Charles C. Baker Deputy US ITER Planning Officer presented at the Fusion Power Associates Annual Meeting and Symposium Washington, DC 19-21 November, 2003.

Slides:



Advertisements
Similar presentations
1E. TsitronePWI TF meeting 13-15/11/2006 Euratom ITER divertor status Annual ITER divertor meeting (4-6 october 2006, St Petersbourg) Memorandum of undestanding.
Advertisements

ITER Organization, Cadarache, France
Fusion Power Associates Meeting, 5 December 2012 Slide 1/16 ITER Achieve 500 MW of fusion power. Demonstrate the scientific and technological feasibility.
Report from US ITER Fusion Power Associates December 15, 2011 Ned Sauthoff Project Manager.
Y. Kamada JAEA TCM-8 meeting, 2010, April 14 ENEA Frascati, Italy 1 JT-60SA Plasma Regimes and Research Plan.
1 Summary Slides on FNST Top-level Technical Issues and on FNSF objectives, requirements and R&D Presented at FNST Meeting, UCLA August 18-20, 2009 Mohamed.
Office of Central Integration and Engineering
ELECTRON CYCLOTRON SYSTEM FOR KSTAR US-Korea Workshop Opportunities for Expanded Fusion Science and Technology Collaborations with the KSTAR Project Presented.
EPICS Collaboration Meeting – Aix-en-Provence June 2010 Page 1 ITER welcomes EPICS WD Klotz ITER int. Organiztion That’s me.
Physics of fusion power Lecture 14: Anomalous transport / ITER.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
Japan considerations on design and qualification of PFC's for near term machines (ITER) Satoshi Suzuki 1, Satoshi Konishi 2 1 Japan Atomic Energy Agency.
The main function of the divertor is minimizing the helium and impurity content in the plasma as well as exhausting part of the plasma thermal power. The.
Energy loss for grassy ELMs and effects of plasma rotation on the ELM characteristics in JT-60U N. Oyama 1), Y. Sakamoto 1), M. Takechi 1), A. Isayama.
Activities and Strategy in Japan on Fusion Technology for DEMO Hiroshi Horiike Osaka University Graduate School of Engineering Fusion Power Associates.
Progress Towards RF Steady State Systems For Fusion Devices
ITER The past, present and future 1985 to 2007 Garry McCracken.
Broader Approach Activities toward Fusion DEMO Reactors IT/E-2 IAEA 21 st Fusion Energy Conference (Chengdu 17 th October, 2006 ) Shinzaburo Matsuda Japan.
1 The Broader Approach Projects P. Barabaschi F4E Garching – 14 Apr 2011.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Y. Sakamoto JAEA Japan-US Workshop on Fusion Power Plants and Related Technologies with participations from China and Korea February 26-28, 2013 at Kyoto.
Recent JET Experiments and Science Issues Jim Strachan PPPL Students seminar Feb. 14, 2005 JET is presently world’s largest tokamak, being ½ linear dimension.
M.E. Fenstermacher - Summary of Progress and Outlook for Work Plan in PEP ITPA WG on RMP ELM Control 4/23/09 11:15 PM 1 PEP ITPA Working Group on RMP ELM.
Kaschuck Yu.A., Krasilnikov A.V., Prosvirin D.V., Tsutskikh A.Yu. SRC RF TRINITI, Troitsk, Russia Status of the divertor neutron flux monitor design and.
Kaname Ikeda, October Status of the ITER Project Status of the ITER Project Kaname Ikeda ITER Nominee Director-General October 2006.
ILO Meeting #26 Ongoing and forthcoming Procurement activities 29 th September San Sebastian F4E Market Intelligence group - ILO Meeting #26 – 29th.
US ITER UFA Meeting APS-DPP Savannah, GA Ned Sauthoff (presented by Dale Meade) November 15, 2004 US In-kind Contributions and Starting Burning Plasma.
Exploring Magnetically Confined Burning Plasmas in the Laboratory AAAS Annual Meeting Ned Sauthoff February 18, 2005 “Yearn to burn” “Burn to learn” Marshall.
Overview of the KSTAR commissioning M. Kwon 3 June, 2008.
HTPD ITER Satellite Meeting 1April 22, 2004 Proposed US Role in ITER Diagnostics David Johnson, PPPL.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 16th TOFE Madison, Sept , EUROPEAN TECHNOLOGICAL EFFORT IN PREPARATION OF ITER CONSTRUCTION ROBERTO.
Discussions and Summary for Session 1 ‘Transport and Confinement in Burning Plasmas’ Yukitoshi MIURA JAERI Naka IEA Large Tokamak Workshop (W60) Burning.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Divertor Design Considerations for CFETR
1 1 by Dr. John Parmentola Senior Vice President Energy and Advanced Concepts Presented at the American Security Project Fusion Event June 5, 2012 The.
1/9 Session III-B Special Liquid Lithium Technology Session Summary C. H. Skinner, session chair Princeton Plasma Physics Laboratory 2 nd International.
Norbert Holtkamp, October The Engineering Challenges of ITER The Engineering Challenges of ITER Norbert Holtkamp PDDG Nominee October 16th, 2006.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
PPPL International Collaboration Activities J. R. Wilson Head Off-site Research Department Princeton Plasma Physics Laboratory 4th US-PRC Magnetic Fusion.
Programmatic issues to be studied in advance for the DEMO planning Date: February 2013 Place:Uji-campus, Kyoto Univ. Shinzaburo MATSUDA Kyoto Univ.
CHI Run Summary for March 10-12, 31 & April 9, 2008 Flux savings from inductive drive of a Transient CHI started plasma (XP817) R. Raman, B.A. Nelson,
Charles C. Baker Virtual Laboratory for Technology presented at the U.S. ITER Forum University of Maryland, College Park May 8, 2003 US ITER Technology.
Scope and Project Plan of IFMIF/EVEDA Presented by Masayoshi SUGIMOTO (IFMIF/EVEDA Project Team, Deputy Leader/ JAEA) IAEA’s Technical Meeting on Nuclear.
ITER Project Status Ned Sauthoff Project Manager U.S. ITER Project Office FESAC 7/27/04 “preparing for an efficient start of ITER construction”
Integrated Operation Scenarios ITPA Remaining duties ITPA CC meeting & IEA/ITPA JE planning meeting –12 – 14 (15) December 2011, Cadarache –Ide, Sips and.
US ITER Project Activities Ned Sauthoff, Project Manager U.S. ITER Project Office 16th ANS TOFE 9/16/04 Partnering on ITER for studies of burning plasma.
Measurements of plasma turbulence by laser scattering in the Wendelstein 7-AS stellarator Nils P. Basse 1,2, S. Zoletnik, M. Saffman, P. K. Michelsen and.
B WEYSSOW 2009 Coordinated research activities under European Fusion Development Agreement (addressing fuelling) Boris Weyssow EFDA-CSU Garching ITPA 2009.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
FIRE Engineering John A. Schmidt NSO PAC Meeting February 27, 2003.
NCSX NCSX CDR May 21-23, 2002 H.W. Kugel Slide 1 Conceptual Design for NCSX Auxiliary Systems Heating, Fueling,Wall Conditioning and Vacuum Systems.
ITER-China Project Huo YuPing PT Leader, ITER-China Chief scientist.
18th International Spherical Torus Workshop, Princeton, November 2015 Magnetic Configurations  Three comparative configurations:  Standard Divertor (+QF)
11 Introduction of ITER Port plug and Diagnostics Integration 17 April 2015 Damao Yao.
MAST Upgrade: Status and plans
PERSISTENT SURVEILLANCE FOR PIPELINE PROTECTION AND THREAT INTERDICTION Dust and the ITER Issue Cards Presented by Phil West with Charles Skinner Presented.
Status of Upgrading Project of Tokamak T-15 E. Azizov 1), P. Khvostenko 1), I. Anashkin 1), V. Belyakov 2), E. Bondarchuk 2), O. Filatov 2), V. Krylov.
Fusion: The Energy Source for the XXI Century Mohamed Abdou Distinguished Professor, Mechanical and Aerospace Engineering Department Director, Center for.
US Participation in the
OVERVIEW OF THE DIII–D PROGRAM AND CONSTRUCTION PLANS
Design and Fabrication of Versatile Experiment Spherical Torus (VEST)
Future R&D: beta-beam Mats Lindroos Mats Lindroos.
Status of Vertical Neutron Camera Integration
The Gas Dynamic Trap (GDT) Neutron Source
The Engineering Challenges of ITER Norbert Holtkamp PDDG Nominee October 16th, 2006 Norbert Holtkamp, October 2006.
Summary Slide (OV/1-1) PROGRESS OF ITER-INDIA ACTIVITIES FOR ITER DELIVERABLES-Challenges and mitigation measures What are the major developments? A functional.
Globus-M2 will be constructed by the end of 2015
EX/P7-12, R&D for reliable disruption mitigation in ITER, M
Stellarator Program Update: Status of NCSX & QPS
Presentation transcript:

