CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.

Slides:



Advertisements
Similar presentations
Mats Lindroos Will we ever do a beta-beam design study beyond the present CERN-Frejus baseline? Mats Lindroos.
Advertisements

RAL 27 April 2006The beta-beam task, EURISOL1 Status of the beta-beam study Mats Lindroos on behalf of the EURISOL beta-beam task.
A.B. Balantekin #, J.H. de Jesus #, R. Lazauskas*, C. Volpe* # #University of Wisconsin, Madison, USA *IPN, Orsay (France) A Conserved Vector Current test.
NNN05, 8/4/05 1 A BASELINE BETA-BEAM Mats Lindroos AB Department, CERN on behalf of the Beta-beam Study Group
14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7.
Osaka, 25/07/04NuFACT’04 - Beta Beam R&DM. Benedikt 1 BETA-BEAM R&D in EUROPE Michael Benedikt AB Department, CERN on behalf of the Beta-Beam Study Group.
Alex C. MUELLER Physics with a multi-MW proton source, CERN, Geneva, May Additional Installations for a Nuclear Physics Facility Alex C. MUELLER.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
 M-MWATT EURISOL DS Approved EU design study for a next generation ISOL facility and a beta- beam facility Mats Lindroos on behalf of The EURISOL DS.
Status of EURISOL Yorick BLUMENFELD We acknowledge the financial support of the European Community under the FP6 “Research Infrastructure Action - Structuring.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
Nufact 2008The Beta Beam WP1 Beta beam R&D status Elena Wildner, CERN on behalf of the Beta Beam Study Group EURISOL/Euronu.
Beta Beams Safety issues and WBS E. Benedetto and E. Wildner EUROnu Safety Workshop 9-10 June 2011, CERN Outline Introduction: the Beta Beams Tentative.
Moriond meeting Accelerator based Neutrino beams Mats Lindroos.
Moriond 2003M. Benedikt, S. Hancock Injection and Accumulation in a High Energy Ion Storage Ring Michael Benedikt, Steven Hancock AB Division, CERN.
NuFact'06, Aug. 2006A. Fabich, CERNRadioactive Ion Beams, 1 Radioactive Ion Beams A. Fabich, CERN on behalf of the Beta-beam Study Group
1 Further Demands on beam Intense, Intense, Intense, ….Intense, Intense, Intense, …. –Very far detector, extremely small cross section, search small osci.
European design study on Neutrinofacilities - Euronu within FP7.
Parameters of 2 nd SPL feasibility study A.M.Lombardi (reporting for the working group)
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
Beta-beam study group Letter of Intent beta-beam design study Mats Lindroos On behalf of the Beta-beam working group.
CERN, 18 th Feb. 2004EURISOL - Beta Beam Design StudyM. Benedikt 1 Status of the Beta-Beam in the EURISOL Design Study Michael Benedikt, AB Division, CERN.
F Project X Overview Dave McGinnis October 12, 2007.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
-NUCLEUS INTERACTIONS OPEN QUESTIONS and FUTURE PROJECTS Cristina VOLPE Institut de Physique Nucléaire Orsay, France.
NUFACT05 1 A BASELINE BETA-BEAM Mats Lindroos AB Department, CERN on behalf of the EURISOL Beta-beam task
M. LindroosNUFACT06 School A low energy accumulation ring for the beta-beam Ansgar Simonson, Anders Kaellberg, Mats Lindroos.
05/02/08 EUROnu, Elena Wildner, CERN, 05/02/ EURO Beta Beams Kick-off meeting  Elena Wildner, CERN.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
Mats Lindroos Future R&D: beta-beam Mats Lindroos.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
A new underground laboratory at Frejus Jacques Bouchez CEA-SACLAY NNN05-Aussois April 7, 2005 Historical overview Latest developments Outlook.
J. Bouchez CEA/DAPNIA CHIPP Neuchâtel June 21, 2004 A NEW UNDERGROUND LABORATORY AT FREJUS Motivations and prospects.
Andreas Jansson, Neutrino Workshop, ANL, March 3-4, 2004 Possible beta beam scenario(s) in the US Andreas Jansson Fermilab.
NuFact'06 WG3, Aug. 2006A. Fabich, CERNBeta-beam Ion Losses, 1 The EURISOL Beta-beam Acceleration Scenario: Ion Losses A. Fabich, CERN NuFact’06, UCIrvine.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
J. Bouchez CEA/DAPNIA NuFact 03 June 5,2003 BETA BEAMS : design update and physics reach Physics motivation Recent progress on design Expected performances.
SECONDARY-BEAM PRODUCTION: PROTONS VERSUS HEAVY IONS A. Kelić, S. Lukić, M. V. Ricciardi, K.-H. Schmidt GSI, Darmstadt, Germany  Present knowledge on.
Calculations of Beam Intensities Kick-off meeting, GSI, Task 11 : Calculations of Beam Intensities Kick-off meeting, GSI,
A monochromatic neutrino beam for  13 and  J. Bernabeu U. de Valencia and IFIC NO-VE III International Workshop on: "NEUTRINO OSCILLATIONS IN VENICE"
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe History Aims Structure Some admin Rest of the meeting.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
Jacques Bouchez Radioactive Beams for Nuclear and Neutrino Physics Les Arcs Mars 2003.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
Elena Wildner, CERN Beta Beams GDR Neutrino 20 juin 2012 to 21 juin 2012 at APC, Paris.
Beam Preparation, Task 9 Department of Physics, University of Jyväskylä.
High Power Target Studies at CERN-ISOLDE Tania M. Mendonca, Melanie Delonca, Veronique Ghetta, Etam Noah, Thierry Stora.
Orsay, 03/Feb/05EURISOL - Beta Beam TaskM. Benedikt 1 The Beta-Beam Task Status and Planning 02/2005 to 01/2006 Michael Benedikt AB-Department, CERN.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
EURISOL: European Collaboration towards the ultimate ISOL facility Yorick Blumenfeld IPN – Orsay We acknowledge the financial support of the European Community.
Summary of IAP comments from 2007 EURISOL Town Meeting
The beta-beam Mats Lindroos CERN GSI, 17 January 2005 Mats Lindroos.
A BASELINE BETA-BEAM Mats Lindroos AB Department, CERN
Status of the beta-beam study
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
Elena Wildner, CERN EUROnu meeting Paris June
Future R&D: beta-beam Mats Lindroos Mats Lindroos.
Accelerator R&D for Future Neutrino Projects
Superbeams with SPL at CERN
Status of the BETA-BEAM Task within the EURISOL Design Study
A High Intensity Neutrino Oscillation Facility in Europe
A High Intensity Neutrino Oscillation Facility in Europe
Joint session – Beta-beams
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN

CERN, 15/03/05EURISOL - Beta Beam Task2 Outline EURISOL Task organisation –Overview on beta-beam task –Sub-tasks Work planning and goals by sub-tasks –Participants –Milestones –Deliverables and supporting documentation Prospective hiring and budget Meetings and task status

CERN, 15/03/05EURISOL - Beta Beam Task3 Introduction to beta-beams Beta-beam proposal by Piero Zucchelli –A novel concept for a neutrino factory: the beta-beam, Phys. Let. B, 532 (2002) AIM: production of a pure beam of electron neutrinos (or antineutrinos) through the beta decay of radioactive ions circulating in a high- energy (  ~100) storage ring. The baseline scenario –Avoid anything that requires a “technology jump” which would cost time and money (and be risky) –Make maximum use of the existing infrastructure

CERN, 15/03/05EURISOL - Beta Beam Task4 CERN 1 st beta-beam “study/idea” Two isotopes selected: – 18 Ne 10+, T 1/2 =1.67 seconds, 18 Ne 10+ -> 18 F 9+ + e + +  Q- value = keV – 6 He 2+, T 1/2 =0.8 seconds, 6 He 2+ -> 6 Li 3+ + e - +  Q- value = keV The neutrino beam at the experiment has the “time stamp” of the circulating beam in the decay ring. The beam has to be concentrated in as few and as short bunches as possible to maximize the number of ions/nanosecond for background suppression. –Aim for a duty factor of for the detector.

CERN, 15/03/05EURISOL - Beta Beam Task5 Design Flux The Design Study is aiming for: –A beta-beam facility that will run for 6 months each year or 10 7 seconds per year –An integrated flux of anti-neutrinos ( 6 He) and neutrinos ( 18 Ne) in ten years running at  =100 With an Ion production in the target to the ECR source: 6 He= atoms per second 18 Ne= atoms per second

CERN, 15/03/05EURISOL - Beta Beam Task6 EURISOL DS Future beta-beam R&D together with EURISOL project Design Study in the 6th Framework Programme of the EU The EURISOL Project –Design of an ISOL type (nuclear physics) facility. –Performance three orders of magnitude above todays facilities. –A first feasibility / conceptual design study was done within FP5. –Strong synergies with the beta-beam especially low-energy part: Ion production (proton driver, high power targets). Beam preparation (cleaning, ionization, bunching). First stage acceleration (post accelerator ~100 MeV/u). Radiation protection and safety issues.

CERN, 15/03/05EURISOL - Beta Beam Task7 EURISOL FAIR: Unique Features: ISOL method MWATT targets High energy fragmentation Beta-beam High energy fragmentation: EURISOL high intense easy beam (e.g. 132 Sn) + post-acceleration to GeV region in PS + IF or direct = A major step further towards more exotic nuclei

CERN, 15/03/05EURISOL - Beta Beam Task8 EURISOL

CERN, 15/03/05EURISOL - Beta Beam Task9 EURISOL design study Production of an engineering oriented design of the facility, in particular in relation to its most technologically advanced aspect (i.e., excluding the detailed design of standard elements of the infrastructure). Technical Design Report for EURISOL. Conceptual Design Report for Beta-Beam (first study). Acronym:EURISOL DS Requested budget:9.1 M € Deadline for proposal:4 March 2004 Starting date:1 February 2005 Duration of the project:48 months Coordinating Institution:GANIL (Graziano Fortuna – INFN)

