DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.

Slides:



Advertisements
Similar presentations
Status of PMD DCS. PMD Layout Unit Module Super Module Converter + Support Plate Total channels Preshower+Veto = 221,184 8 Supermodules in 2 planes 48.
Advertisements

Sezione di Bari September 16, 2002D. Elia - DCS workshop / ALICE week 1 SPD PS system and Controls Domenico Elia, INFN-Bari.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Power Supplies Monitoring and control.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University High Voltage Requirements Commercial Solutions Custom Solutions.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Susanne Kersten, Wuppertal University November 21/22, 2013.
1 Low Voltage Power Supplies for ALICE TB L.Jirden u Recall: u target devices & possible solutions u Outstanding actions.
MDT PS DCS for ATLAS Eleni Mountricha
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
L.Jirden1 Update on Power Supplies DCS WS L.Jirden u Wiener u Caen u Global Support Contracts.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
ALICE DCS Workshop 28/29 May 2001 Vito Manzari, INFN Bari SSD (Silicon Strip Detector) SDD (Silicon Drift Detector) SPD (Silicon Pixel Detector) Detector.
1 Low Voltage Power Supplies for ALICE ALICE week June 04 L.Jirden u Detector requirements u Target Devices u Procurement u Actions.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
High Voltage System outside Drawers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Christian Fayard,
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
A. Ranieri / RPC-CMS Pre-loaded profile Synchronization & Control Board (SCB) The RPC electronics will consist of the FE board plus the Synchronization.
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
1 Low Voltage Power Supplies for ALICE TB L.Jirden u Target devices (reminder) u Market Survey and Tender u Actions.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
1 H C A L S.Sergueev, NEC2001, Varna, September 2001 CMS HCAL Slow Control System for the CMS Hadron calorimeter S.Sergueev, FNAL/JINR CMS HCAL.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
André Augustinus 16 September 2002 Muon tracker URD summary or, what we understand from the URD.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
13-Mar-061 ACORDE DCS ACORDE GROUP CINVESTAV, ICN-UNAM, MICHOACAN. PUEBLA México.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
JBMCambridge Workshop 6th to 7th January DAQ-DCS Communication.
1 Radiation worries in the cavern L.Jirdén
S. K. PalDCS WORKSHOP 17 JUN 2002 FRONT VIEW PMD Layout and Design Two planes: Veto + PreShower Gas detector with hexagonal cells Cell cross section: 0.22.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
D. EliaALICE week / DCS workshop - Sept 20, SPD Power Supply System DCS status Domenico Elia INFN Bari.
André Augustinus 16 June 2003 DCS Workshop Detector DCS status Overview and news.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
V.Duk, INFN Perugia1 CHOD/NHOD status Viacheslav Duk, INFN Perugia Ferrara,
TPC Detector Control System
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
Presentation transcript:

DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski

17 June 2002DCS Workshop 2 PHOS Overview PHOS HV APD 5 PHOS Modules N2 purging Amps, FEE PHOS Volume LV FEE Cooling, warming 5 CPV Modules HV MWPC LV FEE GAS Mix. FEE T-mon

Serguei Sadovski 17 June 2002DCS Workshop 3 PHOS modules CAEN ? 1 crate Ethernet 5 channels UX PX High Voltage: Wiener ? crates CANbus, Profibus ? ?? channels UX PX LV power supply: HVLV APD biasPS Wiener PHOS APD PHOS FEE HV regulator 5x3584 channels

Serguei Sadovski 17 June 2002DCS Workshop 4 PHOS PHOS environ. Crate control: ? crates CANbus, Profibus? UX PX ? crates (VME) Crate(s) Environment: UX PX (VME) Crate(s) I/O Device T Equip. crate Env. Temp. Profibus?

Serguei Sadovski 17 June 2002DCS Workshop 5 PHOS module voltage  HV APD bias: V, 0.5 mA / 5 modules  LV Preamps: +12 V, 300 A / 5 modules -6 V, 75 A / 5 modules  LV FEE: +6 V, 1 kA / 5 modules -6 V, 250 A / 5 modules  LV LED Monitoring +5 V, 1 A / 5 modules

Serguei Sadovski 17 June 2002DCS Workshop 6 PHOS module status  High Voltage APD bias: CAEN SY1527 ???  High Voltage regulator: R & D up to the end of 2002  Low Voltage PS: Wiener  Temperature Module volume: Self made system (Sarov) FEE: Self made system (Sarov)  Crate control: Standard for LHC experiments

Serguei Sadovski 17 June 2002DCS Workshop 7 CPV modules CAEN 1 crate Ethernet 25 channels UX PX High Voltage: Wiener 3 crates CANbus, Profibus ? 30 channels UX PX LV power supply: HVLV MWPCPS Wiener CPV

Serguei Sadovski 17 June 2002DCS Workshop 8  Only temperatures of FEE & RO electronics are identified  I/O Device could be PLC CPV temperature I/O Device ? UX PX FE boards 15 Boards FEE temperature FE boards

Serguei Sadovski 17 June 2002DCS Workshop 9 CPV CPV environment Crate control: ? crates CANbus, Profibus? UX PX ? crates (VME) Crate(s) Environment: UX PX (VME) Crate(s) I/O Device T Equip. crate Env. Temp. Profibus?

Serguei Sadovski 17 June 2002DCS Workshop 10 CPV voltage  HV CPV: 2-3 kV, 10 mA / 5 modules  LV GASSIPLEX: +3.5 V, 300 A / 5 modules -3.5 V, 300 A / 5 modules  LV FEE: ??? V, ??? A / 5 modules

Serguei Sadovski 17 June 2002DCS Workshop 11 CPV status  High Voltage: CAEN SY1527  Low Voltage PS: Wiener  Front End Electronics Temperature  Crate control: Standard for LHC experiment  GAS: Standard for LHC experiment