Charles C. Baker Deputy US ITER Planning Officer presented at the Fusion Power Associates Annual Meeting and Symposium Washington, DC November, 2003 U.S. Technology Interests in ITER Principal Information Sources ITER Technology R&D, Fusion Engineering and Design, Vol.55, July Summary of the ITER Final Design Report, July 2001

Fig. 1 Cutaway of ITER R. Aymar/ Fusion Engineering and Design 55 (2001)

T. Mizoguchi/Fusion Engineering and Design 55 (2001) Fig. 1 Central solenoid model coil (CSMC) configuration (above) and fabricated modules (below) during assembly at JAERI, Naka (JA). Another TF insert coil is fabricated by Russia and tested at JAERI.

H. Tsuji et al. /Fusion Engineering and Design 55 (2001) Fig. 2 Fabrication flow of CS model coil and CS insert coil.

T. Mizoguchi/Fusion Engineering and Design 55 (2001) Fig. 10 Integrated inner divertor cassette (above left) at Sandia (US), integrated outer divertor cassette (below) at EFET (EU) and high heat flux testing of divertor target by ion beam (above right) at JAERI, Naka (JA).

T. Mizoguchi/Fusion Engineering and Design 55 (2001) Fig. 6 Demonstration of remote welding (US).

RF Technology Highlight: The JET-EP ICRF Antenna and the High Power Prototype (HPP)

ECH Highlight: 1.5 MW, 110 GHz Gyrotron Development

Plasma Fueling Highlights: 1. Massive Gas Puff for Disruption Mitigation - Mainline Tokamaks 2. Pellet injector in a Suitcase - Alternative Confinement Devices 3. Pellet fuelling - H-mode fuelling

ITER provides Unique Technical Challenges for Diagnostics Measurement requirements demand performance capability for present-day machines + alpha-particle measurement, + operation in radiation environment, presence of blankets, + reliability, calibration maintenance, + control data for machine protection. Significant engineering design issues. 2m high x 1.8m wide x 3.5m long Weight 66 tonne Side and bottom 130mm thick Front & port flange 200mm Equatorial port-plug concept Port-plug with penetrations for Thomson scattering, interferometry, etc. Designs by C. Walker (JCT)

Construction Schedule 7 year construction 1 year integrated commissioning ITER Legal Entity established about 2 years before award of construction license Long lead item calls for tender sent out and procurement started before license awarded Success-oriented schedule: First plasma in 2013