CERN, 15/03/05EURISOL - Beta Beam Task10 General EURISOL for the beta-beam Target tasks: 100 kW and MW targets –CERN Beam preparation: 60 GHz ECR source –IN2P3-LPSC Heavy-ion accelerator: acceleration up to 100 MeV/u –GANIL Physics: Low energy beta-beam –IN2P3-Orsay And more…

CERN, 15/03/05EURISOL - Beta Beam Task11 Overview on Beta-Beam task Neutrino Source Decay Ring Ion production Direct/converter target & ion source Proton Driver Linac Decay ring Br = 1500 Tm B = 5 T C = 7000 m L ss = 2500 m 6 He:  = Ne:  = 250 SPS Acceleration to medium energy Bunching ring and RCS PS Acceleration to final energy PS & SPS Experiment Ion acceleration Post-accelerator Beam preparation 60 GHz ECR pulsed From exit of EURISOL post-accelerator (~100 MeV/u) to Decay Ring (~100 GeV/u).

CERN, 15/03/05EURISOL - Beta Beam Task12 Sub-Tasks Beta-beam task starts at exit of EURISOL post-accelerator. Comprises design of complete accelerator chain up to decay ring. Work is organized in four Sub-Tasks (ST): –ST 1: Parameter definition and evolution of the base line design. –ST 2: Design of low-energy ring(s). –ST 3:Ion acceleration in PS and SPS and new machine designs. –ST 4:Decay ring design

CERN, 15/03/05EURISOL - Beta Beam Task13 ST 1 – Planning 02/05-01/06 ST 1: Parameter definition and evolution of the base line design. –Participants (1.2 MY total): Coordinating Institute: CERN (0.6 MY) IN2P3 (0.1), Stockholm Univ.(0.1), CEA-Saclay (0.2), GSI (0.1), CCLRC RAL (0.1). –Work objectives: Definition of main parameters and confirmation of base line design. Coordination of accelerator sub tasks (ST 2, 3, 4). Coordination with linked EURISOL tasks and outside contributors (TRIUMF). –Milestones: 04/05: preliminary parameter list 10/05: definitive parameter list. –Deliverables: Report with parameter list for the beta-beam accelerator complex.

CERN, 15/03/05EURISOL - Beta Beam Task14 ST 2 – Planning 02/05-01/06 ST 2: Design of low energy rings(s). –Participants (1 MY total): Coordinating Institute: IN2P3 (0.15 MY) CERN (0.4), Stockholm Univ.(0.15), CEA-Saclay (0.3), TRIUMF –Work objectives: Evaluation and choice of low-energy machines (RCS, FFAG, Cyclotron). Optics design for low-energy rings –Milestones: 10/05: choice of low-energy machine(s). –Supporting documentation: Note on comparison of low-energy machine(s). Note on preliminary optics design.

CERN, 15/03/05EURISOL - Beta Beam Task15 ST 3 – Planning 02/05-01/06 ST 3: Ion acceleration in PS and SPS and new machine designs. –Participants (2.85 MY total): Coordinating Institutes: CERN (PS&SPS) (0.8 MY), GSI (new designs) (1.9 MY) CCLRC RAL (0.15), TRIUMF –Work objectives: Simulations of ion acceleration scenarios in PS & SPS (longitudinal & transverse). Parameter definition for new machine to replace PS. Optics design for new PS. –Milestones: 10/05: decision on acceleration scheme for PS & SPS (harmonic number, etc.) 10/05: definition of parameters for new PS –Supporting documentation: Note on ion acceleration in PS and SPS and transverse/longitudinal limitations. Note on parameter choice and preliminary optics design for new PS

CERN, 15/03/05EURISOL - Beta Beam Task16 ST 4 – Planning 02/05-01/06 ST 4: Decay ring design. –Participants (1.8 MY total): Coordinating Institute: CEA-Saclay (1.5 MY) CERN (0.3), TRIUMF –Work objectives: Optics design of the decay ring. Simulations for ion injection and stacking in the decay ring. –Milestones: 10/05: freeze linear optics parameters for decay ring 10/05: decision on feasibility of asymmetric bunch merging as stacking method –Deliverables: Report on preliminary optics design for the decay ring.

CERN, 15/03/05EURISOL - Beta Beam Task17 Task meetings and status Foreseen Meetings –1 st Beta-beam task meeting: 14. April 2005, CERN –2 nd Beta-beam task meeting:17. October 2005, Saclay –Several smaller “working meetings” as needed Status of the beta-beam task –2 task meetings during last year (CERN, RAL) –Work on all sub-tasks started, esp. decay ring design is advancing well –Next steps: Confirmation of beam parameters at high energy with neutrino physicists. Definition of low-energy side with other EURISOL tasks (beam preparation, post accelerator)

CERN, 15/03/05EURISOL - Beta Beam Task18 Flux Talk in nowg on Friday: –Gamma dependence of flux –Optimization schemes for accumulation of radioactive ions –Longer lived isotopes