PAO 1 Telecon THEMIS Public Affairs Status Telecon.

Slides:



Advertisements
Similar presentations
7/30/04 Back To The Future Applying Thermal Control Experiences On Apollo Lunar Rover Project To Rovers For The Space Exploration.
Advertisements

Orbiting Carbon Observatory Preston Parker. Resources
DSCOVR Overview Mike Simpson and Doug Biesecker COPC November 4, 2014.
Solar-B FPP 1 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS The TRACE Model for Operations Ted Tarbell
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center Phase E Kickoff Meeting February 23, 2007.
Polar – THEMIS Collaboration Opportunities Spacecraft Locations post launch Magnetopause campaign? Conjugate studies with THEMIS Ground Stations C. T.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
JPL Autonomous Space Mission Simulation Flight Team Bob Hoffman Josh Ruggiero Adam Nikolic Dusty Terrill.
Modern Exploration Mars Pathfinder  “NASA’s Mars Pathfinder mission – the first spacecraft to land on Mars in more than 20 years and the first ever to.
STEREO Science Center SWG – Dec 2004 William Thompson NASA Goddard SFC Code Greenbelt, MD
STEREO Media Activities Rachel A. Weintraub NASA Public Affairs Officer / TV Producer Dec STEREO Working Group.
OSIRIS-REx Asteroid Sample Return (NASA New Frontiers Program)
Sept. 2008EFW INST+SOC PDR RBSP EFW GSE and SOC-GSE GSE and SOC-GSE (Science Operations Center In Support of INT) John Bonnell Will Rachelson Matt.
Promising data analytics technologies Tiffany Mathews.
National Aeronautics and Space Administration Goddard Space Flight Center MISSION READINESS REVIEW THEMIS Cynthia M. O’Carroll GSFC Public Affairs Office.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
Rachel Weintraub Public Affairs Officer & TV Producer NASA Goddard Space Flight Center More information:
June 2004 SIW-4 - IP in Space Implementation Guide 1 Handbook for Using IP Protocols for Space Missions James Rash - NASA/GSFC Keith Hogie, Ed Criscuolo,
A Office of Public Affairs Public Affairs Directors Conference New Year, New Opportunity for PAO November 17, 2004 Dean Acosta New Year, New Opportunity.
Aurora, Substorms, and THEMIS D. G. Sibeck NASA/GSFC THEMIS Project Scientist.
1 NUOPC National Unified Operational Prediction Capability 1 Review Committee for Operational Processing Centers National Unified Operational Prediction.
NMP EO-1 TECHNOLOGY WORKSHOP Section 2 Meeting Objectives.
1 Web Design Project -- Roles Team organization -- roles –Project manager Ann –Business Ed, Ann –Content Georgette, Phil, Doug –Technology Walt, Claudio,
SEAC4RS Education and Public Outreach Emily Schaller NSERC/NASA Dryden Aircraft Operations Facility
NASA CII GEO Guidelines and Database Bernie Bienstock May 21, 2013.
Work Programme Management Ad hoc Group Report Group Name: one M2M TP12 Source: Convenor WPM Joachim Koss, Gemalto M2M,
-1 - Outline 1.Science goals, mission name (bonus for acronym and logo!!) 2.Define telescope and instrument 3.Choose orbit 4.Calculate data volume, rate.
Outline The practice of public relations Types of public relations programs Public relations planning Public relations tools Effectiveness and excellence.
Polar Gateways 2008THEMIS Constellation Operations − Jan 2008 THEMIS Constellation Operations Dr. Manfred Bester University of California at Berkeley.
Invitations are mailed approx 4-6 weeks prior to launch All guest activities will be outlined Driving directions and map (from local areas) Transportation.
America will send a new generation of explorers to the moon aboard NASA’s Orion crew exploration vehicle. After that, on to MARS!!!
May 18, 2004Ron Allen, STScI Lunch Talk1 Space Interferometry Mission (SIM) Update - May 2004 Ron Allen SIM Mission Scientist Space Telescope Science Institute.
NASA/Air Force Cost Model presented by Keith Smith Science Applications International Corporation 2002 SCEA National Conference June
Academic Outreach Project Status Report and Project Approvals OHT Board of Stewards Atlanta--30Jun10.
TIM 1 UCB, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting Dr. John Wygant, UMN Dr. John Bonnell, UCB Peter Harvey, UCB.
Obtaining MISR Data and Information Nancy Ritchey Atmospheric Science Data Center March 20, 2006.
Data Standards Development August 29, Topics 1.Current Status 2.What was delivered for Build 2c 3.How was IPDA supported 4.What mission support.
2009 Civil Air Patrol Annual Conference. Today’s Program Updates from CAP/PA and NHQ/PA Updates from CAP/PA and NHQ/PA Open Forum Open Forum Please hold.
CCIC Component 2 Communication & Dissemination. The Team in Eindhoven Tieke VeuskensEindhoven –T: E :
LiteBIRD US Team Meeting 10/13/2015 Team Meeting at UCB SSL1 Intro to SSL.
Federal Geographic Data Committee Update Ivan DeLoatch NGAC Meeting August 26, 2009.
Educator Resources in Space Sciences Caitlin Nolby North Dakota Space Grant Consortium.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
CALIFORNIA HIGHWAY PATROL PUBLIC AFFAIRS OFFICERS.
ROCSAT-2 Current Status of ISUAL Project Jyh-Long Chern of NCKU Yukihiro Takahashi of Tohoku University Henry Heetderks of UCB February 28, 2002.
Academic Outreach Project Status Report and Project Approvals OHT Board of Stewards Cambridge--1Oct10.
GLAST Science Support CenterAugust 10, 2004 Users’ Committee Meeting The Project Data Management Plan David Band – GSSC.
SPDF Science Advisory Group - September 29-30, 2005 Page 12/24/2016 9:09:48 PM Services of the Space Physics Data Facility (SPDF) / Sun-Earth Connection.
MARSVILLE What does Mars look like? Could there be life on Mars?
TRIO-CINEMA 1 UCB, 2/08/2010 Mission Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
MEPAG Meeting February 27, 2013 web meeting David Des Marais, MEPAG Chair NOTE ADDED BY JPL WEBMASTER: This content has not been approved or adopted by,
September 2002 Brian Mathews - AbsoluteValue Systems Slide 1 doc.: IEEE /554r0 Submission Publicity Committee /.15 Brian Mathews, PC Chair.
STEREO Science Working Group Meeting Telecon No April 14.
Thursday January 31, 2013 (Classification of Igneous Rocks; Begin Lab – Igneous Rocks)
ISRO – NASA Space Science Co-operation S.Seetha Programme Director, Space Sciene Programme Office, ISRO HQ & Co-Chair-INMWG Meeting on 24 th Feb 2016 at.
Workshop on Science Associated with the Lunar Exploration Architecture - Earth Science Subcommittee Theme: A Lunar-Based Earth Observatory Science Observations.
Page No. 1 ISS_CM_019 (Rev 09/2011) Pre-decisional, For Internal Use Only Payload Safety Review Panel (PSRP) Process Updates/Status International Space.
Publicity for Scientists: Best Practices from the Universe of Astrophysics Prof. Lynn Cominsky Sonoma State University.
TRIO-CINEMA 1 UCB, 2/08/2010 FSW & Operations Winter Summary Seyoung Yoon KHU EE Team.
Mission Critical Design Review (MCDR) June 14-18, 2004
Alerts Powered By Smart911 Marketing Kickoff
SPACE Mission Badge 9/17/2018.
ISAS Solar Physics Yohkoh (1991- ) Hionotori ( )
TEMPO’s Commercially Hosted Payload Concept
NASA McMurdo Ground Station Typical Workload
Special Staff / Communication Presenter: Karen Roberts and Richard H
Scale of things : Big and Small
Tucson Unified School District
Giove and Galileo: Effects
EagleSat 2 – Mission and Development Overview
Presentation transcript:

