock Creek basin Pilot Study Area Rock Creek Basin Graphics courtesy Wikimedia, Clackamas County Service District #1 Rock Creek Watershed Action Plan, Brown and Caldwell

Evergreen Forest Deciduous/Mixed Deciduous Forest Wetlands Riparian Forest/Streams Rock Creek basin has 4 major ecosystem types

Mapped Ecosystem Extent and Quality

Methods of managing urban ecosystems for stormwater treatment are not new Riparian Buffers Conservation areas Vegetated filter strips Overland flow systems (NTS design)

The key for basin planning is balancing land resources Ecosystems require land area but offer two benefits: – “Passive” benefits when land zoned for development is preserved. – “Active” benefits when ecosystem land manages runoff from development. When land area is treated as a “facility”, public support and decision-making are essential

. Active Benefits: RUSA meets TMDL limits for Roseburg wastewater discharge Similar ecosystem mix to Clackamas County Up to 70% slopes down to gentle slopes with a creek in incised valley bottom Minimal changes to existing ecosystem were required to provide adequate treatment DEQ-approved facility at 10% of the cost of built infrastructure

Prioritization of Stormwater Control Strategies to Meet Level of Service Goals PRIORITY STRATEGY 1. Use ecosystem services of protected areas PRIORITY STRATEGY 2. Reduce development footprint PRIORITY STRATEGY 3. Uplift PRIORITY STRATEGY 4. Maximize LID stormwater controls PRIORITY STRATEGY 5. Implement built infrastructure We propose an integrated planning approach…

Prioritization of Stormwater Control Strategies to Meet Level of Service Goals PRIORITY STRATEGY 1. Use ecosystem services of protected areas PRIORITY STRATEGY 2. Reduce development footprint PRIORITY STRATEGY 3. Uplift PRIORITY STRATEGY 4. Maximize LID stormwater controls PRIORITY STRATEGY 5. Implement built infrastructure LOS Met Combined 5 Strategies = Total Stormwater Management Solution …that meets Level of Service goals

A business case identifies credible strategies that compare to conventional runoff management PRIORITY STRATEGY 1. Use ecosystem services of protected areas PRIORITY STRATEGY 2. Reduce development footprint PRIORITY STRATEGY 3. Uplift PRIORITY STRATEGY 4. Maximize LID stormwater controls PRIORITY STRATEGY 5. Implement built infrastructure LOS Met Strategy 5. Business as Usual LOS Met

We use a mix of conventional models and new resource balance concepts Simple Method (runoff and pollutant load) TR-55 (peak flows) Clackamas County Pollutant Loadings Model A new land balance tool to manage ecosystem and development area flow and load trade-offs A new cost calculator that relates infrastructure, land, restoration, and ecosystem value to find efficient strategies

Pilot study area characteristics – 167 acres

Summary of preliminary results TSS (LOS = 90% volume to 70% removal) Runoff (LOS = 2x existing)

Stormwater function by ecosystem type 100-year flood volume (gallons) Annual Runoff Volume (gallons)100-year Peak flow (cfs)TSS load (lbs) Existing condition/LOS83,343164, Zoned development (1 acre)117,251549, Difference - amount that needs to be managed by stormwater system33,908384, Acres required to manage difference shown above Evergreen Forest AN/A Evergreen Forest BN/A Evergreen Forest CN/A Deciduous Forest AN/A Deciduous Forest BN/A Deciduous Forest CN/A Riparian corridor A Riparian corridor B Riparian corridor C Wetlands A0.40.1<0.4N/A Wetlands B0.40.1<0.4N/A Non-native/non-builtN/A

Some early results About 3 acres of natural area will manage impacts from 1 acre of residential development, depending on zoning Uplift has little effect on treatment, but more important for volume – heavily dependent on assumptions Ecosystem areas can be valued monetarily to help drive market behavior. Assumptions about density and EDU buildout are highly sensitive

General site design considerations Pre- and post-developed time of concentration Typical slope Limits of treatment area (due to topography, etc.) Expected treatment infiltration loss (derived from ClackCo model) Expected pollutant capture rate Treatment area characteristics and effectiveness

Potential avenues for research and development Treatment effectiveness in varied natural conditions Infrastructure costs Uplift costs

Planned next steps Develop alternatives for BCE and policy selection Refine and implement planning framework for Damascus Engage with stakeholders to think about resource economics in a new way

Acknowledgements City of Damascus, Oregon Oregon Department of Environmental Quality

Questions or Comments? WBG PDX GS kk