PAO 1 Telecon THEMIS Public Affairs Status Telecon

PAO 2 Telecon AGENDA Milestone Schedule Web Content Comments from Last Meeting and More! ftp://apollo.ssl.berkeley.edu/pub/THEMIS/1%20Management/1.5%20PAO/ Updated Instrument Description w/photos ftp://apollo.ssl.berkeley.edu/pub/THEMIS/1%20Management/1.5%20PAO/Instruments/thm_PAO_Instruments.doc Generated Instrument Powerpoints w/CAD drawings ftp://apollo.ssl.berkeley.edu/pub/THEMIS/1%20Management/1.5%20PAO/Instruments/ Themis Themes Small spacecraft= Compressed electronics, Low Power, Compressed data Low Cost spacecraft= Simple, Keep complexity in Ground systems Coordination Adding UCB PAO Adding Canadian PAO Next Meeting AGENDA

PAO 3 Telecon MILESTONES Press Releases Ground Stations Coming On Line Science We’re Going to Do NASA_1 st : Five Spacecraft on a Single Launch Vehicle NASA_1 st : Synchronized Orbits Press Conferences AGU, L-30, L-14,L-1 : Agenda & Personnel selection Media Day

PAO 4 Telecon PRESS KIT Press Kit Outline 1.Mission Launching Later Than Planned 2.Spacecraft & Instruments 3.TBD